TYLER US 287 (0341-04-072)

Items: 49

County: TYLER
Length: N/A
Highway: US 287
District: BEAUMONT
Control Number: 0341-04-072
DBE Goal: N/A
Project: STP 2022(536)
Guaranty: N/A
Time: 119 WORKING DAYS
Engineer's Estimate: $3,662,431.60
Date: 05/05/2022 (4 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$3,662,431.60
$3,362,371.31
Over/Under Est: -8.19% -$300,060.29
Over/Under Est: 8.68% $317,819.82
Amt Left: 18.38% $617,880.11
$4,125,068.72
Over/Under Est: 12.63% $462,637.12
Amt Left: 22.68% $762,697.41
Delta: -3.64% -$144,817.30

Bid Items & Bid Tabulations

49 Total 0 of 49
TYLER  |  US 287  |  BEAUMONT  |  0341-04-072  |  05/05/2022  |  $3,662,431.60  |  STP 2022(536)  |  SURF/ROADWAY RESTOR  |  119 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PINTO CONSTRUCTION CO., INC.
TEXAS MATERIALS GROUP, INC.
A. L. HELMCAMP, INC.
BACKFILL (TY A OR B)
STA 113.300 $350.000 $389.370 $690.870 $300.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 10,480.000 $1.000 $0.370 $0.370 $0.370
VEGETATIVE WATERING
MG 88.000 $50.000 $0.010 $1,699.460 $30.000
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 53,289.000 $5.000 $3.140 $6.450 $3.000
FOG SEAL (CSS-1H)
GAL 3,731.000 $8.000 $8.150 $5.400 $6.500
PLANE ASPH CONC PAV(0" TO 2")
SY 12,769.000 $4.000 $2.630 $7.240 $4.500
RIPRAP (MOW STRIP)(4 IN)
CY 75.000 $700.000 $630.000 $685.840 $770.000
MOBILIZATION
LS 1.000 $471,447.600 $310,000.000 $138,686.850 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $6,000.000 $2,482.260 $12,815.540 $8,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,500.000 $5.000 $3.000 $3.140 $3.140
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,500.000 $1.000 $1.000 $1.100 $1.100
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,000.000 $5.000 $5.780 $6.050 $6.050
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $1.000 $1.050 $1.100 $1.100
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 1,342.000 $75.000 $34.390 $52.350 $90.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 19,668.000 $1.000 $0.330 $0.180 $0.340
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 9,934.000 $1.000 $0.330 $0.180 $0.340
MTL W-BEAM GD FEN (TIM POST)
LF 1,075.000 $40.000 $39.020 $32.450 $32.450
MTL THRIE-BEAM GD FEN (TIM POST)
EA 8.000 $2,000.000 $2,346.750 $2,018.500 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 1,075.000 $4.000 $2.630 $2.750 $2.750
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $250.000 $262.500 $275.000 $275.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $250.000 $262.500 $275.000 $275.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,750.000 $2,971.500 $3,113.000 $3,100.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 18.000 $225.000 $257.250 $269.500 $270.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 2.000 $300.000 $262.500 $275.000 $275.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $20.000 $22.580 $23.650 $25.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 24.000 $20.000 $22.580 $23.650 $25.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 704.000 $0.500 $0.530 $0.550 $0.550
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 23,580.000 $0.500 $0.470 $0.550 $0.500
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 2,430.000 $0.500 $0.530 $0.530 $0.550
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 14,350.000 $0.500 $0.470 $0.530 $0.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 605.000 $1.500 $1.580 $0.610 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,629.000 $1.500 $1.580 $0.630 $0.750
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 704.000 $1.000 $0.630 $0.920 $0.660
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 23,580.000 $1.000 $0.620 $0.920 $0.650
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 2,430.000 $1.000 $0.630 $0.900 $0.660
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 14,350.000 $1.000 $0.620 $0.900 $0.650
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 42.000 $16.000 $21.000 $49.500 $22.000
REFL PAV MRKR TY I-C
EA 36.000 $5.000 $8.400 $8.800 $8.800
REFL PAV MRKR TY II-A-A
EA 285.000 $5.000 $8.400 $8.800 $8.800
D-GR HMA TY-C PG70-22
TON 5,712.000 $110.000 $137.720 $143.170 $140.000
TACK COAT
GAL 3,116.000 $5.000 $5.510 $3.100 $6.000
SP MIXES SP-C SAC-A PG76-22
TON 6,742.000 $120.000 $133.270 $156.030 $145.000
TACK COAT
GAL 3,678.000 $5.000 $5.510 $3.100 $6.000
CEMENT
TON 209.000 $275.000 $223.020 $220.000 $200.000
EMULSION
GAL 170,525.000 $3.500 $3.020 $3.300 $4.000
EMUL TRTMNT (MX EXST MTRL) 8"
SY 53,289.000 $3.500 $3.000 $3.950 $7.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $10,000.000 $19,052.000 $15,000.000
TMA (STATIONARY)
DAY 92.000 $300.000 $200.000 $5.980 $500.000
TMA (MOBILE OPERATION)
DAY 26.000 $300.000 $50.000 $84.620 $500.000
Totals: $3,662,431.600 $3,362,371.311 $3,980,251.421 $4,125,068.720