|
|
PREPARING ROW
|
STA
|
79.080
|
$2,000.000
|
$3,375.000
|
$2,000.000
|
$9,000.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,500.000
|
$8.000
|
$4.250
|
$5.000
|
$6.650
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
110.000
|
$30.000
|
$45.000
|
$38.000
|
$52.000
|
|
|
BACKFILL (TY C)
|
STA
|
155.000
|
$300.000
|
$286.000
|
$300.000
|
$635.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
26,848.000
|
$0.200
|
$0.120
|
$0.150
|
$0.130
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
26,848.000
|
$0.200
|
$0.090
|
$0.100
|
$0.100
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
53,697.000
|
$1.500
|
$0.550
|
$0.650
|
$0.640
|
|
|
VEGETATIVE WATERING
|
MG
|
859.000
|
$20.000
|
$5.000
|
$8.000
|
$15.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
833.000
|
$2.000
|
$1.740
|
$2.000
|
$2.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
2,926.000
|
$3.250
|
$5.670
|
$3.250
|
$5.800
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
13,005.000
|
$5.000
|
$4.050
|
$4.500
|
$5.450
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
226.000
|
$100.000
|
$331.500
|
$200.000
|
$192.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
16,177.000
|
$70.000
|
$49.750
|
$63.000
|
$56.700
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
3,467.000
|
$4.000
|
$1.150
|
$3.290
|
$2.320
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
17,081.000
|
$3.500
|
$4.750
|
$2.940
|
$2.150
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
32,512.000
|
$4.000
|
$4.500
|
$2.650
|
$3.450
|
|
|
PLANE ASPH CONC PAV (1 1/4")
|
SY
|
64,707.000
|
$4.000
|
$1.150
|
$1.550
|
$1.750
|
|
|
FULL - DEPTH REPAIR CPJR (8")
|
SY
|
120.000
|
$200.000
|
$149.000
|
$255.000
|
$325.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
85.000
|
$575.000
|
$482.000
|
$735.000
|
$555.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$730,000.000
|
$439,500.000
|
$700,000.000
|
$600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$10,000.000
|
$7,500.000
|
$2,950.000
|
$11,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
500.000
|
$35.000
|
$34.000
|
$39.000
|
$37.400
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
500.000
|
$8.000
|
$10.000
|
$11.000
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,500.000
|
$6.000
|
$3.200
|
$3.450
|
$3.520
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,500.000
|
$1.200
|
$1.000
|
$1.000
|
$1.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
100.000
|
$7.000
|
$15.000
|
$15.000
|
$16.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
100.000
|
$1.500
|
$10.000
|
$10.000
|
$11.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
4,470.000
|
$0.300
|
$1.500
|
$2.000
|
$2.050
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,350.000
|
$25.000
|
$22.500
|
$26.000
|
$24.750
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,700.000
|
$1,450.000
|
$1,700.000
|
$1,595.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,350.000
|
$5.000
|
$2.250
|
$2.500
|
$2.500
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$275.000
|
$150.000
|
$175.000
|
$165.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,500.000
|
$2,750.000
|
$3,200.000
|
$3,025.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$275.000
|
$200.000
|
$233.000
|
$220.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,800.000
|
$1,000.000
|
$1,200.000
|
$1,100.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$30,000.000
|
$26,900.000
|
$32,000.000
|
$29,590.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$800.000
|
$806.000
|
$940.000
|
$660.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,200.000
|
$1,086.000
|
$1,250.000
|
$792.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
22.000
|
$470.000
|
$434.000
|
$500.000
|
$792.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
3.000
|
$850.000
|
$560.000
|
$650.000
|
$792.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
42.000
|
$105.000
|
$89.000
|
$100.000
|
$132.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$90.000
|
$45.000
|
$53.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
9,180.000
|
$0.500
|
$1.000
|
$0.550
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
100.000
|
$3.000
|
$6.000
|
$7.000
|
$6.600
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
9,180.000
|
$0.600
|
$1.000
|
$0.550
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
2,550.000
|
$1.500
|
$3.500
|
$4.000
|
$3.850
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
71,280.000
|
$1.500
|
$0.010
|
$1.450
|
$2.500
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
50,960.000
|
$1.500
|
$0.010
|
$1.450
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,430.000
|
$2.700
|
$1.000
|
$1.150
|
$1.100
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
100.000
|
$2.700
|
$5.000
|
$5.850
|
$5.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
726.000
|
$7.000
|
$6.000
|
$7.000
|
$6.600
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
325.000
|
$6.000
|
$6.000
|
$7.000
|
$6.600
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
765.000
|
$13.000
|
$13.000
|
$15.000
|
$14.300
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
15.000
|
$300.000
|
$205.000
|
$240.000
|
$225.500
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
4.000
|
$580.000
|
$300.000
|
$350.000
|
$330.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
5.000
|
$350.000
|
$255.000
|
$300.000
|
$280.500
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
14.000
|
$33.000
|
$65.000
|
$76.000
|
$71.500
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
264.000
|
$14.000
|
$13.000
|
$15.000
|
$14.300
|
|
REFL PAV MRKR TY I-C
|
EA
|
516.000
|
$4.400
|
$3.600
|
$4.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,033.000
|
$4.400
|
$3.600
|
$4.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
42,650.000
|
$1.500
|
$0.480
|
$0.550
|
$0.550
|
|
|
SP MIXES SP-D SAC-A PG70-22
|
TON
|
4,449.000
|
$175.000
|
$144.000
|
$151.000
|
$145.000
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
14,247.000
|
$170.000
|
$142.250
|
$150.000
|
$144.000
|
|
|
TACK COAT
|
GAL
|
45,426.000
|
$4.500
|
$0.010
|
$3.350
|
$5.400
|
|
|
CEMENT
|
TON
|
159.000
|
$300.000
|
$195.000
|
$295.000
|
$290.000
|
|
|
EMULSION
|
GAL
|
141,428.000
|
$4.500
|
$3.870
|
$3.750
|
$4.650
|
|
|
EMUL TRTMNT (MX EXIST MATL) 10"
|
SY
|
32,512.000
|
$7.000
|
$9.750
|
$7.300
|
$5.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$500.000
|
$1,900.210
|
$550.000
|
$305.000
|
|
|
INSTALL FTB
|
LF
|
1,500.000
|
$75.000
|
$58.000
|
$33.000
|
$63.800
|
|
|
REMOVE FTB
|
LF
|
1,500.000
|
$30.000
|
$8.000
|
$6.000
|
$8.800
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$20,000.000
|
$17,000.000
|
$8,500.000
|
$24,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
4,470.000
|
$3.790
|
$4.200
|
$5.000
|
$4.650
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
41,310.000
|
$0.600
|
$0.650
|
$0.750
|
$0.750
|
|
|
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
|
LF
|
10,340.000
|
$0.600
|
$0.650
|
$0.750
|
$0.750
|
|
|
REFL PAV MRK AWT (W) 6" (DOT) (100MIL)
|
LF
|
200.000
|
$1.100
|
$1.000
|
$1.150
|
$1.100
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
41,310.000
|
$0.500
|
$0.650
|
$0.750
|
$0.750
|
|
|
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
|
LF
|
4,760.000
|
$0.600
|
$0.650
|
$0.750
|
$0.750
|
|
|
TMA (STATIONARY)
|
DAY
|
149.000
|
$300.000
|
$150.000
|
$90.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
13.000
|
$300.000
|
$0.010
|
$90.000
|
$200.000
|
|
Totals: |
$8,086,312.600
|
$6,277,174.340
|
$6,894,560.970
|
$7,714,881.710
|