Show Job Controls
Bid Cobra

TRAVIS SL0001 (6373-27-001)

Items: 57

County: TRAVIS
Length: N/A
Highway: SL0001
District: AUSTIN
Control Number: 6373-27-001
DBE Goal: N/A
Project: RMC - 637327001
Guaranty: N/A
Time: 101 W
Engineer's Estimate: $2,433,786.70
Date: 11/03/2021 (4 years ago)
Contract Number: N/A
Type: MILL, SEAL, AND OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$2,433,786.70
$2,526,953.80
Over/Under Est: 3.83% $93,167.10
Over/Under Est: 15.99% $389,277.21
Amt Left: 11.72% $296,110.11
Over/Under Est: 20.54% $499,851.01
Amt Left: 16.09% $406,683.91
Delta: -3.92% -$110,573.80

Bid Items & Bid Tabulations

57 Total 0 of 57
TRAVIS  |  SL0001  |  AUSTIN  |  6373-27-001  |  11/03/2021  |  $2,433,786.70  |  RMC - 637327001  |  MILL, SEAL, AND OVERLAY  |  101 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONE STAR PAVING COMPANY
HUNTER INDUSTRIES, LTD.
TEXAS MATERIALS GROUP, INC.
REMOVING CONC (RIPRAP)
SY 2,668.000 $25.000 $39.000 $36.630 $38.000
BACKFILL (TY A OR B)
STA 82.000 $211.370 $119.000 $174.300 $225.000
TOM (ASPHALT) PG 76-22
TON 570.000 $113.430 $141.000 $150.600 $165.000
TOM-C (AGGREGATE) SAC-A
TON 8,519.000 $113.430 $141.000 $150.600 $165.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 4,589.000 $23.000 $20.000 $26.750 $31.000
PLANE ASPH CONC PAV(0" TO 1")
SY 8,139.000 $5.960 $4.450 $4.710 $3.850
PLANE ASPH CONC PAV (0"- 1" EDGE MILL)
SQ 37,746.000 $4.290 $2.150 $2.300 $2.850
RIPRAP (MOW STRIP)(4 IN)
CY 356.000 $429.650 $535.000 $654.000 $530.000
MOBILIZATION
LS 1.000 $221,253.340 $44,600.000 $239,327.260 $142,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $9,500.000 $19,000.000 $3,745.000 $18,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 500.000 $5.000 $4.000 $12.960 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 500.000 $2.500 $1.000 $5.400 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 6,175.000 $18.000 $29.000 $31.100 $28.800
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 16.000 $500.000 $2,150.000 $2,295.000 $2,125.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $675.000 $1,300.000 $1,393.200 $1,290.000
REMOVE METAL BEAM GUARD FENCE
LF 5,978.000 $3.880 $2.550 $2.700 $2.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 16.000 $150.000 $187.000 $199.800 $185.000
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $2,501.400 $3,300.000 $3,537.000 $3,275.000
GUARDRAIL END TREATMENT (REMOVE)
EA 15.000 $230.000 $252.000 $270.000 $250.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 24.000 $32.500 $28.500 $30.240 $28.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 68.000 $25.000 $28.500 $30.240 $28.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
EA 3.000 $51.000 $86.000 $91.800 $85.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,549.000 $1.300 $1.550 $1.410 $1.100
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 245.000 $1.260 $1.550 $1.410 $1.100
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 324.000 $1.500 $1.000 $1.080 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 16,740.000 $0.660 $0.750 $0.790 $0.740
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 6,692.000 $1.960 $3.000 $3.240 $3.330
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,846.000 $7.200 $6.000 $6.480 $6.700
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 47.000 $97.220 $95.000 $102.600 $155.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 5.000 $275.000 $125.000 $135.000 $222.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 10.000 $225.000 $225.000 $243.000 $243.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 54.000 $200.000 $145.000 $156.600 $155.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 122.000 $80.000 $40.000 $43.200 $50.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 346.000 $0.770 $1.000 $1.080 $1.500
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,629.000 $3.500 $3.000 $3.240 $3.300
REFL PAV MRK TY II (W) 4" (BRK)
LF 10,350.000 $0.160 $0.230 $0.240 $0.180
REFL PAV MRK TY II (W) 4" (SLD)
LF 12,731.000 $0.210 $0.230 $0.240 $0.150
REFL PAV MRK TY II (W) 8" (SLD)
LF 16,740.000 $5.000 $0.410 $0.430 $0.400
REFL PAV MRK TY II (W) 12" (SLD)
LF 6,692.000 $2.000 $1.550 $1.670 $1.430
REFL PAV MRK TY II (W) 24" (SLD)
LF 2,846.000 $5.000 $3.190 $3.350 $3.000
REFL PAV MRK TY II (W) (ARROW)
EA 47.000 $100.000 $46.000 $48.600 $55.000
REFL PAV MRK TY II (W) (DBL ARROW)
EA 5.000 $200.000 $56.000 $59.400 $93.000
REFL PAV MRK TY II (W) (UTURN ARROW)
EA 10.000 $100.000 $76.000 $81.000 $94.000
REFL PAV MRK TY II (W) (WORD)
EA 54.000 $100.000 $72.000 $75.600 $55.000
REFL PAV MRK TY II (W) 36" (YLD TRI)
EA 122.000 $80.000 $20.250 $21.600 $23.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 28,473.000 $0.250 $0.230 $0.240 $0.150
REFL PAV MRK TY II (Y) 8" (SLD)
LF 346.000 $0.400 $0.410 $0.430 $1.000
REFL PAV MRK TY II (Y) 12" (SLD)
LF 1,629.000 $1.450 $1.550 $1.670 $1.430
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 10,350.000 $0.370 $0.370 $0.390 $0.470
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 12,731.000 $0.800 $0.370 $0.390 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 28,473.000 $0.600 $0.370 $0.390 $0.440
REFL PAV MRKR TY II-A-A
EA 350.000 $4.750 $4.100 $4.320 $6.000
REFL PAV MRKR TY II-C-R
EA 1,163.000 $3.410 $4.100 $4.320 $5.000
BONDING COURSE
GAL 4,130.000 $2.480 $2.500 $3.820 $14.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 1.000 $2,898.190 $14,000.000 $12,000.000 $3,500.000
TMA (STATIONARY)
DAY 190.000 $391.390 $295.000 $300.000 $200.000
TMA (MOBILE OPERATION)
HR 114.000 $40.830 $101.000 $100.000 $75.000
Totals: $2,433,786.700 $2,526,953.800 $2,823,063.910 $2,933,637.710