Job Info for 1584-01-031

County: TYLER Highway: FM 1745 Date: 08/02/2023 (1 year ago) Engineer's Estimate: $12,891,431 Control Number: 1584-01-031
Project: F 2B23(155) District: BEAUMONT Time: 346 WORKING DAYS Type: SURFACING/ROADWAY RESTORATION
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $12,891,431.31
DREWERY CONSTRUCTION COMPANY, INCORPORATED   $19,340,199.01 1
50.02% | $6,448,767.70
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 20.99% $4,059,507.77
J & M CONTRACTING, COMPANY 3.55% $686,577.06
DREWERY BROS. TREE SERVICE, INC. 2.73% $527,987.43
TRP CONSTRUCTION GROUP, LLC 1.68% $324,915.34
ROWC ENERGY SERVICES, LLC 1.55% $299,773.08
AMERICAN REMEDIATION OPTIONS, INC. 1.46% $282,366.91
PANOLA SIGN & BARRICADE, INC. 0.30% $58,020.60
FREDONIA SERVICES LLC 0.23% $44,482.46
WEST TEXAS ROCK RESOURCES, LLC 0.13% $25,142.26
FREDONIA SERVICES LLC 0.10% $19,340.20
CHEROKEE SERVICES 0.08% $15,472.16
(INACTIVE)FREDONIA CONSTRUCTION SERVICES 0.00% $0.00
Total: 32.80% $6,343,585.27

Bid Items

Items: 72, 0 filtered
TYLER FM 1745  |  BEAUMONT  |  1584-01-031  |  08/02/2023  |  $12,891,431  |  F 2B23(155)  |  SURF/ROADWAY RESTOR  |  346 WORKING DAYS
Alt Item code Description Unit Quantity Engineer's Estimate DREWERY CONSTRUCTION COMPANY, INCORPORATED
100 6002 PREPARING ROW STA 718.650 $100.000 $995.000
104 6009 REMOVING CONC (RIPRAP) SY 964.000 $19.000 $20.000
112 6002 SUBGRADE WIDENING (DENS CONT) STA 718.650 $800.000 $750.000
134 6002 BACKFILL (TY B) STA 718.650 $322.000 $195.000
164 6021 CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY 49,645.000 $1.000 $0.450
164 6023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 16,549.000 $0.540 $0.450
164 6029 CELL FBR MLCH SEED(TEMP)(WARM) SY 33,097.000 $0.500 $0.430
164 6031 CELL FBR MLCH SEED(TEMP)(COOL) SY 33,097.000 $0.440 $0.430
168 6001 VEGETATIVE WATERING MG 557.000 $14.000 $40.000
247 6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY 31,274.000 $70.000 $191.500
251 6066 REWORK BS MATL (TY C)(9")(ORD COMP) SY 207,611.000 $2.500 $2.500
275 6001 CEMENT TON 2,927.000 $250.000 $345.000
275 6020 CEMENT TREAT (MX EXST MTL & NW BS)(9") SY 207,611.000 $2.000 $5.700
316 6029 ASPH (RC-250) GAL 74,740.000 $5.700 $5.600
316 6210 AGGR(TY-L GR-5 SAC-B) CY 1,597.000 $235.000 $235.000
400 6005 CEM STABIL BKFL CY 22.000 $123.000 $290.000
420 6076 CL E CONC (SEAL SLAB) CY 55.000 $500.000 $460.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 40.000 $174.000 $400.000
438 6008 CLEANING AND SEALING JOINTS (CL 7) LF 280.000 $37.000 $72.000
462 6051 CONC BOX CULV (5 FT X 3 FT)(EXTEND) LF 12.000 $1,200.000 $1,200.000
462 6052 CONC BOX CULV (5 FT X 4 FT)(EXTEND) LF 20.000 $820.000 $1,400.000
462 6072 CONC BOX CULV (9 FT X 9 FT)(EXTEND) LF 32.000 $1,480.000 $2,900.000
466 6186 WINGWALL (PW - 2) (HW=11 FT) EA 2.000 $70,200.000 $69,000.000
467 6177 SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C) EA 6.000 $7,920.000 $11,500.000
467 6182 SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C) EA 10.000 $13,160.000 $17,500.000
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 16.000 $1,860.000 $2,300.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 16.000 $1,800.000 $3,500.000
496 6006 REMOV STR (HEADWALL) EA 6.000 $2,600.000 $2,300.000
500 6001 MOBILIZATION LS 1.000 $1,350,000.000 $1,650,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 24.000 $6,000.000 $4,300.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 460.000 $57.000 $49.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 460.000 $18.000 $9.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 3,660.000 $5.800 $6.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 3,660.000 $1.550 $1.150
530 6004 DRIVEWAYS (CONC) SY 23.000 $170.000 $290.000
530 6005 DRIVEWAYS (ACP) SY 3,771.000 $45.000 $47.000
530 6006 DRIVEWAYS (SURF TREAT) SY 1,896.000 $50.000 $78.000
530 6008 TURNOUTS (ACP) SY 2,153.000 $80.000 $90.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 143,730.000 $0.150 $0.200
533 6002 RUMBLE STRIPS (CENTERLINE) LF 71,865.000 $0.210 $0.200
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 900.000 $27.000 $30.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 8.000 $2,240.000 $3,400.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 2,160.000 $4.900 $10.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 16.000 $268.000 $345.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 8.000 $255.000 $500.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 8.000 $3,165.000 $3,400.000
560 6004 MAILBOX INSTALL-S (TWG-POST) TY 2 EA 46.000 $270.000 $260.000
560 6005 MAILBOX INSTALL-D (TWG-POST) TY 2 EA 6.000 $270.000 $290.000
560 6006 MAILBOX INSTALL-M (TWG-POST) TY 2 EA 4.000 $520.000 $615.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 150.000 $540.000 $500.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 4.000 $820.000 $820.000
644 6027 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 10.000 $760.000 $970.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 2.000 $1,290.000 $1,120.000
644 6076 REMOVE SM RD SN SUP&AM EA 166.000 $105.000 $150.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 12.000 $33.000 $29.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 22.000 $39.000 $43.000
658 6100 INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) EA 54.000 $82.500 $120.000
662 6035 WK ZN PAV MRK NON-REMOV (Y)6"(BRK) LF 17,840.000 $0.400 $0.600
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 206,748.000 $0.470 $0.620
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 8,089.000 $1.550 $1.700
666 6308 RE PM W/RET REQ TY I (W)6"(SLD)(090MIL) LF 143,618.000 $0.570 $0.850
666 6317 RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL) LF 8,920.000 $0.520 $0.900
666 6320 RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL) LF 103,374.000 $0.610 $0.850
672 6009 REFL PAV MRKR TY II-A-A EA 1,813.000 $5.640 $6.910
685 6002 RELOCATE RDSD FLASH BEACON ASSEMBLY EA 2.000 $3,300.000 $9,200.000
3077 6021 SP MIXES SP-C PG70-22 TON 23,460.000 $170.000 $187.000
3077 6075 TACK COAT GAL 12,457.000 $4.370 $6.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $15,000.000 $20,000.000
6185 6002 TMA (STATIONARY) DAY 313.000 $225.000 $270.000
6185 6005 TMA (MOBILE OPERATION) DAY 33.000 $540.000 $55.000
1 464 6005 RC PIPE (CL III)(24 IN) LF 218.000 $122.000 $200.000
1A 4216 6002 THERMOPLASTIC PIPE (PP) (24") LF 218.000 $122.000 $0.000
Totals: $12,918,027.31 $19,340,199.01