Show Job Controls
Bid Cobra

TYLER US 69 (0200-08-049)

Items: 246

County: TYLER
Length: N/A
Highway: US 69
District: BEAUMONT
Control Number: 0200-08-049
DBE Goal: N/A
Project: C 200-8-49
Guaranty: N/A
Time: 705 WORKING DAYS
Engineer's Estimate: $158,459,712.44
Date: 09/06/2023 (2 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
DAVE COLLINS
RICHARD BRADLEY
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$158,459,712.44
$205,416,129.83
Over/Under Est: 29.63% $46,956,417.39
Over/Under Est: 35.13% $55,674,617.52
Amt Left: 4.24% $8,718,200.13
$235,571,594.61
Over/Under Est: 48.66% $77,111,882.17
Amt Left: 14.68% $30,155,464.78
Delta: -10.01% -$21,437,264.65
Over/Under Est: 65.67% $104,058,779.54
Amt Left: 27.8% $57,102,362.15
Delta: -11.44% -$26,946,897.37
Subcontractor Percentage Amount
MCNEIL BROTHERS, INC. 6.97% $15,521,771.91
EAGLE CONSTRUCTION LLC 5.41% $12,047,745.49
GMJ PAVING COMPANY LLC 2.90% $6,458,126.05
EASTEX UTILITY CONSTRUCTION, LLC 1.55% $3,451,757.02
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 1.44% $3,206,793.62
TEXAS STERLING CONSTRUCTION CO. 1.40% $3,117,716.02
WEBER-BALKE FOUNDATION COMPANY, INC 0.89% $1,981,976.61
WAMPOLE MILLER, INC. 0.69% $1,536,588.61
QUALITY TURF FARMS, L.C. 0.68% $1,514,319.21
PRIME TREES INC. 0.67% $1,492,049.81
BATTERSON, LLP 0.61% $1,358,433.41
TEXAS STEEL INDUSTRIAL PLACING, LLC 0.58% $1,291,625.21
LONG LEGACY ENTERPRISES, LLC 0.55% $1,224,817.01
A&J REBAR LLC 0.46% $1,024,392.41
PERFORMANCE EQUIPMENT SERVICE 0.27% $601,273.80
CLEARVIEW CLEARING & SITE SERVICE, INC 0.20% $445,388.00
SK CONCRETE SERVICES LLC 0.19% $423,118.60
JB PINNACLE GROUP, LLC 0.15% $334,041.00
KELLER NORTH AMERICA, INC. 0.13% $289,502.20
VALLEY PLACERS, LLC 0.12% $267,232.80
JOHN WRIGHT CONSTRUCTION 0.12% $267,232.80
JT UNDERGROUND AND UTILITY CONSTRUCTION INC 0.11% $244,963.40
TIGER CREEK ENTERPRISES, INC. 0.02% $44,538.80
G & T TRAFFIC SOLUTIONS, LLC 0.00% $0.00
EPCS ENVIRONMENTAL LLC 0.00% $0.00
TEXAS STEEL INDUSTRIAL PLACING, CONCRETE DIVISION LLC 0.00% $0.00
EAS-TEX CONTRACTORS, INC. 0.00% $0.00
GEORGE MEEKS LANDPRO, INC. 0.00% $0.00
Total: 26.11% $58,145,403.79

Bid Items & Bid Tabulations

246 Total 0 of 246
TYLER  |  US 69  |  BEAUMONT  |  0200-08-049  |  09/06/2023  |  $158,459,712.44  |  C 200-8-49  |  WIDEN ROAD - ADD LANES  |  705 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PULICE CONSTRUCTION, INC.
JAMES CONSTRUCTION GROUP, LLC
WEBBER, LLC
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
PREPARING ROW
STA 1,003.000 $8,000.000 $20,684.780 $5,000.000 $23,100.000 $26,300.000
REMOVING CONC (PAV)
SY 701.000 $10.000 $7.860 $12.650 $140.000 $15.000
REMOVING CONC (RIPRAP)
SY 1,600.000 $19.000 $7.860 $7.360 $60.000 $15.000
REMOVING STAB BASE & ASPH PAV(15"-20")
SY 26,876.000 $12.000 $3.450 $4.340 $10.500 $12.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 243,373.000 $10.000 $2.080 $4.340 $5.500 $34.000
REMOVING UNTREATED BASE (4")
SY 8,953.000 $3.000 $2.500 $4.590 $4.000 $2.500
EXCAVATION (ROADWAY)
CY 447,441.000 $10.000 $7.110 $10.570 $12.000 $25.000
EXCAVATION (CHANNEL)
CY 14,925.000 $32.000 $20.800 $20.300 $15.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 582,550.000 $8.000 $12.000 $10.850 $16.000 $20.000
EROSION CONTROL COMPOST
CY 4,843.000 $27.000 $69.860 $69.860 $69.750 $69.860
GENERAL USE COMPOST
CY 4,843.000 $30.000 $68.760 $68.760 $68.750 $68.760
STRAW OR HAY MULCH
SY 132,978.000 $2.000 $0.450 $0.450 $0.450 $0.450
CELL FBR MLCH SEED(TEMP)(WARM)
SY 376,845.000 $0.100 $0.490 $0.490 $0.500 $0.490
CELL FBR MLCH SEED(TEMP)(COOL)
SY 376,845.000 $0.100 $0.490 $0.490 $0.500 $0.490
BROADCAST SEED (PERM)(SPECIAL MIX)
SY 132,978.000 $0.450 $2.060 $2.060 $2.050 $2.060
DRILL SEEDING (PERM)(WARM OR COOL)
SY 476,467.000 $0.150 $0.600 $0.600 $0.600 $0.600
VEGETATIVE WATERING
MG 9,523.000 $27.000 $69.670 $36.970 $77.750 $50.000
WILDFLOWER SEEDING (MIX 1)
AC 78.000 $1,775.000 $3,306.040 $3,306.040 $3,310.000 $3,306.040
PLANT MATERIAL (5-GAL)
EA 1,245.000 $27.000 $221.070 $221.070 $221.000 $221.070
PLANT MATERIAL (5 GAL) (TREE)
EA 6,507.000 $23.000 $164.630 $164.630 $165.000 $164.630
PLANT MATERIAL (15 GAL) (TREE)
EA 23,861.000 $130.000 $501.110 $501.110 $501.000 $501.110
PLANT BED PREP (TYPE II)
SY 54,464.000 $0.750 $4.460 $4.460 $4.450 $4.460
CONC LNDSCP EDG (12 IN WIDTH)
LF 11,923.000 $33.000 $34.400 $57.440 $20.400 $50.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 26,876.000 $25.000 $43.450 $30.610 $28.100 $20.000
LIME (HYD, COM, OR QK(SLURRY))
TON 362.000 $295.700 $482.960 $431.460 $2,000.000 $400.000
LIME TRT (SUBGRADE)(8")
SY 571,763.000 $5.000 $2.240 $3.900 $2.500 $3.000
LIME TRT (SUBGRADE)(6")
SY 62,057.000 $6.000 $4.220 $8.180 $2.000 $4.500
CEM TRT(PLNT MX) (CL L)(TYA)(GR1-2)(6")
SY 544,887.000 $30.850 $12.000 $28.430 $30.000 $15.000
PRIME COAT (AE-P)
GAL 108,947.000 $8.500 $2.910 $5.250 $5.500 $5.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 9,845.000 $100.000 $133.530 $114.370 $65.000 $95.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 493,939.000 $50.000 $72.850 $111.200 $72.000 $88.500
CEM STABIL BKFL
CY 238.000 $75.000 $148.410 $634.440 $420.000 $400.000
FLOWABLE BACKFILL
CY 1,891.000 $180.000 $219.950 $217.310 $200.000 $250.000
TRENCH EXCAVATION PROTECTION
LF 26,968.000 $15.290 $4.100 $1.000 $5.000 $15.000
PRESTR CONC PIL (18 IN SQ)
LF 10,518.000 $145.000 $140.000 $149.600 $205.000 $200.000
PRESTR CONC PIL (20 IN SQ)
LF 2,775.000 $160.000 $190.000 $203.160 $275.000 $200.000
DRILL SHAFT (18 IN)
LF 720.000 $65.000 $90.040 $64.480 $70.000 $200.000
DRILL SHAFT (30 IN)
LF 4,900.000 $160.000 $172.270 $176.330 $125.000 $500.000
DRILL SHAFT (36 IN)
LF 9,011.000 $200.000 $209.850 $254.760 $150.000 $550.000
DRILL SHAFT (42 IN)
LF 7,011.000 $250.000 $272.110 $330.530 $370.000 $600.000
CL C CONC (ABUT)
CY 816.500 $1,000.000 $1,200.000 $1,250.000 $2,000.000 $2,000.000
CL C CONC (CAP)
CY 925.000 $1,200.000 $1,200.000 $1,500.000 $3,000.000 $2,700.000
CL C CONC (COLUMN)
CY 322.000 $1,300.000 $1,300.000 $1,725.000 $5,000.000 $2,600.000
REINF CONC SLAB
SF 22,330.500 $26.000 $16.000 $25.830 $15.000 $32.000
REINF CONC SLAB (BOX BEAM)
SF 210,239.000 $20.000 $16.000 $16.860 $15.000 $21.000
REINF CONC SLAB (SLAB BEAM)
SF 61,968.000 $20.000 $16.000 $12.000 $5.000 $27.000
APPROACH SLAB
CY 1,315.000 $550.000 $400.000 $676.900 $650.000 $500.000
RETAINING WALL (MSE)
SF 45,502.000 $40.000 $70.000 $76.860 $79.000 $100.000
PRESTR CONC BOX BEAM (4B20)
LF 1,578.500 $350.000 $300.000 $379.290 $220.000 $140.000
PRESTR CONC BOX BEAM (5B20)
LF 1,435.000 $400.000 $300.000 $379.910 $220.000 $140.000
PRESTR CONC BOX BEAM (4B40)
LF 38,030.800 $220.000 $300.000 $355.430 $550.000 $200.000
PRESTR CONC BOX BEAM (5B40)
LF 6,708.800 $290.000 $300.000 $357.390 $600.000 $200.000
PRESTR CONC SLAB BEAM (4SB15)
LF 5,587.100 $200.000 $300.000 $227.000 $100.000 $300.000
PRESTR CONC SLAB BEAM (5SB15)
LF 5,757.000 $240.000 $300.000 $382.430 $100.000 $300.000
PRESTR CONC GIRDER (TX40)
LF 2,686.000 $175.000 $300.000 $365.070 $175.000 $125.000
RIPRAP (CONC)(5 IN)
CY 352.050 $700.000 $400.000 $550.890 $509.000 $750.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 2,132.000 $220.000 $424.060 $296.160 $402.000 $300.000
RIPRAP (STONE PROTECTION)(15 IN)
CY 5,002.000 $185.000 $327.530 $301.230 $391.000 $300.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 4,802.400 $200.000 $288.070 $266.340 $381.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 462.600 $600.000 $460.580 $734.360 $491.000 $750.000
STR STEEL (MISC NON - BRIDGE)
LB 6,372.000 $6.000 $12.880 $24.240 $25.000 $20.000
RAIL (TY T402)
LF 12,175.000 $100.000 $118.000 $207.000 $170.000 $225.000
RAIL (TY C411)
LF 300.000 $430.000 $240.180 $194.100 $420.000 $750.000
RAIL (HANDRAIL)(TY F)
LF 955.000 $140.000 $178.000 $181.850 $155.000 $200.000
RAIL(PEDESTRIAN)(SPL)
LF 2,507.000 $75.000 $172.000 $371.160 $150.000 $330.000
ARMOR JOINT (SEALED)
LF 627.000 $75.000 $194.720 $89.430 $165.000 $175.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 1,451.400 $185.000 $283.560 $201.730 $230.000 $250.000
CONC BOX CULV (3 FT X 2 FT)
LF 296.000 $300.000 $312.290 $342.360 $265.000 $559.500
CONC BOX CULV (4 FT X 4 FT)
LF 142.000 $350.000 $425.080 $430.780 $375.000 $659.500
CONC BOX CULV (5 FT X 2 FT)
LF 438.000 $430.000 $458.780 $445.920 $420.000 $684.500
CONC BOX CULV (5 FT X 3 FT)
LF 931.000 $380.000 $465.640 $446.790 $440.000 $709.500
CONC BOX CULV (5 FT X 5 FT)
LF 387.000 $700.000 $555.400 $568.470 $450.000 $809.500
CONC BOX CULV (6 FT X 3 FT)
LF 569.000 $480.000 $580.730 $565.330 $500.000 $859.500
CONC BOX CULV (6 FT X 4 FT)
LF 1,164.000 $500.000 $638.150 $620.630 $515.000 $1,009.500
CONC BOX CULV (8 FT X 4 FT)
LF 58.000 $700.000 $950.890 $839.400 $680.000 $1,259.500
CONC BOX CULV (8 FT X 5 FT)
LF 1,183.000 $600.000 $941.580 $862.970 $715.000 $1,559.500
CONC BOX CULV (9 FT X 8 FT)
LF 63.000 $700.000 $1,341.870 $1,258.010 $1,000.000 $2,359.500
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 120.000 $900.000 $569.250 $1,736.310 $560.000 $1,059.500
CONC BOX CULV (6 FT X 2 FT)
LF 313.000 $600.000 $530.250 $515.530 $425.000 $809.500
CONC BOX CULV (10 FT X 4 FT)
LF 159.000 $1,200.000 $1,265.760 $1,123.210 $990.000 $2,159.500
RC PIPE (CL III)(18 IN)
LF 800.000 $95.000 $97.350 $98.160 $86.000 $124.500
RC PIPE (CL III)(24 IN)
LF 4,793.000 $200.000 $110.790 $134.510 $98.000 $184.500
RC PIPE (CL III)(30 IN)
LF 2,003.000 $120.000 $133.960 $147.740 $110.000 $239.500
RC PIPE (CL III)(36 IN)
LF 2,296.000 $150.000 $171.680 $176.390 $145.000 $284.500
RC PIPE (CL III)(54 IN)
LF 20.000 $800.000 $488.330 $358.530 $300.000 $509.500
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
EA 1.000 $7,800.000 $10,269.570 $11,973.350 $11,500.000 $8,528.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 2.000 $7,700.000 $8,471.070 $7,457.850 $8,000.000 $6,500.000
HEADWALL (CH - PW - S) (DIA= 54 IN)
EA 2.000 $21,000.000 $7,741.760 $21,551.240 $9,200.000 $18,000.000
WINGWALL (FW - 0) (HW=6 FT)
EA 1.000 $18,000.000 $13,671.200 $18,640.190 $18,600.000 $14,000.000
WINGWALL (FW - 0) (HW=7 FT)
EA 1.000 $12,500.000 $15,361.270 $25,532.900 $19,000.000 $22,000.000
WINGWALL (FW - S) (HW=3 FT)
EA 6.000 $11,000.000 $5,420.760 $12,800.360 $18,900.000 $4,500.000
WINGWALL (FW - S) (HW=4 FT)
EA 7.000 $12,000.000 $6,010.260 $20,284.390 $17,800.000 $8,500.000
WINGWALL (FW - S) (HW=5 FT)
EA 4.000 $13,000.000 $8,220.910 $19,333.660 $21,600.000 $11,000.000
WINGWALL (FW - S) (HW=6 FT)
EA 3.000 $14,000.000 $12,034.720 $32,857.110 $22,200.000 $16,000.000
WINGWALL (PW - 1) (HW=11 FT)
EA 2.000 $44,400.000 $62,368.740 $102,299.030 $44,900.000 $105,000.000
WINGWALL (PW - 1) (HW=3 FT)
EA 2.000 $13,700.000 $5,806.870 $12,572.710 $17,500.000 $10,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 3.000 $22,000.000 $25,932.970 $25,876.370 $24,000.000 $22,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $24,000.000 $40,462.420 $34,348.220 $24,000.000 $35,000.000
WINGWALL (SW - 0) (HW=3 FT)
EA 10.000 $13,200.000 $4,803.890 $11,336.380 $14,800.000 $5,500.000
WINGWALL (SW - 0) (HW=4 FT)
EA 1.000 $15,500.000 $7,137.360 $12,046.460 $23,850.000 $8,000.000
WINGWALL (SW - 0) (HW=6 FT)
EA 4.000 $10,500.000 $11,454.370 $13,362.120 $26,000.000 $12,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 4.000 $11,400.000 $12,053.390 $17,181.300 $13,000.000 $14,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 21.000 $1,200.000 $2,533.160 $1,841.120 $1,300.000 $1,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $1,750.000 $2,868.040 $1,835.280 $1,500.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $2,300.000 $4,169.620 $2,101.550 $1,650.000 $2,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 204.000 $2,300.000 $3,481.610 $2,186.660 $1,650.000 $2,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 66.000 $2,800.000 $6,110.820 $3,433.460 $2,500.000 $3,500.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 54.000 $6,500.000 $10,343.190 $5,957.710 $5,150.000 $5,000.000
CLEAN EXIST CULVERTS
EA 42.000 $1,900.000 $3,829.460 $3,662.420 $3,000.000 $2,000.000
REMOV STR (BOX CULVERT)
EA 12.000 $9,000.000 $1,606.380 $5,231.100 $0.010 $3,044.540
REMOV STR (SET)
EA 118.000 $575.000 $643.670 $292.520 $750.000 $100.000
REMOV STR (WINGWALL)
EA 6.000 $780.000 $2,574.670 $4,680.430 $5,000.000 $2,000.000
REMOV STR (HEADWALL)
EA 22.000 $2,600.000 $2,574.670 $4,680.430 $5,000.000 $2,000.000
REMOV STR (PIPE)
LF 3,238.000 $17.000 $14.360 $34.660 $22.000 $50.000
REMOV STR (BOX CULVERT)
LF 1,634.000 $58.500 $37.440 $63.410 $0.010 $300.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 4.000 $25,000.000 $65,860.000 $9,164.000 $50,000.000 $15,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 6.000 $50,000.000 $65,860.000 $31,856.380 $50,000.000 $20,000.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $250,000.000 $65,860.000 $34,366.900 $500,000.000 $193,021.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 1.000 $375,000.000 $65,860.000 $228,769.260 $1,000,000.000 $250,000.000
MOBILIZATION
LS 1.000 $13,600,000.000 $18,694,576.000 $17,669,744.760 $23,000,000.000 $29,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 47.000 $5,500.000 $2,335.950 $15,705.990 $50,000.000 $50,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 900.000 $30.000 $50.000 $50.000 $152.000 $60.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,993.000 $45.000 $70.000 $70.000 $163.000 $64.500
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 125.000 $55.000 $100.000 $100.000 $145.000 $90.000
ROCK FILTER DAMS (REMOVE)
LF 2,918.000 $10.000 $18.000 $18.000 $44.500 $9.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 4,029.000 $35.000 $45.000 $45.000 $45.250 $38.000
CONSTRUCTION EXITS (REMOVE)
SY 3,634.000 $10.000 $15.000 $15.000 $13.500 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 59,615.000 $3.000 $4.000 $4.000 $3.750 $2.850
TEMP SEDMT CONT FENCE (REMOVE)
LF 52,917.000 $1.600 $1.000 $1.000 $0.950 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 29,460.000 $6.000 $10.000 $10.000 $8.200 $5.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 25,980.000 $1.250 $2.000 $2.000 $0.950 $1.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 18,028.000 $40.000 $91.420 $63.980 $50.000 $65.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 16,799.000 $10.000 $3.330 $7.520 $10.000 $7.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 19,071.000 $18.000 $8.910 $8.810 $15.000 $5.000
CONC CURB (TY F2)
LF 28.000 $150.000 $460.580 $395.880 $500.000 $600.000
CONC CURB (TY F3)
LF 487.000 $170.000 $208.120 $321.060 $200.000 $300.000
DRIVEWAYS (ACP)
SY 9,964.000 $45.000 $34.610 $113.940 $47.250 $92.000
CONC SIDEWALKS (6")
SY 62,057.000 $50.000 $61.760 $80.740 $70.000 $75.000
CURB RAMPS (TY 10) (MOD)
EA 9.000 $1,400.000 $1,784.750 $3,473.170 $3,000.000 $3,500.000
RUMBLE STRIPS (SHOULDER) CONCRETE
LF 98,443.000 $0.500 $0.630 $0.900 $2.550 $1.250
MTL W-BEAM GD FEN (TIM POST)
LF 4,556.000 $27.250 $31.670 $33.500 $25.000 $27.000
TERMINAL ANCHOR SECTION
EA 2.000 $760.000 $1,082.190 $1,300.000 $745.000 $1,150.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 61.000 $1,950.000 $2,082.020 $1,800.000 $1,940.000 $1,850.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 43.000 $1,600.000 $1,333.460 $1,600.000 $1,490.000 $1,400.000
REMOVE METAL BEAM GUARD FENCE
LF 1,000.000 $3.000 $3.700 $4.000 $1.500 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 43.000 $3,000.000 $3,250.780 $1,600.000 $2,900.000 $2,750.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $200.000 $338.910 $250.000 $200.000 $450.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 84.000 $2,500.000 $1,752.610 $2,500.000 $12,500.000 $1,900.000
CRASH CUSH ATTEN (REMOVE)
EA 62.000 $1,500.000 $907.980 $750.000 $2,500.000 $900.000
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
EA 1.000 $3,800.000 $78,186.590 $64,000.000 $68,400.000 $71,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 35.000 $12,750.000 $8,245.730 $8,875.000 $9,480.000 $8,350.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 106.000 $250.000 $242.830 $450.000 $232.000 $250.000
ALUMINUM SIGNS (TY A)
SF 3,367.000 $20.000 $16.000 $38.000 $16.000 $16.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 309.000 $300.000 $450.000 $775.000 $450.000 $450.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 55.000 $450.000 $550.000 $945.000 $550.000 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,000.000 $725.000 $1,107.000 $725.000 $725.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 1.000 $1,200.000 $900.000 $1,300.000 $900.000 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,250.000 $775.000 $1,290.000 $775.000 $775.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 10.000 $1,300.000 $800.000 $1,390.000 $800.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 8.000 $1,400.000 $825.000 $1,360.000 $825.000 $825.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 224,468.000 $0.500 $1.500 $0.500 $0.500 $0.500
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 4,342.000 $1.500 $2.750 $2.750 $2.750 $2.750
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 1,069.000 $5.000 $6.000 $9.500 $9.500 $9.500
WK ZN PAV MRK REMOV (W)(ARROW)
EA 32.000 $198.000 $275.000 $225.000 $225.000 $225.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 32.000 $200.000 $300.000 $225.000 $225.000 $225.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 258,912.000 $0.500 $1.500 $0.500 $0.500 $0.500
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 3,706.000 $1.500 $3.000 $0.850 $0.850 $0.850
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 46,006.000 $1.000 $2.750 $1.500 $1.500 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 175.000 $10.000 $6.000 $9.500 $9.500 $9.500
PAVEMENT SEALER 6"
LF 247,269.000 $0.150 $0.300 $0.280 $0.300 $0.280
PAVEMENT SEALER 8"
LF 46,006.000 $0.250 $0.400 $0.400 $0.400 $0.400
PAVEMENT SEALER 24"
LF 883.000 $1.000 $1.000 $6.250 $6.250 $6.250
PAVEMENT SEALER (ARROW)
EA 146.000 $10.000 $25.000 $55.000 $55.000 $55.000
PAVEMENT SEALER (WORD)
EA 115.000 $10.000 $30.000 $65.000 $65.000 $65.000
PAVEMENT SEALER (SYMBOL)
EA 30.000 $120.000 $30.000 $50.000 $50.000 $50.000
PAVEMENT SEALER (YLD TRI)
EA 312.000 $1.000 $10.000 $70.000 $70.000 $70.000
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 24,954.000 $0.500 $0.850 $0.850 $0.850 $0.850
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 112,915.000 $0.500 $0.800 $0.850 $0.850 $0.850
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 786.000 $1.000 $0.850 $1.150 $1.150 $1.150
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 104,908.000 $0.500 $0.800 $0.850 $0.850 $0.850
PRE PM TY B(ACC PRK)(BL&WH)(W/BORDR)LG
EA 9.000 $500.000 $1,000.000 $650.000 $650.000 $650.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 631.000 $15.000 $15.000 $28.000 $28.000 $28.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 146.000 $200.000 $250.000 $350.000 $350.000 $350.000
PREFAB PAV MRK TY C (W) (WORD)
EA 115.000 $250.000 $350.000 $550.000 $550.000 $550.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 312.000 $40.000 $50.000 $98.000 $98.000 $98.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 252.000 $10.500 $15.000 $37.000 $37.000 $37.000
PREFAB PAV MRK TY C(EVAC SYM, BLUE/WHT)
EA 21.000 $506.000 $1,800.000 $1,950.000 $1,950.000 $1,950.000
REFL PAV MRKR TY I-C
EA 2,320.000 $5.250 $6.000 $4.500 $4.500 $4.500
REFL PAV MRKR TY II-C-R
EA 4,937.000 $6.500 $6.000 $4.500 $4.500 $4.500
PAV SURF PREP FOR MRK (6")
LF 247,269.000 $0.250 $0.100 $0.250 $0.250 $0.250
PAV SURF PREP FOR MRK (8")
LF 46,006.000 $0.500 $0.150 $0.400 $0.400 $0.400
PAV SURF PREP FOR MRK (24")
LF 883.000 $2.000 $0.400 $12.000 $12.000 $12.000
PAV SURF PREP FOR MRK (ARROW)
EA 146.000 $35.000 $7.000 $30.000 $30.000 $30.000
PAV SURF PREP FOR MRK (WORD)
EA 115.000 $28.000 $15.000 $30.000 $30.000 $30.000
PAV SURF PREP FOR MRK (SYMBOL)
EA 30.000 $50.000 $30.000 $50.000 $50.000 $50.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 312.000 $13.000 $8.000 $45.000 $45.000 $45.000
FULL - WIDTH MOWING
AC 48.000 $75.000 $1,500.000 $1,304.360 $100.000 $300.000
STRIP MOWING - TRACT (14)
AC 74.000 $2,500.000 $1,500.000 $1,304.360 $100.000 $500.000
FULL - WIDTH MOWING
CYC 102.000 $2,500.000 $2,900.000 $1,304.360 $7,500.000 $2,500.000
CLEANING / SWEEPING (SPOT)
MI 27.000 $250.000 $5,000.000 $1,029.830 $1,500.000 $3,900.000
LANDSCAPE AMENITY (TY 1)
EA 1.000 $79,000.000 $231,160.000 $28,484.460 $260,000.000 $300,000.000
LANDSCAPE AMENITY (TY 2)
EA 2.000 $43,250.000 $65,000.000 $23,615.200 $45,000.000 $130,000.000
LANDSCAPE AMENITY (TY 3)
EA 3.000 $50,000.000 $286,298.330 $38,193.930 $260,000.000 $325,000.000
LANDSCAPE AMENITY (TY 4)
EA 4.000 $5,300.000 $60,000.000 $7,959.090 $20,000.000 $80,000.000
LANDSCAPE AMENITY (TY 5)
EA 16.000 $33,000.000 $207,249.280 $31,520.130 $50,000.000 $65,000.000
LANDSCAPE AMENITY (TY 6)
EA 3.000 $240,000.000 $365,864.170 $127,953.190 $250,000.000 $500,000.000
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
CY 15.000 $225.000 $403.290 $403.290 $403.000 $3,000.000
LANDSCAPE SOIL AMENDMENT (TYPE I)
SY 361,989.000 $0.300 $1.070 $1.070 $1.050 $1.500
LANDSCAPE SOIL AMENDMENT (TYPE II)
SY 192,357.000 $0.300 $0.990 $0.990 $1.000 $1.500
LANDSCAPE SOIL AMENDMENT (TYPE III)
SY 20,634.000 $0.860 $1.320 $1.320 $1.300 $1.500
LANDSCAPE SOIL AMENDMENT (TYPE IV)
SY 29,655.000 $35.000 $1.360 $1.360 $1.350 $1.500
LANDSCAPE SOIL AMENDMENT (TYPE V)
SY 11,679.000 $0.350 $1.470 $1.470 $1.450 $1.500
TACK COAT
GAL 54,497.000 $3.000 $11.740 $4.500 $4.750 $5.000
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 34,501.000 $195.930 $292.670 $150.000 $158.000 $181.000
PED STL TRUSS BRG SPAN (45 FT)
EA 2.000 $110,800.000 $112,505.110 $130,926.490 $110,000.000 $260,000.000
PED STL TRUSS BRG SPAN (50 FT)
EA 6.000 $114,000.000 $108,390.210 $126,336.110 $125,000.000 $260,000.000
PED STL TRUSS BRG SPAN (60 FT)
EA 17.000 $129,600.000 $124,829.150 $147,805.200 $150,000.000 $260,000.000
WHEEL STOPS
EA 15.000 $200.000 $5,482.420 $100.000 $500.000 $2,000.000
CCTV FIELD EQUIPMENT (ANALOG)
EA 2.000 $7,500.000 $22,000.000 $2,500.000 $25,000.000 $19,000.000
CCTV FIELD CONTROLLER
EA 2.000 $670.000 $14,500.000 $5,000.000 $16,480.000 $11,500.000
ITS RADIO (SNGL)(5 GHZ)-I-U
EA 2.000 $4,415.000 $16,427.000 $7,500.000 $18,670.000 $14,000.000
SPS-INS (80W)1920W (1000AH) 4X50A(3)
EA 2.000 $2,000.000 $50,000.000 $7,500.000 $56,800.000 $37,500.000
ITS POLE (45 FT)(130 MPH)
EA 2.000 $18,000.000 $27,709.000 $12,500.000 $31,490.000 $25,098.000
ITS POLE MNT CAB (TY 3)(CONF 2)
EA 2.000 $8,700.000 $17,711.000 $7,500.000 $20,130.000 $14,850.000
TMA (STATIONARY)
DAY 720.000 $265.000 $165.850 $309.210 $430.000 $228.000
TMA (MOBILE OPERATION)
DAY 720.000 $450.000 $552.830 $692.060 $796.000 $627.000
WATER MAIN PIPE (PVC) (6IN) (C-900)
LF 26,474.000 $95.580 $75.000 $72.740 $52.000 $72.990
CASING STEEL (18IN)
LF 1,176.000 $282.640 $533.000 $230.260 $194.000 $136.500
JCK TUN BOR OR AUG WTR MAIN (PVC) (6IN)
LF 846.000 $65.440 $66.000 $309.220 $419.000 $390.000
SERVICE LINE (SHORT SIDE) (5/8" TO 1")
EA 56.000 $1,895.000 $2,185.000 $2,257.660 $2,660.000 $911.610
SERVICE LINE (LONG SIDE) (5/8" TO 1")
EA 14.000 $2,400.000 $6,123.000 $4,843.730 $6,920.000 $4,360.710
BLOW OFF VALVE (PERM ANGLE) (2IN)
EA 2.000 $2,145.000 $7,700.000 $1,937.010 $10,090.000 $3,630.000
WATER METER BOX
EA 70.000 $50.000 $309.000 $496.590 $1,310.000 $120.000
REMOVE EXIST WATER PIPE(VAR)(SIZE)(MTL)
LF 39,957.000 $35.000 $30.000 $12.870 $28.100 $17.500
INSTALL 4" PE GAS VALVE
EA 31.000 $200.000 $8,500.000 $900.000 $657.000 $900.000
INSTALL 2" PE GAS VALVE
EA 1.000 $75.000 $7,700.000 $750.000 $265.000 $600.000
INSTALL 4" X 4" GAS TEE
EA 2.000 $18.500 $7,500.000 $550.000 $152.000 $1,200.000
INSTALL 4" X 2" GAS TEE
EA 1.000 $9.500 $7,500.000 $1,200.000 $152.000 $1,000.000
INSTALL 4" GAS LINE VERTICAL BEND
EA 1.000 $13.500 $8,000.000 $1,200.000 $354.000 $1,000.000
INSTALL 2" GAS LINE VERTICAL BEND
EA 1.000 $5.000 $7,500.000 $1,200.000 $303.000 $1,000.000
INSTALL 4" GAS LINE BY DIRECTIONAL BORE
LF 602.000 $66.000 $120.000 $23.000 $202.000 $165.000
INSTALL CUT & PLUG OF GAS LINE
EA 1.000 $75.000 $8,000.000 $8,750.000 $11,120.000 $2,500.000
2" PE 2708 GAS LINE
LF 486.000 $1.500 $100.000 $12.000 $128.000 $32.000
4" PE 2708 GAS LINE
LF 30,198.000 $4.250 $75.000 $18.000 $46.500 $38.000
DRY BORE & STEEL ENCASEMENT
LF 264.000 $66.000 $250.000 $48.000 $523.000 $425.000
REMOVE & DISPOSE GAS LINE
LF 240.000 $5.000 $40.000 $20.000 $109.000 $38.000
Totals: $158,459,712.440 $205,416,129.850 $214,134,329.994 $235,571,594.610 $262,518,491.980