TRINITY FS 357 (0931-04-034)

Items: 68

County: TRINITY
Length: N/A
Highway: FS 357
District: LUFKIN
Control Number: 0931-04-034
DBE Goal: N/A
Project: STP 2022(897)HES
Guaranty: N/A
Time: 78 WORKING DAYS
Engineer's Estimate: $1,317,722.93
Date: 08/03/2022 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
JESSE SISCO
PRAVEEN RAMANATHAN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,317,722.93
Over/Under Est: 25.11% $330,825.50
Over/Under Est: 25.57% $336,909.78
Amt Left: 0.37% $6,084.28
Over/Under Est: 34.16% $450,198.21
Amt Left: 7.24% $119,372.71
Delta: -6.85% -$113,288.43
Over/Under Est: 78.75% $1,037,757.22
Amt Left: 42.88% $706,931.72
Delta: -33.23% -$587,559.01

Bid Items & Bid Tabulations

68 Total 0 of 68
TRINITY  |  FS 357  |  LUFKIN  |  0931-04-034  |  08/03/2022  |  $1,317,722.93  |  STP 2022(897)HES  |  HAZARD ELIM & SAFETY  |  78 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
MOORE BROTHERS CONSTRUCTION COMPANY
PINTO CONSTRUCTION CO., INC.
STATELINE CONSTRUCTION, LLC
PREPARING ROW
STA 68.000 $1,500.000 $1,200.000 $1,220.000 $1,214.870 $1,400.000
REMOVING CONC (DRIVEWAYS)
SY 274.000 $18.000 $35.000 $24.000 $23.100 $20.000
SUBGRADE WIDENING (ORD COMP)
STA 68.450 $280.000 $800.000 $188.460 $108.300 $900.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 1,814.000 $15.000 $20.000 $14.000 $20.000 $18.500
BLADING
STA 68.450 $200.000 $120.000 $290.720 $244.520 $500.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 16.000 $85.000 $275.000 $171.000 $163.800 $300.000
BLOCK SODDING
SY 598.000 $5.500 $8.000 $7.700 $5.800 $7.000
BROADCAST SEED (TEMP) (WARM)
SY 10,382.000 $0.120 $0.500 $0.170 $0.150 $0.500
BROADCAST SEED (TEMP) (COOL)
SY 10,382.000 $0.120 $0.500 $0.070 $0.130 $0.500
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 442.000 $0.350 $1.000 $2.750 $0.420 $1.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 20,765.000 $0.600 $1.000 $1.030 $0.710 $1.100
VEGETATIVE WATERING
MG 851.380 $10.000 $6.000 $5.000 $0.010 $5.000
SPRINKLING (DUST CONTROL)
MG 198.000 $2.000 $20.000 $10.000 $0.010 $5.000
CEM TRT(PLNT MX) (CLN)(TYA)(GR1-2)(12")
SY 3,044.000 $30.000 $91.000 $60.130 $80.710 $145.000
ASPH (RC-250)
TON 3.000 $1,300.000 $1,500.000 $4,100.000 $3,231.810 $6,342.000
AGGR (TY E OR L GR 5)
CY 21.000 $140.000 $500.000 $632.000 $421.820 $500.000
AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)
CY 180.000 $120.000 $150.000 $220.000 $168.100 $350.000
ASPH (AC-15P OR CRS-2P)
TON 40.000 $950.000 $1,150.000 $1,225.000 $1,084.930 $3,000.000
CL C CONC (COLLAR)
EA 2.000 $1,000.000 $1,500.000 $220.000 $210.000 $1,500.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 50.000 $105.000 $125.000 $210.000 $199.500 $175.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 22.000 $600.000 $600.000 $775.000 $735.000 $900.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 25.000 $700.000 $700.000 $895.000 $851.550 $1,200.000
RC PIPE (CL III)(18 IN)
LF 528.000 $60.000 $48.000 $62.000 $57.750 $58.250
RC PIPE (CL III)(24 IN)
LF 24.000 $80.000 $125.000 $90.000 $84.000 $94.500
WINGWALL (PW - 2) (HW=4 FT)
EA 2.000 $6,000.000 $10,000.000 $10,750.000 $10,185.000 $19,000.000
WINGWALL (PW - 2) (HW=8 FT)
EA 2.000 $18,900.000 $28,000.000 $26,000.000 $24,675.000 $44,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 6.000 $700.000 $750.000 $775.000 $735.000 $750.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 52.000 $800.000 $800.000 $810.000 $771.750 $885.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,100.000 $1,000.000 $1,400.000 $1,312.500 $885.000
REMOV STR (PIPE)
EA 18.000 $400.000 $500.000 $265.000 $241.500 $100.000
MOBILIZATION
LS 1.000 $100,000.000 $60,000.000 $75,000.000 $158,000.000 $180,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $3,000.000 $4,000.000 $1,925.000 $1,060.000 $2,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 160.000 $32.000 $46.000 $43.500 $41.480 $40.000
ROCK FILTER DAMS (REMOVE)
LF 160.000 $8.000 $15.000 $8.800 $8.400 $5.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 222.000 $15.000 $25.000 $32.500 $10.000 $10.000
CONSTRUCTION EXITS (REMOVE)
SY 222.000 $8.000 $10.000 $8.800 $3.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,290.000 $2.800 $4.150 $3.550 $3.000 $4.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,290.000 $1.000 $1.150 $0.830 $1.000 $1.000
DRIVEWAYS (CONC)
SY 250.000 $120.000 $150.000 $127.000 $120.750 $130.000
DRIVEWAYS (ACP)
SY 550.000 $25.000 $45.200 $60.620 $60.000 $85.000
TURNOUTS (SURF TREAT)
SY 755.000 $40.000 $48.000 $61.380 $60.000 $60.000
DRIVEWAYS (BASE)
SY 1,246.000 $40.000 $33.000 $67.810 $60.000 $51.500
MAILBOX INSTALL-S (WC-POST) TY 3
EA 16.000 $210.000 $200.000 $297.000 $283.500 $300.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 2.000 $210.000 $263.000 $297.000 $283.500 $400.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 1.000 $3,880.000 $7,625.000 $8,150.000 $7,770.000 $9,000.000
CONDT (PVC) (SCH 80) (2")
LF 85.000 $15.000 $18.500 $20.000 $18.900 $23.250
ELEC CONDR (NO.8) BARE
LF 85.000 $1.600 $3.150 $3.250 $3.150 $4.000
ELEC CONDR (NO.8) INSULATED
LF 170.000 $1.600 $3.150 $3.630 $3.470 $4.350
GROUND BOX TY A (122311)
EA 1.000 $700.000 $545.000 $530.000 $556.500 $625.000
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
EA 1.000 $5,800.000 $8,750.000 $9,400.000 $8,925.000 $10,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $830.000 $1,100.000 $1,020.000 $971.250 $1,500.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 12.000 $360.000 $825.000 $480.000 $456.750 $1,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 3.000 $450.000 $990.000 $700.000 $672.000 $1,400.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 12.000 $100.000 $125.000 $115.000 $110.250 $250.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 56.000 $0.750 $12.000 $10.000 $1.500 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 575.000 $1.000 $1.250 $1.500 $1.500 $5.000
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 13,691.000 $0.750 $1.750 $1.650 $1.580 $2.000
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 2,683.000 $0.750 $1.750 $1.650 $1.580 $2.000
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 13,691.000 $0.750 $1.750 $1.650 $1.580 $2.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 51.000 $9.000 $16.000 $16.500 $15.750 $22.000
REFL PAV MRKR TY II-A-A
EA 164.000 $3.000 $5.250 $5.500 $5.250 $6.500
PAV SURF PREP FOR MRK (4")
LF 2,683.000 $1.000 $0.300 $0.280 $0.260 $0.500
SP MIXES SP-C PG70-22
TON 3,194.000 $130.000 $135.000 $163.050 $171.200 $180.000
TACK COAT
GAL 1,978.000 $5.000 $5.000 $5.000 $5.250 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $12,000.000 $7,000.000 $10,000.000 $7,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 102.000 $5.000 $11.000 $16.500 $10.500 $20.000
TMA (STATIONARY)
DAY 78.000 $250.000 $200.000 $50.000 $230.000 $195.000
TMA (MOBILE OPERATION)
DAY 3.000 $420.000 $200.000 $50.000 $50.000 $500.000
Totals: $1,317,722.930 $1,648,548.430 $1,654,632.721 $1,767,921.153 $2,355,480.150