PREPARING ROW
|
STA
|
1,003.000
|
$8,000.000
|
$20,684.780
|
$5,000.000
|
$23,100.000
|
$26,300.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
701.000
|
$10.000
|
$7.860
|
$12.650
|
$140.000
|
$15.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,600.000
|
$19.000
|
$7.860
|
$7.360
|
$60.000
|
$15.000
|
|
|
REMOVING STAB BASE & ASPH PAV(15"-20")
|
SY
|
26,876.000
|
$12.000
|
$3.450
|
$4.340
|
$10.500
|
$12.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
243,373.000
|
$10.000
|
$2.080
|
$4.340
|
$5.500
|
$34.000
|
|
|
REMOVING UNTREATED BASE (4")
|
SY
|
8,953.000
|
$3.000
|
$2.500
|
$4.590
|
$4.000
|
$2.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
447,441.000
|
$10.000
|
$7.110
|
$10.570
|
$12.000
|
$25.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
14,925.000
|
$32.000
|
$20.800
|
$20.300
|
$15.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
582,550.000
|
$8.000
|
$12.000
|
$10.850
|
$16.000
|
$20.000
|
|
|
EROSION CONTROL COMPOST
|
CY
|
4,843.000
|
$27.000
|
$69.860
|
$69.860
|
$69.750
|
$69.860
|
|
|
GENERAL USE COMPOST
|
CY
|
4,843.000
|
$30.000
|
$68.760
|
$68.760
|
$68.750
|
$68.760
|
|
|
STRAW OR HAY MULCH
|
SY
|
132,978.000
|
$2.000
|
$0.450
|
$0.450
|
$0.450
|
$0.450
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
376,845.000
|
$0.100
|
$0.490
|
$0.490
|
$0.500
|
$0.490
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
376,845.000
|
$0.100
|
$0.490
|
$0.490
|
$0.500
|
$0.490
|
|
|
BROADCAST SEED (PERM)(SPECIAL MIX)
|
SY
|
132,978.000
|
$0.450
|
$2.060
|
$2.060
|
$2.050
|
$2.060
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
476,467.000
|
$0.150
|
$0.600
|
$0.600
|
$0.600
|
$0.600
|
|
|
VEGETATIVE WATERING
|
MG
|
9,523.000
|
$27.000
|
$69.670
|
$36.970
|
$77.750
|
$50.000
|
|
|
WILDFLOWER SEEDING (MIX 1)
|
AC
|
78.000
|
$1,775.000
|
$3,306.040
|
$3,306.040
|
$3,310.000
|
$3,306.040
|
|
|
PLANT MATERIAL (5-GAL)
|
EA
|
1,245.000
|
$27.000
|
$221.070
|
$221.070
|
$221.000
|
$221.070
|
|
|
PLANT MATERIAL (5 GAL) (TREE)
|
EA
|
6,507.000
|
$23.000
|
$164.630
|
$164.630
|
$165.000
|
$164.630
|
|
|
PLANT MATERIAL (15 GAL) (TREE)
|
EA
|
23,861.000
|
$130.000
|
$501.110
|
$501.110
|
$501.000
|
$501.110
|
|
|
PLANT BED PREP (TYPE II)
|
SY
|
54,464.000
|
$0.750
|
$4.460
|
$4.460
|
$4.450
|
$4.460
|
|
|
CONC LNDSCP EDG (12 IN WIDTH)
|
LF
|
11,923.000
|
$33.000
|
$34.400
|
$57.440
|
$20.400
|
$50.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
26,876.000
|
$25.000
|
$43.450
|
$30.610
|
$28.100
|
$20.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
362.000
|
$295.700
|
$482.960
|
$431.460
|
$2,000.000
|
$400.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
571,763.000
|
$5.000
|
$2.240
|
$3.900
|
$2.500
|
$3.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
62,057.000
|
$6.000
|
$4.220
|
$8.180
|
$2.000
|
$4.500
|
|
|
CEM TRT(PLNT MX) (CL L)(TYA)(GR1-2)(6")
|
SY
|
544,887.000
|
$30.850
|
$12.000
|
$28.430
|
$30.000
|
$15.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
108,947.000
|
$8.500
|
$2.910
|
$5.250
|
$5.500
|
$5.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (8")
|
SY
|
9,845.000
|
$100.000
|
$133.530
|
$114.370
|
$65.000
|
$95.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
493,939.000
|
$50.000
|
$72.850
|
$111.200
|
$72.000
|
$88.500
|
|
|
CEM STABIL BKFL
|
CY
|
238.000
|
$75.000
|
$148.410
|
$634.440
|
$420.000
|
$400.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
1,891.000
|
$180.000
|
$219.950
|
$217.310
|
$200.000
|
$250.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
26,968.000
|
$15.290
|
$4.100
|
$1.000
|
$5.000
|
$15.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
10,518.000
|
$145.000
|
$140.000
|
$149.600
|
$205.000
|
$200.000
|
|
|
PRESTR CONC PIL (20 IN SQ)
|
LF
|
2,775.000
|
$160.000
|
$190.000
|
$203.160
|
$275.000
|
$200.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
720.000
|
$65.000
|
$90.040
|
$64.480
|
$70.000
|
$200.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
4,900.000
|
$160.000
|
$172.270
|
$176.330
|
$125.000
|
$500.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
9,011.000
|
$200.000
|
$209.850
|
$254.760
|
$150.000
|
$550.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
7,011.000
|
$250.000
|
$272.110
|
$330.530
|
$370.000
|
$600.000
|
|
|
CL C CONC (ABUT)
|
CY
|
816.500
|
$1,000.000
|
$1,200.000
|
$1,250.000
|
$2,000.000
|
$2,000.000
|
|
|
CL C CONC (CAP)
|
CY
|
925.000
|
$1,200.000
|
$1,200.000
|
$1,500.000
|
$3,000.000
|
$2,700.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
322.000
|
$1,300.000
|
$1,300.000
|
$1,725.000
|
$5,000.000
|
$2,600.000
|
|
|
REINF CONC SLAB
|
SF
|
22,330.500
|
$26.000
|
$16.000
|
$25.830
|
$15.000
|
$32.000
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
210,239.000
|
$20.000
|
$16.000
|
$16.860
|
$15.000
|
$21.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
61,968.000
|
$20.000
|
$16.000
|
$12.000
|
$5.000
|
$27.000
|
|
|
APPROACH SLAB
|
CY
|
1,315.000
|
$550.000
|
$400.000
|
$676.900
|
$650.000
|
$500.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
45,502.000
|
$40.000
|
$70.000
|
$76.860
|
$79.000
|
$100.000
|
|
|
PRESTR CONC BOX BEAM (4B20)
|
LF
|
1,578.500
|
$350.000
|
$300.000
|
$379.290
|
$220.000
|
$140.000
|
|
|
PRESTR CONC BOX BEAM (5B20)
|
LF
|
1,435.000
|
$400.000
|
$300.000
|
$379.910
|
$220.000
|
$140.000
|
|
|
PRESTR CONC BOX BEAM (4B40)
|
LF
|
38,030.800
|
$220.000
|
$300.000
|
$355.430
|
$550.000
|
$200.000
|
|
|
PRESTR CONC BOX BEAM (5B40)
|
LF
|
6,708.800
|
$290.000
|
$300.000
|
$357.390
|
$600.000
|
$200.000
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
5,587.100
|
$200.000
|
$300.000
|
$227.000
|
$100.000
|
$300.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
5,757.000
|
$240.000
|
$300.000
|
$382.430
|
$100.000
|
$300.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
2,686.000
|
$175.000
|
$300.000
|
$365.070
|
$175.000
|
$125.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
352.050
|
$700.000
|
$400.000
|
$550.890
|
$509.000
|
$750.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
2,132.000
|
$220.000
|
$424.060
|
$296.160
|
$402.000
|
$300.000
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
5,002.000
|
$185.000
|
$327.530
|
$301.230
|
$391.000
|
$300.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
4,802.400
|
$200.000
|
$288.070
|
$266.340
|
$381.000
|
$300.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
462.600
|
$600.000
|
$460.580
|
$734.360
|
$491.000
|
$750.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
6,372.000
|
$6.000
|
$12.880
|
$24.240
|
$25.000
|
$20.000
|
|
|
RAIL (TY T402)
|
LF
|
12,175.000
|
$100.000
|
$118.000
|
$207.000
|
$170.000
|
$225.000
|
|
|
RAIL (TY C411)
|
LF
|
300.000
|
$430.000
|
$240.180
|
$194.100
|
$420.000
|
$750.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
955.000
|
$140.000
|
$178.000
|
$181.850
|
$155.000
|
$200.000
|
|
|
RAIL(PEDESTRIAN)(SPL)
|
LF
|
2,507.000
|
$75.000
|
$172.000
|
$371.160
|
$150.000
|
$330.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
627.000
|
$75.000
|
$194.720
|
$89.430
|
$165.000
|
$175.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
1,451.400
|
$185.000
|
$283.560
|
$201.730
|
$230.000
|
$250.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
296.000
|
$300.000
|
$312.290
|
$342.360
|
$265.000
|
$559.500
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
142.000
|
$350.000
|
$425.080
|
$430.780
|
$375.000
|
$659.500
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
438.000
|
$430.000
|
$458.780
|
$445.920
|
$420.000
|
$684.500
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
931.000
|
$380.000
|
$465.640
|
$446.790
|
$440.000
|
$709.500
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
387.000
|
$700.000
|
$555.400
|
$568.470
|
$450.000
|
$809.500
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
569.000
|
$480.000
|
$580.730
|
$565.330
|
$500.000
|
$859.500
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
1,164.000
|
$500.000
|
$638.150
|
$620.630
|
$515.000
|
$1,009.500
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
58.000
|
$700.000
|
$950.890
|
$839.400
|
$680.000
|
$1,259.500
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
1,183.000
|
$600.000
|
$941.580
|
$862.970
|
$715.000
|
$1,559.500
|
|
|
CONC BOX CULV (9 FT X 8 FT)
|
LF
|
63.000
|
$700.000
|
$1,341.870
|
$1,258.010
|
$1,000.000
|
$2,359.500
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
120.000
|
$900.000
|
$569.250
|
$1,736.310
|
$560.000
|
$1,059.500
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
313.000
|
$600.000
|
$530.250
|
$515.530
|
$425.000
|
$809.500
|
|
|
CONC BOX CULV (10 FT X 4 FT)
|
LF
|
159.000
|
$1,200.000
|
$1,265.760
|
$1,123.210
|
$990.000
|
$2,159.500
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
800.000
|
$95.000
|
$97.350
|
$98.160
|
$86.000
|
$124.500
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
4,793.000
|
$200.000
|
$110.790
|
$134.510
|
$98.000
|
$184.500
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
2,003.000
|
$120.000
|
$133.960
|
$147.740
|
$110.000
|
$239.500
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
2,296.000
|
$150.000
|
$171.680
|
$176.390
|
$145.000
|
$284.500
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
20.000
|
$800.000
|
$488.330
|
$358.530
|
$300.000
|
$509.500
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
1.000
|
$7,800.000
|
$10,269.570
|
$11,973.350
|
$11,500.000
|
$8,528.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
2.000
|
$7,700.000
|
$8,471.070
|
$7,457.850
|
$8,000.000
|
$6,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 54 IN)
|
EA
|
2.000
|
$21,000.000
|
$7,741.760
|
$21,551.240
|
$9,200.000
|
$18,000.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
1.000
|
$18,000.000
|
$13,671.200
|
$18,640.190
|
$18,600.000
|
$14,000.000
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
1.000
|
$12,500.000
|
$15,361.270
|
$25,532.900
|
$19,000.000
|
$22,000.000
|
|
|
WINGWALL (FW - S) (HW=3 FT)
|
EA
|
6.000
|
$11,000.000
|
$5,420.760
|
$12,800.360
|
$18,900.000
|
$4,500.000
|
|
|
WINGWALL (FW - S) (HW=4 FT)
|
EA
|
7.000
|
$12,000.000
|
$6,010.260
|
$20,284.390
|
$17,800.000
|
$8,500.000
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
4.000
|
$13,000.000
|
$8,220.910
|
$19,333.660
|
$21,600.000
|
$11,000.000
|
|
|
WINGWALL (FW - S) (HW=6 FT)
|
EA
|
3.000
|
$14,000.000
|
$12,034.720
|
$32,857.110
|
$22,200.000
|
$16,000.000
|
|
|
WINGWALL (PW - 1) (HW=11 FT)
|
EA
|
2.000
|
$44,400.000
|
$62,368.740
|
$102,299.030
|
$44,900.000
|
$105,000.000
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
2.000
|
$13,700.000
|
$5,806.870
|
$12,572.710
|
$17,500.000
|
$10,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
3.000
|
$22,000.000
|
$25,932.970
|
$25,876.370
|
$24,000.000
|
$22,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$24,000.000
|
$40,462.420
|
$34,348.220
|
$24,000.000
|
$35,000.000
|
|
|
WINGWALL (SW - 0) (HW=3 FT)
|
EA
|
10.000
|
$13,200.000
|
$4,803.890
|
$11,336.380
|
$14,800.000
|
$5,500.000
|
|
|
WINGWALL (SW - 0) (HW=4 FT)
|
EA
|
1.000
|
$15,500.000
|
$7,137.360
|
$12,046.460
|
$23,850.000
|
$8,000.000
|
|
|
WINGWALL (SW - 0) (HW=6 FT)
|
EA
|
4.000
|
$10,500.000
|
$11,454.370
|
$13,362.120
|
$26,000.000
|
$12,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
4.000
|
$11,400.000
|
$12,053.390
|
$17,181.300
|
$13,000.000
|
$14,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
21.000
|
$1,200.000
|
$2,533.160
|
$1,841.120
|
$1,300.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,750.000
|
$2,868.040
|
$1,835.280
|
$1,500.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,300.000
|
$4,169.620
|
$2,101.550
|
$1,650.000
|
$2,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
204.000
|
$2,300.000
|
$3,481.610
|
$2,186.660
|
$1,650.000
|
$2,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
66.000
|
$2,800.000
|
$6,110.820
|
$3,433.460
|
$2,500.000
|
$3,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
54.000
|
$6,500.000
|
$10,343.190
|
$5,957.710
|
$5,150.000
|
$5,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
42.000
|
$1,900.000
|
$3,829.460
|
$3,662.420
|
$3,000.000
|
$2,000.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
12.000
|
$9,000.000
|
$1,606.380
|
$5,231.100
|
$0.010
|
$3,044.540
|
|
|
REMOV STR (SET)
|
EA
|
118.000
|
$575.000
|
$643.670
|
$292.520
|
$750.000
|
$100.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$780.000
|
$2,574.670
|
$4,680.430
|
$5,000.000
|
$2,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
22.000
|
$2,600.000
|
$2,574.670
|
$4,680.430
|
$5,000.000
|
$2,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
3,238.000
|
$17.000
|
$14.360
|
$34.660
|
$22.000
|
$50.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
1,634.000
|
$58.500
|
$37.440
|
$63.410
|
$0.010
|
$300.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
4.000
|
$25,000.000
|
$65,860.000
|
$9,164.000
|
$50,000.000
|
$15,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
6.000
|
$50,000.000
|
$65,860.000
|
$31,856.380
|
$50,000.000
|
$20,000.000
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
1.000
|
$250,000.000
|
$65,860.000
|
$34,366.900
|
$500,000.000
|
$193,021.000
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
1.000
|
$375,000.000
|
$65,860.000
|
$228,769.260
|
$1,000,000.000
|
$250,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$13,600,000.000
|
$18,694,576.000
|
$17,669,744.760
|
$23,000,000.000
|
$29,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
47.000
|
$5,500.000
|
$2,335.950
|
$15,705.990
|
$50,000.000
|
$50,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
900.000
|
$30.000
|
$50.000
|
$50.000
|
$152.000
|
$60.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,993.000
|
$45.000
|
$70.000
|
$70.000
|
$163.000
|
$64.500
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
125.000
|
$55.000
|
$100.000
|
$100.000
|
$145.000
|
$90.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,918.000
|
$10.000
|
$18.000
|
$18.000
|
$44.500
|
$9.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
4,029.000
|
$35.000
|
$45.000
|
$45.000
|
$45.250
|
$38.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
3,634.000
|
$10.000
|
$15.000
|
$15.000
|
$13.500
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
59,615.000
|
$3.000
|
$4.000
|
$4.000
|
$3.750
|
$2.850
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
52,917.000
|
$1.600
|
$1.000
|
$1.000
|
$0.950
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
29,460.000
|
$6.000
|
$10.000
|
$10.000
|
$8.200
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
25,980.000
|
$1.250
|
$2.000
|
$2.000
|
$0.950
|
$1.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
18,028.000
|
$40.000
|
$91.420
|
$63.980
|
$50.000
|
$65.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
16,799.000
|
$10.000
|
$3.330
|
$7.520
|
$10.000
|
$7.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
19,071.000
|
$18.000
|
$8.910
|
$8.810
|
$15.000
|
$5.000
|
|
|
CONC CURB (TY F2)
|
LF
|
28.000
|
$150.000
|
$460.580
|
$395.880
|
$500.000
|
$600.000
|
|
|
CONC CURB (TY F3)
|
LF
|
487.000
|
$170.000
|
$208.120
|
$321.060
|
$200.000
|
$300.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
9,964.000
|
$45.000
|
$34.610
|
$113.940
|
$47.250
|
$92.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
62,057.000
|
$50.000
|
$61.760
|
$80.740
|
$70.000
|
$75.000
|
|
|
CURB RAMPS (TY 10) (MOD)
|
EA
|
9.000
|
$1,400.000
|
$1,784.750
|
$3,473.170
|
$3,000.000
|
$3,500.000
|
|
|
RUMBLE STRIPS (SHOULDER) CONCRETE
|
LF
|
98,443.000
|
$0.500
|
$0.630
|
$0.900
|
$2.550
|
$1.250
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,556.000
|
$27.250
|
$31.670
|
$33.500
|
$25.000
|
$27.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$760.000
|
$1,082.190
|
$1,300.000
|
$745.000
|
$1,150.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
61.000
|
$1,950.000
|
$2,082.020
|
$1,800.000
|
$1,940.000
|
$1,850.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
43.000
|
$1,600.000
|
$1,333.460
|
$1,600.000
|
$1,490.000
|
$1,400.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,000.000
|
$3.000
|
$3.700
|
$4.000
|
$1.500
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
43.000
|
$3,000.000
|
$3,250.780
|
$1,600.000
|
$2,900.000
|
$2,750.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$200.000
|
$338.910
|
$250.000
|
$200.000
|
$450.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
84.000
|
$2,500.000
|
$1,752.610
|
$2,500.000
|
$12,500.000
|
$1,900.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
62.000
|
$1,500.000
|
$907.980
|
$750.000
|
$2,500.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
|
EA
|
1.000
|
$3,800.000
|
$78,186.590
|
$64,000.000
|
$68,400.000
|
$71,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
35.000
|
$12,750.000
|
$8,245.730
|
$8,875.000
|
$9,480.000
|
$8,350.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
106.000
|
$250.000
|
$242.830
|
$450.000
|
$232.000
|
$250.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
3,367.000
|
$20.000
|
$16.000
|
$38.000
|
$16.000
|
$16.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
309.000
|
$300.000
|
$450.000
|
$775.000
|
$450.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
55.000
|
$450.000
|
$550.000
|
$945.000
|
$550.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$725.000
|
$1,107.000
|
$725.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
1.000
|
$1,200.000
|
$900.000
|
$1,300.000
|
$900.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,250.000
|
$775.000
|
$1,290.000
|
$775.000
|
$775.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
10.000
|
$1,300.000
|
$800.000
|
$1,390.000
|
$800.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
8.000
|
$1,400.000
|
$825.000
|
$1,360.000
|
$825.000
|
$825.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
224,468.000
|
$0.500
|
$1.500
|
$0.500
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
4,342.000
|
$1.500
|
$2.750
|
$2.750
|
$2.750
|
$2.750
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
1,069.000
|
$5.000
|
$6.000
|
$9.500
|
$9.500
|
$9.500
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
32.000
|
$198.000
|
$275.000
|
$225.000
|
$225.000
|
$225.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
32.000
|
$200.000
|
$300.000
|
$225.000
|
$225.000
|
$225.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
258,912.000
|
$0.500
|
$1.500
|
$0.500
|
$0.500
|
$0.500
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
3,706.000
|
$1.500
|
$3.000
|
$0.850
|
$0.850
|
$0.850
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
46,006.000
|
$1.000
|
$2.750
|
$1.500
|
$1.500
|
$1.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
175.000
|
$10.000
|
$6.000
|
$9.500
|
$9.500
|
$9.500
|
|
|
PAVEMENT SEALER 6"
|
LF
|
247,269.000
|
$0.150
|
$0.300
|
$0.280
|
$0.300
|
$0.280
|
|
|
PAVEMENT SEALER 8"
|
LF
|
46,006.000
|
$0.250
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
|
|
PAVEMENT SEALER 24"
|
LF
|
883.000
|
$1.000
|
$1.000
|
$6.250
|
$6.250
|
$6.250
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
146.000
|
$10.000
|
$25.000
|
$55.000
|
$55.000
|
$55.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
115.000
|
$10.000
|
$30.000
|
$65.000
|
$65.000
|
$65.000
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
30.000
|
$120.000
|
$30.000
|
$50.000
|
$50.000
|
$50.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
312.000
|
$1.000
|
$10.000
|
$70.000
|
$70.000
|
$70.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
24,954.000
|
$0.500
|
$0.850
|
$0.850
|
$0.850
|
$0.850
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
112,915.000
|
$0.500
|
$0.800
|
$0.850
|
$0.850
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
786.000
|
$1.000
|
$0.850
|
$1.150
|
$1.150
|
$1.150
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
104,908.000
|
$0.500
|
$0.800
|
$0.850
|
$0.850
|
$0.850
|
|
PRE PM TY B(ACC PRK)(BL&WH)(W/BORDR)LG
|
EA
|
9.000
|
$500.000
|
$1,000.000
|
$650.000
|
$650.000
|
$650.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
631.000
|
$15.000
|
$15.000
|
$28.000
|
$28.000
|
$28.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
146.000
|
$200.000
|
$250.000
|
$350.000
|
$350.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
115.000
|
$250.000
|
$350.000
|
$550.000
|
$550.000
|
$550.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
312.000
|
$40.000
|
$50.000
|
$98.000
|
$98.000
|
$98.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
252.000
|
$10.500
|
$15.000
|
$37.000
|
$37.000
|
$37.000
|
|
PREFAB PAV MRK TY C(EVAC SYM, BLUE/WHT)
|
EA
|
21.000
|
$506.000
|
$1,800.000
|
$1,950.000
|
$1,950.000
|
$1,950.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
2,320.000
|
$5.250
|
$6.000
|
$4.500
|
$4.500
|
$4.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
4,937.000
|
$6.500
|
$6.000
|
$4.500
|
$4.500
|
$4.500
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
247,269.000
|
$0.250
|
$0.100
|
$0.250
|
$0.250
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
46,006.000
|
$0.500
|
$0.150
|
$0.400
|
$0.400
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
883.000
|
$2.000
|
$0.400
|
$12.000
|
$12.000
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
146.000
|
$35.000
|
$7.000
|
$30.000
|
$30.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
115.000
|
$28.000
|
$15.000
|
$30.000
|
$30.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
30.000
|
$50.000
|
$30.000
|
$50.000
|
$50.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
312.000
|
$13.000
|
$8.000
|
$45.000
|
$45.000
|
$45.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
48.000
|
$75.000
|
$1,500.000
|
$1,304.360
|
$100.000
|
$300.000
|
|
|
STRIP MOWING - TRACT (14)
|
AC
|
74.000
|
$2,500.000
|
$1,500.000
|
$1,304.360
|
$100.000
|
$500.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
102.000
|
$2,500.000
|
$2,900.000
|
$1,304.360
|
$7,500.000
|
$2,500.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
27.000
|
$250.000
|
$5,000.000
|
$1,029.830
|
$1,500.000
|
$3,900.000
|
|
|
LANDSCAPE AMENITY (TY 1)
|
EA
|
1.000
|
$79,000.000
|
$231,160.000
|
$28,484.460
|
$260,000.000
|
$300,000.000
|
|
|
LANDSCAPE AMENITY (TY 2)
|
EA
|
2.000
|
$43,250.000
|
$65,000.000
|
$23,615.200
|
$45,000.000
|
$130,000.000
|
|
|
LANDSCAPE AMENITY (TY 3)
|
EA
|
3.000
|
$50,000.000
|
$286,298.330
|
$38,193.930
|
$260,000.000
|
$325,000.000
|
|
|
LANDSCAPE AMENITY (TY 4)
|
EA
|
4.000
|
$5,300.000
|
$60,000.000
|
$7,959.090
|
$20,000.000
|
$80,000.000
|
|
|
LANDSCAPE AMENITY (TY 5)
|
EA
|
16.000
|
$33,000.000
|
$207,249.280
|
$31,520.130
|
$50,000.000
|
$65,000.000
|
|
|
LANDSCAPE AMENITY (TY 6)
|
EA
|
3.000
|
$240,000.000
|
$365,864.170
|
$127,953.190
|
$250,000.000
|
$500,000.000
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
|
CY
|
15.000
|
$225.000
|
$403.290
|
$403.290
|
$403.000
|
$3,000.000
|
|
|
LANDSCAPE SOIL AMENDMENT (TYPE I)
|
SY
|
361,989.000
|
$0.300
|
$1.070
|
$1.070
|
$1.050
|
$1.500
|
|
|
LANDSCAPE SOIL AMENDMENT (TYPE II)
|
SY
|
192,357.000
|
$0.300
|
$0.990
|
$0.990
|
$1.000
|
$1.500
|
|
|
LANDSCAPE SOIL AMENDMENT (TYPE III)
|
SY
|
20,634.000
|
$0.860
|
$1.320
|
$1.320
|
$1.300
|
$1.500
|
|
|
LANDSCAPE SOIL AMENDMENT (TYPE IV)
|
SY
|
29,655.000
|
$35.000
|
$1.360
|
$1.360
|
$1.350
|
$1.500
|
|
|
LANDSCAPE SOIL AMENDMENT (TYPE V)
|
SY
|
11,679.000
|
$0.350
|
$1.470
|
$1.470
|
$1.450
|
$1.500
|
|
|
TACK COAT
|
GAL
|
54,497.000
|
$3.000
|
$11.740
|
$4.500
|
$4.750
|
$5.000
|
|
|
D-GR HMA TY-D PG 64-22 (EXEMPT)
|
TON
|
34,501.000
|
$195.930
|
$292.670
|
$150.000
|
$158.000
|
$181.000
|
|
|
PED STL TRUSS BRG SPAN (45 FT)
|
EA
|
2.000
|
$110,800.000
|
$112,505.110
|
$130,926.490
|
$110,000.000
|
$260,000.000
|
|
|
PED STL TRUSS BRG SPAN (50 FT)
|
EA
|
6.000
|
$114,000.000
|
$108,390.210
|
$126,336.110
|
$125,000.000
|
$260,000.000
|
|
|
PED STL TRUSS BRG SPAN (60 FT)
|
EA
|
17.000
|
$129,600.000
|
$124,829.150
|
$147,805.200
|
$150,000.000
|
$260,000.000
|
|
|
WHEEL STOPS
|
EA
|
15.000
|
$200.000
|
$5,482.420
|
$100.000
|
$500.000
|
$2,000.000
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
2.000
|
$7,500.000
|
$22,000.000
|
$2,500.000
|
$25,000.000
|
$19,000.000
|
|
|
CCTV FIELD CONTROLLER
|
EA
|
2.000
|
$670.000
|
$14,500.000
|
$5,000.000
|
$16,480.000
|
$11,500.000
|
|
|
ITS RADIO (SNGL)(5 GHZ)-I-U
|
EA
|
2.000
|
$4,415.000
|
$16,427.000
|
$7,500.000
|
$18,670.000
|
$14,000.000
|
|
|
SPS-INS (80W)1920W (1000AH) 4X50A(3)
|
EA
|
2.000
|
$2,000.000
|
$50,000.000
|
$7,500.000
|
$56,800.000
|
$37,500.000
|
|
|
ITS POLE (45 FT)(130 MPH)
|
EA
|
2.000
|
$18,000.000
|
$27,709.000
|
$12,500.000
|
$31,490.000
|
$25,098.000
|
|
|
ITS POLE MNT CAB (TY 3)(CONF 2)
|
EA
|
2.000
|
$8,700.000
|
$17,711.000
|
$7,500.000
|
$20,130.000
|
$14,850.000
|
|
|
TMA (STATIONARY)
|
DAY
|
720.000
|
$265.000
|
$165.850
|
$309.210
|
$430.000
|
$228.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
720.000
|
$450.000
|
$552.830
|
$692.060
|
$796.000
|
$627.000
|
|
|
WATER MAIN PIPE (PVC) (6IN) (C-900)
|
LF
|
26,474.000
|
$95.580
|
$75.000
|
$72.740
|
$52.000
|
$72.990
|
|
|
CASING STEEL (18IN)
|
LF
|
1,176.000
|
$282.640
|
$533.000
|
$230.260
|
$194.000
|
$136.500
|
|
|
JCK TUN BOR OR AUG WTR MAIN (PVC) (6IN)
|
LF
|
846.000
|
$65.440
|
$66.000
|
$309.220
|
$419.000
|
$390.000
|
|
|
SERVICE LINE (SHORT SIDE) (5/8" TO 1")
|
EA
|
56.000
|
$1,895.000
|
$2,185.000
|
$2,257.660
|
$2,660.000
|
$911.610
|
|
|
SERVICE LINE (LONG SIDE) (5/8" TO 1")
|
EA
|
14.000
|
$2,400.000
|
$6,123.000
|
$4,843.730
|
$6,920.000
|
$4,360.710
|
|
|
BLOW OFF VALVE (PERM ANGLE) (2IN)
|
EA
|
2.000
|
$2,145.000
|
$7,700.000
|
$1,937.010
|
$10,090.000
|
$3,630.000
|
|
|
WATER METER BOX
|
EA
|
70.000
|
$50.000
|
$309.000
|
$496.590
|
$1,310.000
|
$120.000
|
|
|
REMOVE EXIST WATER PIPE(VAR)(SIZE)(MTL)
|
LF
|
39,957.000
|
$35.000
|
$30.000
|
$12.870
|
$28.100
|
$17.500
|
|
|
INSTALL 4" PE GAS VALVE
|
EA
|
31.000
|
$200.000
|
$8,500.000
|
$900.000
|
$657.000
|
$900.000
|
|
|
INSTALL 2" PE GAS VALVE
|
EA
|
1.000
|
$75.000
|
$7,700.000
|
$750.000
|
$265.000
|
$600.000
|
|
|
INSTALL 4" X 4" GAS TEE
|
EA
|
2.000
|
$18.500
|
$7,500.000
|
$550.000
|
$152.000
|
$1,200.000
|
|
|
INSTALL 4" X 2" GAS TEE
|
EA
|
1.000
|
$9.500
|
$7,500.000
|
$1,200.000
|
$152.000
|
$1,000.000
|
|
|
INSTALL 4" GAS LINE VERTICAL BEND
|
EA
|
1.000
|
$13.500
|
$8,000.000
|
$1,200.000
|
$354.000
|
$1,000.000
|
|
|
INSTALL 2" GAS LINE VERTICAL BEND
|
EA
|
1.000
|
$5.000
|
$7,500.000
|
$1,200.000
|
$303.000
|
$1,000.000
|
|
|
INSTALL 4" GAS LINE BY DIRECTIONAL BORE
|
LF
|
602.000
|
$66.000
|
$120.000
|
$23.000
|
$202.000
|
$165.000
|
|
|
INSTALL CUT & PLUG OF GAS LINE
|
EA
|
1.000
|
$75.000
|
$8,000.000
|
$8,750.000
|
$11,120.000
|
$2,500.000
|
|
|
2" PE 2708 GAS LINE
|
LF
|
486.000
|
$1.500
|
$100.000
|
$12.000
|
$128.000
|
$32.000
|
|
|
4" PE 2708 GAS LINE
|
LF
|
30,198.000
|
$4.250
|
$75.000
|
$18.000
|
$46.500
|
$38.000
|
|
|
DRY BORE & STEEL ENCASEMENT
|
LF
|
264.000
|
$66.000
|
$250.000
|
$48.000
|
$523.000
|
$425.000
|
|
|
REMOVE & DISPOSE GAS LINE
|
LF
|
240.000
|
$5.000
|
$40.000
|
$20.000
|
$109.000
|
$38.000
|
|
Totals: |
$158,459,712.440
|
$205,416,129.850
|
$214,134,329.994
|
$235,571,594.610
|
$262,518,491.980
|