Show Job Controls
Bid Cobra

UPSHUR US 271 (0248-04-072)

Items: 111

County: UPSHUR
Length: N/A
Highway: US 271
District: ATLANTA
Control Number: 0248-04-072
DBE Goal: N/A
Project: NH 2020(145)
Guaranty: N/A
Time: 189 WORKING DAYS
Engineer's Estimate: $12,471,734.70
Date: 11/04/2021 (4 years ago)
Contract Number: N/A
Type: REHAB PAVEMENT ON EXISTING 4 LANE HIGHWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$12,471,734.70
$12,013,248.87
Over/Under Est: -3.68% -$458,485.83
Over/Under Est: 3.77% $470,577.55
Amt Left: 7.73% $929,063.38
$13,555,551.58
Over/Under Est: 8.69% $1,083,816.88
Amt Left: 12.84% $1,542,302.71
Delta: -4.74% -$613,239.33
$14,214,677.80
Over/Under Est: 13.98% $1,742,943.10
Amt Left: 18.33% $2,201,428.93
Delta: -4.86% -$659,126.22

Bid Items & Bid Tabulations

111 Total 0 of 111
UPSHUR  |  US 271  |  ATLANTA  |  0248-04-072  |  11/04/2021  |  $12,471,734.70  |  NH 2020(145)  |  REHAB PAVMT ON EXIST 4 LANE HWY  |  189 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MADDEN CONTRACTING COMPANY, LLC.
LONGVIEW BRIDGE AND ROAD, LTD.
EAST TEXAS BRIDGE, INC.
ALTUS CONSTRUCTION LLC
PREPARING ROW
STA 69.200 $2,000.000 $1,450.000 $1,025.000 $2,500.000 $1,078.890
REMOVING CONC (RIPRAP)
SY 157.000 $10.000 $20.000 $34.000 $35.000 $11.840
REMOVING CONC (MEDIANS)
SY 72.000 $15.000 $15.000 $38.000 $35.000 $25.300
REMOVING CONC (DRIVEWAYS)
SY 444.000 $17.500 $15.000 $18.000 $20.000 $17.000
REMOVING CONC (CURB AND GUTTER)
LF 541.000 $8.000 $9.000 $10.000 $10.000 $8.960
REMOVING CONC (FLUME)
SY 41.000 $25.000 $24.000 $32.000 $35.000 $29.550
REMOVING CONCRETE(MOW STRIP)
LF 1,555.000 $10.000 $7.770 $13.750 $15.000 $6.560
EXCAVATION (ROADWAY)
CY 381.000 $9.000 $20.000 $24.000 $20.000 $25.780
SUBGRADE WIDENING (ORD COMP)
STA 33.110 $300.000 $500.000 $375.000 $600.000 $798.120
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 4,224.000 $30.000 $23.000 $16.000 $25.000 $16.300
BACKFILL (TY B)
STA 229.410 $200.000 $247.000 $250.000 $250.000 $171.950
BLOCK SODDING
SY 1,034.000 $4.250 $5.000 $5.000 $7.000 $5.380
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 83,102.000 $0.600 $0.560 $0.650 $0.620 $0.650
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 41,551.000 $0.750 $0.560 $0.660 $0.560 $0.650
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 41,551.000 $0.750 $0.530 $0.630 $0.560 $0.610
VEGETATIVE WATERING
MG 2,676.600 $5.500 $10.000 $1.000 $7.000 $1.170
PRIME COAT (MC-30)
GAL 5,959.000 $4.250 $5.000 $4.400 $6.000 $3.930
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 14,897.000 $130.000 $147.250 $164.000 $160.000 $168.030
TACK COAT
GAL 35,861.000 $3.500 $0.010 $3.500 $3.500 $4.230
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 4,041.000 $45.000 $50.000 $55.000 $65.000 $68.790
PLANE ASPH CONC PAV(0" TO 3")
SY 143,516.000 $2.000 $1.000 $1.150 $2.000 $2.130
PLANE ASPH CONC PAV (3" TO 10")
SY 24,288.000 $5.000 $3.500 $2.000 $5.250 $9.810
CL A CONC (CURB OUTLET)(TY I)
EA 3.000 $1,475.000 $1,000.000 $2,200.000 $2,000.000 $2,101.920
CL A CONC (CURB OUTLET)(TY II)
EA 1.000 $2,000.000 $900.000 $2,200.000 $1,500.000 $2,919.340
RIPRAP (CONC)(4 IN)
CY 24.000 $600.000 $580.000 $490.000 $500.000 $376.560
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 18.000 $158.000 $145.000 $200.000 $200.000 $241.230
RIPRAP (CONC)(FLUME)
CY 3.000 $450.000 $1,000.000 $1,000.000 $1,000.000 $607.220
RIPRAP (MOW STRIP)(4 IN)
CY 161.000 $475.000 $540.000 $510.000 $500.000 $376.560
CLEANING AND SEALING EXISTING JOINTS
LF 3,196.000 $25.000 $19.720 $44.000 $35.000 $23.030
CLEANING AND SEALING JOINTS
LF 3,196.000 $17.500 $15.810 $34.000 $30.000 $19.190
RETROFIT RAIL (TY SSTR)
LF 5,429.600 $190.000 $150.000 $140.000 $110.000 $129.190
RC PIPE (CL III)(18 IN)
LF 179.000 $60.000 $43.000 $50.000 $55.000 $65.290
RC PIPE (CL III)(24 IN)
LF 22.000 $75.000 $70.000 $88.000 $85.000 $227.440
RC PIPE (CL III)(30 IN)
LF 45.000 $100.000 $85.000 $110.000 $125.000 $166.130
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $4,000.000 $6,500.000 $7,000.000 $8,000.000 $7,642.820
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $5,400.000 $8,000.000 $8,800.000 $10,000.000 $10,678.930
INLET (COMPL)(TY AAD)
EA 1.000 $7,500.000 $10,000.000 $7,800.000 $7,000.000 $12,972.360
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $700.000 $700.000 $800.000 $800.000 $1,194.590
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $1,585.000 $1,200.000 $1,200.000 $1,200.000 $2,348.310
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $2,000.000 $1,500.000 $1,500.000 $1,500.000 $2,481.440
REMOV STR (SET)
EA 14.000 $450.000 $150.000 $200.000 $500.000 $271.080
REMOV STR (HEADWALL)
EA 1.000 $1,200.000 $600.000 $500.000 $1,000.000 $2,335.470
REMOV STR (DRIVEWAY CULVERT)
EA 5.000 $540.000 $150.000 $250.000 $600.000 $311.740
MOBILIZATION
LS 1.000 $1,100,000.000 $380,500.000 $900,000.000 $800,000.000 $1,401,281.230
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $8,000.000 $8,000.000 $7,500.000 $12,000.000 $17,516.020
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 24.000 $60.000 $60.000 $66.000 $70.000 $56.140
ROCK FILTER DAMS (REMOVE)
LF 24.000 $10.000 $30.000 $33.000 $20.000 $19.170
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,222.000 $2.750 $3.000 $3.500 $4.000 $1.320
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,222.000 $1.000 $0.750 $0.900 $0.100 $0.750
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 341.000 $10.000 $6.000 $6.600 $8.000 $4.020
BIODEG EROSN CONT LOGS (REMOVE)
LF 341.000 $1.250 $3.000 $3.500 $0.500 $2.550
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,170.000 $22.000 $72.000 $95.000 $90.000 $69.080
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 3,690.000 $6.000 $7.000 $11.000 $6.000 $8.350
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,170.000 $5.750 $15.000 $8.000 $10.000 $10.860
CONC CURB & GUTTER (TY II)
LF 597.000 $28.500 $40.000 $32.000 $45.000 $12.090
INTERSECTIONS (ACP)
SY 366.000 $41.000 $70.000 $75.000 $65.000 $51.870
TURNOUTS (ACP)
SY 155.000 $60.000 $34.000 $80.000 $65.000 $51.870
DRIVEWAYS (ACP)(TYPE 1)
SY 2,782.000 $40.000 $39.000 $34.000 $40.000 $26.720
DRIVEWAYS (CONC)(TYPE 1)
SY 203.000 $80.000 $112.000 $75.000 $105.000 $43.360
DRIVEWAYS (ACP) (TYPE 2)
SY 3,632.000 $30.000 $48.000 $48.000 $60.000 $36.790
INTERSECTIONS (ACP) (TYPE 1)
SY 366.000 $40.000 $70.000 $75.000 $60.000 $22.690
DRIVEWAYS (CONC)(TYPE 2)
SY 241.000 $110.000 $125.000 $80.000 $115.000 $50.140
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 42,368.000 $0.220 $0.250 $0.250 $0.400 $0.120
CONC MEDIAN
SY 74.000 $75.000 $50.000 $100.000 $250.000 $93.610
MTL W-BEAM GD FEN (TIM POST)
LF 2,187.500 $21.000 $25.000 $28.000 $27.000 $21.900
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 16.000 $1,600.000 $1,700.000 $1,870.000 $2,000.000 $1,516.940
REMOVE METAL BEAM GUARD FENCE
LF 1,550.000 $2.450 $2.250 $3.000 $2.500 $2.680
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 16.000 $225.000 $150.000 $165.000 $200.000 $244.620
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $2,630.000 $3,350.000 $3,690.000 $3,700.000 $2,423.390
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $235.000 $200.000 $220.000 $250.000 $285.500
CRASH CUSH ATTEN (MOVE & RESET)
EA 10.000 $1,500.000 $2,000.000 $2,200.000 $2,300.000 $1,440.570
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $850.000 $1,000.000 $1,200.000 $1,200.000 $779.950
CRASH CUSH ATTEN (INSTL)(S)(W)(TL3)
EA 2.000 $7,500.000 $8,500.000 $9,500.000 $10,000.000 $7,391.760
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 32.000 $300.000 $275.000 $300.000 $300.000 $268.800
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 7.000 $295.000 $305.000 $330.000 $400.000 $268.200
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $650.000 $710.000 $800.000 $800.000 $551.440
GROUND BOX TY D (162922)
EA 1.000 $1,000.000 $1,000.000 $1,200.000 $1,200.000 $931.380
REMOVE GROUND BOX
EA 1.000 $300.000 $800.000 $220.000 $500.000 $274.180
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $650.000 $150.000 $175.000 $200.000 $521.500
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 94.000 $26.000 $15.000 $17.000 $25.000 $33.380
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 45.000 $40.000 $35.000 $40.000 $40.000 $28.900
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 11,420.000 $0.250 $0.200 $0.250 $0.220 $0.230
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 45,269.000 $0.200 $0.200 $0.250 $0.220 $0.230
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 114.000 $0.550 $1.000 $1.100 $1.100 $1.170
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 70.000 $1.500 $2.000 $2.250 $2.200 $2.340
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 2.000 $90.000 $100.000 $110.000 $110.000 $116.770
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 2.000 $110.000 $100.000 $110.000 $110.000 $116.770
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 1,560.000 $0.250 $0.200 $0.250 $0.220 $0.230
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 50,250.000 $0.250 $0.200 $0.250 $0.220 $0.230
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 14,154.000 $0.750 $1.000 $1.100 $1.100 $1.170
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,432.000 $1.000 $1.000 $1.200 $1.750 $1.040
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,712.000 $1.000 $1.000 $1.200 $1.750 $1.280
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 5,139.000 $1.000 $1.550 $1.400 $1.750 $1.010
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 19,827.000 $1.000 $1.550 $1.400 $1.750 $1.020
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 114.000 $1.000 $1.000 $1.100 $1.100 $1.170
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 210.000 $12.000 $14.000 $15.500 $16.000 $16.350
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $190.000 $200.000 $270.000 $250.000 $233.550
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $220.000 $300.000 $350.000 $350.000 $350.320
REFL PAV MRKR TY II-A-A
EA 1,067.000 $3.750 $3.350 $3.750 $4.000 $3.910
REFL PAV MRKR TY II-C-R
EA 577.000 $3.750 $3.350 $3.750 $4.000 $3.910
MEMBRANE UNDERSEAL
GAL 42,335.000 $3.000 $3.100 $3.500 $3.500 $4.230
SP MIXES SP-C PG76-22
TON 53,076.000 $110.000 $116.500 $115.000 $123.000 $126.110
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $18,000.000 $18,000.000 $20,000.000 $4,087.070
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 320.000 $3.250 $4.000 $4.500 $4.400 $4.670
PREFORMED CENTERLINE RUMBLE STRIP
LF 3,951.000 $3.500 $4.000 $4.500 $4.400 $4.670
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 45,306.000 $0.550 $0.650 $0.720 $0.720 $0.760
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
LF 11,409.000 $0.600 $0.650 $0.750 $0.720 $0.760
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 50,386.000 $0.530 $0.650 $0.720 $0.720 $0.760
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
LF 1,541.000 $0.560 $0.650 $0.720 $0.720 $0.760
TMA (STATIONARY)
DAY 242.000 $175.000 $150.000 $200.000 $200.000 $175.160
TMA (MOBILE OPERATION)
HR 224.000 $45.000 $1.000 $25.000 $30.000 $87.580
Totals: $12,471,734.700 $12,013,248.870 $12,942,312.250 $13,555,551.580 $14,214,677.827