TRAVIS US0183 (6391-93-001)

Items: 46

County: TRAVIS
Length: N/A
Highway: US0183
District: AUSTIN
Control Number: 6391-93-001
DBE Goal: N/A
Project: BPM - 639193001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $1,391,727.50
Date: 03/03/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPAIR
Mail/Deliver Bids To: N/A
KEVIN MOYER
KATHLEEN NEWTON
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$1,391,727.50
1
$1,429,650.00
Over/Under Est: 2.72% $37,922.50
Over/Under Est: 28.03% $390,122.50
Amt Left: 24.64% $352,200.00
Subcontractor Percentage Amount
ENVIRONMENTAL SAFETY SERVICES, INC. 25.72% $1,061,408.20
PRIMETEX MATERIALS LLC 6.06% $250,082.96
Total: 31.78% $1,311,491.16

Bid Items & Bid Tabulations

46 Total 0 of 46
TRAVIS  |  US0183  |  AUSTIN  |  6391-93-001  |  03/03/2022  |  $1,391,727.50  |  BPM - 639193001  |  BRIDGE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RESTEK, INC.
SCR CIVIL CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 500.000 $50.000 $50.000 $130.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 240.000 $15.000 $50.000 $135.000
FLOWABLE BACKFILL
CY 180.000 $350.000 $300.000 $540.000
CL K CONC (PEDESTAL)
EA 2.000 $500.000 $4,000.000 $4,500.000
RIPRAP (CONC)(5 IN)
CY 100.000 $400.000 $850.000 $1,300.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 100.000 $400.000 $225.000 $355.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 100.000 $400.000 $275.000 $250.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 125.000 $400.000 $300.000 $250.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 450.000 $400.000 $325.000 $280.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 100.000 $50.000 $50.000 $80.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 632.000 $50.000 $50.000 $70.000
HEADER TYPE EXPANSION JOINT
CF 36.000 $400.000 $750.000 $850.000
JOINT SEALANT
LF 510.000 $30.000 $25.000 $50.000
GABIONS (GALV)
CY 180.000 $200.000 $300.000 $280.000
GABION MATTRESSES (GALV)(12 IN)
SY 800.000 $100.000 $150.000 $150.000
GABIONS (3' X 3')(GALV)
CY 400.000 $200.000 $300.000 $280.000
RAISING EXIST STRUCT
LS 1.000 $7,000.000 $50,000.000 $37,000.000
MOBILIZATION (CALLOUT)
EA 20.000 $10,000.000 $2,500.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 80.000 $27.000 $31.250 $39.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $9.000 $25.000 $16.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 30.000 $22.000 $62.500 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 30.000 $10.000 $500.000 $22.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $3.000 $5.000 $6.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $1.250 $2.500 $2.250
TREE REMOVAL (4" - 12" DIA)
EA 50.000 $600.000 $100.000 $110.000
TREE REMOVAL (12" - 18" DIA)
EA 30.000 $800.000 $125.000 $140.000
BRIDGE JOINT REPAIR (ARMOR)
LF 48.000 $150.000 $350.000 $875.000
BRIDGE JOINT REPAIR (SEJ)
LF 48.000 $200.000 $400.000 $875.000
BRIDGE JOINT REPAIR (HEADER)
LF 40.000 $200.000 $125.000 $530.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 48.000 $150.000 $350.000 $1,700.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 48.000 $350.000 $400.000 $1,900.000
RAISING AND UNDERSEALING CONCRETE SLAB
LB 2,350.000 $6.750 $6.000 $14.500
REPLACE ELASTOMERIC BEARING PADS
EA 25.000 $9,000.000 $4,500.000 $8,410.000
DEWATERING BAGS
EA 20.000 $1,300.000 $200.000 $4,600.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 200.000 $100.000 $255.000 $108.000
TMA (STATIONARY)
DAY 100.000 $350.000 $500.000 $400.000
LANE CLOSURE (SETUP AND REMOV)(TY 1)
EA 15.000 $450.000 $2,300.000 $400.000
LANE CLOSURE (SETUP AND REMOV)(TY 2)
EA 20.000 $450.000 $2,300.000 $450.000
LANE CLOSURE (SETUP AND REMOV)(TY 3)
EA 5.000 $450.000 $1,785.000 $550.000
LANE CLOSURE (SETUP AND REMOV)(TY 4)
EA 25.000 $500.000 $2,300.000 $650.000
LANE CLOSURE (SETUP AND REMOV)(TY 5)
EA 5.000 $500.000 $1,785.000 $725.000
LANE CLOSURE (SETUP AND REMOV)(TY 6)
EA 5.000 $500.000 $2,350.000 $1,000.000
LANE CLOSURE (SETUP AND REMOV)(TY 9)
EA 5.000 $500.000 $575.000 $425.000
LANE CLOSURE (SETUP AND REMOV)(TY 12)
EA 5.000 $500.000 $1,150.000 $550.000
LANE CLOSURE (SETUP AND REMOV)(TY 16)
EA 5.000 $500.000 $1,785.000 $450.000
LANE CLOSURE (SETUP AND REMOV)(TY 17)
EA 5.000 $815.000 $2,035.000 $375.000
Totals: $1,391,727.500 $1,429,650.000 $1,781,850.000