Job Info for 0520-02-068

County: UPSHUR Highway: SH 155 Date: 05/02/2024 (6 months ago) Engineer's Estimate: $15,830,728 Control Number: 0520-02-068
Project: C 520-2-68 District: ATLANTA Time: 230 WORKING DAYS Type: REHABILITATE EXISTING ROADWAY
Bidder's List
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $15,830,727.81
LONGVIEW BRIDGE AND ROAD, LTD.   $14,945,724.64 1
-5.59% | -$885,003.17
MADDEN CONTRACTING COMPANY, LLC.   $15,744,819.63 2
-0.54% | -$85,908.18
5.35% | $799,094.99
EAST TEXAS BRIDGE, INC.   $15,939,669.20 3
0.69% | $108,941.39
6.65% | $993,944.56
1.24% | $194,849.57
Subcontractor Percentage Amount
STRIPING TECHNOLOGY, L.P. 3.50% $523,100.36
COLD CREEK CONSTRUCTION, LTD 1.97% $294,430.78
TEXCO SERVICES, LLC 0.38% $56,793.75
SOUTHWEST ENVIRONMENT SERVICES LLC 0.33% $49,320.89
CHEROKEE SERVICES 0.19% $28,396.88
KITECO PROPERTY SOLUTIONS INC. 0.15% $22,418.59
FLEX SUPPLY, LLC 0.13% $19,429.44
J. H. ODEN CONTRACTING COMPANY 0.09% $13,451.15
PROFESSIONAL TRAFFIC CONTROL LLC 0.06% $8,967.43
Total: 6.80% $1,016,309.27

Bid Items

Items: 74, 0 filtered
UPSHUR SH 155  |  ATLANTA  |  0520-02-068  |  05/02/2024  |  $15,830,728  |  C 520-2-68  |  REHAB EXIST ROADWAY  |  230 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate LONGVIEW BRIDGE AND ROAD, LTD. MADDEN CONTRACTING COMPANY, LLC. EAST TEXAS BRIDGE, INC.
100 6001 PREPARING ROW AC 1.000 $1.000 $15,000.000 $15,000.000 $25,000.000
100 6002 PREPARING ROW STA 175.000 $5,000.000 $6,000.000 $1,790.000 $2,500.000
104 6054 REMOVING CONCRETE(MOW STRIP) LF 776.000 $9.000 $13.000 $27.000 $20.000
132 6021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 30.000 $40.000 $60.000 $175.000 $70.000
134 6003 BACKFILL (TY C) STA 350.000 $270.000 $560.000 $510.000 $650.000
150 6001 BLADING STA 22.000 $150.000 $340.000 $410.000 $350.000
164 6054 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) SY 24,088.000 $1.000 $0.580 $0.560 $0.650
164 6071 BROADCAST SEED (TEMP)(WARM OR COOL) SY 24,088.000 $0.170 $0.100 $0.090 $0.150
168 6001 VEGETATIVE WATERING MG 385.000 $10.000 $12.000 $19.000 $15.000
275 6001 CEMENT TON 1,469.000 $330.000 $320.000 $265.000 $315.000
275 6039 CEMENT TREAT (EXIST MATL)(DC)(10") SY 56,497.000 $8.000 $4.000 $4.950 $4.750
310 6021 PRIME COAT & BLOTTER (MC-30) GAL 14,124.000 $6.500 $6.000 $7.100 $5.500
316 6017 ASPH (AC-20-5TR) GAL 19,506.000 $7.000 $4.750 $5.100 $5.500
316 6126 AGGR(TY-PB GR-4 SAC-A) CY 387.000 $185.000 $215.000 $192.540 $270.000
351 6013 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") SY 8,370.000 $60.000 $55.000 $62.000 $65.000
354 6057 PLANE ASPH CONC PAV (4") SY 56,497.000 $5.000 $4.000 $5.000 $4.350
354 6100 PLANE ASPH CONC PAV (5") SY 146,194.000 $6.000 $4.250 $7.000 $4.750
400 6008 CUT & RESTORE ASPH PAVING SY 20.000 $172.500 $250.000 $200.000 $125.000
401 6001 FLOWABLE BACKFILL CY 110.000 $436.000 $300.000 $305.000 $400.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 34.000 $750.000 $730.000 $770.000 $850.000
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 620.000 $70.000 $55.000 $44.000 $55.000
464 6003 RC PIPE (CL III)(18 IN) LF 284.000 $66.400 $70.000 $63.750 $65.000
464 6005 RC PIPE (CL III)(24 IN) LF 24.000 $90.000 $100.000 $94.090 $95.000
464 6008 RC PIPE (CL III)(36 IN) LF 28.000 $230.000 $180.000 $209.430 $165.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 71.000 $116.000 $1,000.000 $920.000 $950.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 6.000 $1,500.000 $1,400.000 $1,700.000 $1,400.000
467 6454 SET (TY II) (36 IN) (RCP) (6: 1) (P) EA 2.000 $6,000.000 $5,500.000 $6,245.150 $7,000.000
496 6007 REMOV STR (PIPE) LF 306.000 $19.000 $25.000 $20.000 $25.000
500 6001 MOBILIZATION LS 1.000 $1,424,598.790 $1,350,000.000 $1,314,000.000 $1,370,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 16.000 $10,000.000 $17,500.000 $22,500.000 $30,000.000
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 72,264.000 $0.500 $0.300 $0.450 $0.500
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 500.000 $30.000 $25.000 $22.750 $25.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $1,874.000 $1,800.000 $1,625.000 $1,800.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 500.000 $3.000 $3.500 $3.000 $3.250
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 4.000 $415.000 $165.000 $150.000 $175.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $3,300.000 $3,100.000 $2,825.000 $3,200.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 $275.000 $220.000 $200.000 $225.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 10.000 $785.000 $950.000 $863.000 $950.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1.000 $975.000 $1,000.000 $900.000 $1,050.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 5.000 $1,100.000 $1,275.000 $1,152.000 $1,100.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 30.000 $500.000 $500.000 $455.000 $600.000
644 6061 IN SM RD SN SUP&AM TYTWT(1)WS(T) EA 7.000 $700.000 $530.000 $480.000 $800.000
644 6076 REMOVE SM RD SN SUP&AM EA 17.000 $90.000 $130.000 $117.000 $110.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 22.000 $24.000 $60.000 $45.000 $50.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 12.000 $35.000 $60.000 $45.000 $50.000
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 72,264.000 $0.500 $0.400 $0.350 $0.400
662 6035 WK ZN PAV MRK NON-REMOV (Y)6"(BRK) LF 7,140.000 $2.280 $0.400 $0.350 $0.400
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 86,864.000 $0.500 $0.400 $0.350 $0.400
662 6048 WK ZN PAV MRK REMOV (REFL) TY I-C EA 252.000 $4.600 $5.000 $4.500 $5.000
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 1,086.000 $5.060 $5.000 $4.500 $5.000
662 6064 WK ZN PAV MRK REMOV (W)6"(BRK) LF 5,030.000 $2.280 $2.200 $1.850 $2.200
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 265.000 $1.900 $2.200 $2.000 $2.200
666 6227 PAVEMENT SEALER 10" LF 250.000 $0.500 $2.200 $2.000 $2.200
668 6010 PREFAB PAV MRK TY B (W)(6")(BRK)CNTST LF 125.000 $9.820 $55.000 $50.000 $55.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 17.000 $300.000 $225.000 $205.000 $225.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 2.000 $400.000 $275.000 $250.000 $275.000
668 6108 PREFAB PAV MRK TY C (Y) (24") (SLD) LF 80.000 $25.000 $17.000 $15.000 $16.500
672 6007 REFL PAV MRKR TY I-C EA 517.000 $3.750 $5.000 $4.500 $5.000
672 6009 REFL PAV MRKR TY II-A-A EA 1,346.000 $4.500 $5.000 $4.500 $5.000
677 6002 ELIM EXT PAV MRK & MRKS (6") LF 171,368.000 $0.750 $0.600 $0.550 $0.600
677 6008 ELIM EXT PAV MRK & MRKS (ARROW) EA 11.000 $80.000 $110.000 $100.000 $110.000
677 6012 ELIM EXT PAV MRK & MRKS (WORD) EA 3.000 $86.250 $165.000 $150.000 $165.000
677 6028 ELIM EXT PV MRK & MRKS (RUMBLE STRIP) LF 7,300.000 $1.000 $0.600 $0.550 $0.600
3077 6021 SP MIXES SP-C PG70-22 TON 33,953.000 $150.000 $150.000 $170.000 $165.000
3077 6033 SP MIXES SP-C SAC-A PG76-22 TON 22,296.000 $180.000 $155.000 $172.000 $177.000
3077 6075 TACK COAT GAL 51,986.000 $6.000 $4.500 $4.500 $5.500
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $300.000 $20,000.000 $20,000.000 $25,000.000
6056 6002 PREFORMED CENTERLINE RUMBLE STRIP LF 45,182.000 $5.000 $5.200 $4.700 $5.200
6149 6004 REFL PAV MRK AWT (W) 6" (SLD) (100MIL) LF 72,264.000 $0.750 $0.900 $0.800 $0.900
6149 6005 REFL PAV MRK AWT (W) 6" (BRK) (100MIL) LF 5,040.000 $0.750 $1.100 $1.000 $1.100
6149 6010 REFL PAV MRK AWT (Y) 6" (SLD) (100MIL) LF 57,714.000 $0.750 $0.900 $0.800 $0.900
6149 6011 REFL PAV MRK AWT (Y) 6" (BRK) (100MIL) LF 7,150.000 $0.750 $1.100 $1.000 $1.100
6185 6002 TMA (STATIONARY) DAY 100.000 $150.000 $205.000 $225.000 $250.000
6185 6005 TMA (MOBILE OPERATION) DAY 20.000 $200.000 $300.000 $1.000 $300.000
Totals: $15,830,727.81 $14,945,724.64 $15,744,819.63 $15,939,669.20