|
|
REMOVING CONC (RIPRAP)
|
SY
|
10.000
|
$25.000
|
$10.550
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
15.000
|
$525.000
|
$600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
60.000
|
$450.000
|
$500.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
2,000.000
|
$10.000
|
$0.100
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10.000
|
$10.000
|
$10.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10.000
|
$5.000
|
$1.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
6,000.000
|
$20.000
|
$27.100
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,000.000
|
$25.000
|
$27.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
25.000
|
$1,000.000
|
$1,050.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
50.000
|
$990.000
|
$2,250.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
6,000.000
|
$3.000
|
$7.850
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
10.000
|
$150.000
|
$50.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
50.000
|
$130.000
|
$1.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
25.000
|
$350.000
|
$50.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$2,500.000
|
$5,480.100
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
|
EA
|
10.000
|
$25.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
50.000
|
$27.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
10.000
|
$22.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
|
EA
|
50.000
|
$25.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
10.000
|
$25.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
|
EA
|
10.000
|
$20.000
|
$15.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
10.000
|
$25.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
100.000
|
$28.000
|
$60.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
40,000.000
|
$18.000
|
$20.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
500.000
|
$28.000
|
$50.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
150.000
|
$50.000
|
$50.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
2,400.000
|
$30.000
|
$45.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
1,500.000
|
$25.000
|
$50.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
1,500.000
|
$25.000
|
$60.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
25.000
|
$185.000
|
$300.000
|
|
|
REALIGN POSTS
|
EA
|
900.000
|
$20.000
|
$25.000
|
|
|
REMOVE & REPLACE BLOCKOUT
|
EA
|
1,500.000
|
$30.000
|
$60.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
80.000
|
$2,750.000
|
$4,000.000
|
|
|
REPAIR SINGLE GUARDRAIL TERMINAL
|
EA
|
750.000
|
$1,950.000
|
$900.000
|
|
|
REPLACE POSTS (TL-4)
|
EA
|
600.000
|
$150.000
|
$125.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-4)
|
EA
|
2.000
|
$100.000
|
$100.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
|
EA
|
40.000
|
$800.000
|
$500.000
|
|
|
REPLACE CABLE (TL-4)
|
LF
|
500.000
|
$5.000
|
$5.000
|
|
|
REMOVE AND REPLACE (TRACC)
|
EA
|
2.000
|
$25,000.000
|
$20,000.000
|
|
|
REMOVE AND REPLACE (WIDE TRACC)
|
EA
|
2.000
|
$26,500.000
|
$25,000.000
|
|
|
REMOVE AND REPLACE (NARROW REACT 350)
|
EA
|
2.000
|
$26,500.000
|
$25,000.000
|
|
|
REMOVE AND REPLACE (WIDE REACT 350)
|
EA
|
2.000
|
$26,500.000
|
$25,000.000
|
|
|
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
|
EA
|
3.000
|
$1,695.000
|
$680.000
|
|
|
REPAIR (TRACC)
|
EA
|
7.000
|
$3,800.000
|
$5,000.000
|
|
|
REPAIR (WIDE TRACC)
|
EA
|
2.000
|
$7,500.000
|
$7,500.000
|
|
|
REPAIR (NARROW REACT 350)
|
LF
|
70.000
|
$350.000
|
$300.000
|
|
|
REMOVE AND REPLACE (NARROW QUAD)
|
EA
|
2.000
|
$26,500.000
|
$32,000.000
|
|
|
REPAIR (NARROW QUAD)
|
EA
|
140.000
|
$1,506.000
|
$1,400.000
|
|
|
REMOVE AND REPLACE (WIDE QUAD)
|
EA
|
2.000
|
$26,500.000
|
$27,000.000
|
|
|
REPAIR (WIDE QUAD)
|
EA
|
50.000
|
$1,702.000
|
$2,850.000
|
|
|
REPAIR (REACT 350) (W)
|
EA
|
2.000
|
$7,500.000
|
$5,000.000
|
|
|
REMOVE AND REPLACE (SMTC) (N)
|
EA
|
2.000
|
$22,000.000
|
$29,000.000
|
|
|
REPAIR (SMTC) (N)
|
EA
|
3.000
|
$3,750.000
|
$5,000.000
|
|
|
REMOVE AND REPLACE (SMTC) (W)
|
EA
|
1.000
|
$27,000.000
|
$30,000.000
|
|
|
REPAIR (SMTC) (W)
|
EA
|
1.000
|
$3,700.000
|
$8,000.000
|
|
|
REPAIR (VIA -SAND FILL PLASTIC BARRELS)
|
EA
|
1.000
|
$500.000
|
$750.000
|
|
|
REPAIR (BEAT - SSCC)
|
EA
|
2.000
|
$2,000.000
|
$4,900.000
|
|
|
REPAIR TAU II (N)
|
LF
|
15.000
|
$1,250.000
|
$400.000
|
|
|
REPAIR TAU II (W)
|
LF
|
15.000
|
$1,250.000
|
$400.000
|
|
|
REPAIR (STEEL POST W/ W-BEAM - T101)
|
LF
|
80.000
|
$85.000
|
$100.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
80.000
|
$85.000
|
$350.000
|
|
|
TMA (STATIONARY)
|
DAY
|
5.000
|
$400.000
|
$2,680.000
|
|
|
LANE CLOSURE TYPE 1 (8 HR)
|
EA
|
22.000
|
$500.000
|
$800.000
|
|
|
LANE CLOSURE TYPE 2 (8 HR)
|
EA
|
15.000
|
$650.000
|
$500.000
|
|
|
LANE CLOSURE TYPE 3 (8 HR)
|
EA
|
14.000
|
$725.000
|
$500.000
|
|
|
LANE CLOSURE TYPE 4 (8 HR)
|
EA
|
23.000
|
$500.000
|
$500.000
|
|
|
LANE CLOSURE TYPE 5 (8 HR)
|
EA
|
22.000
|
$650.000
|
$500.000
|
|
|
LANE CLOSURE TYPE 6 (8 HR)
|
EA
|
16.000
|
$1,050.000
|
$1,000.000
|
|
|
LANE CLOSURE TYPE 9 (8 HR)
|
EA
|
16.000
|
$500.000
|
$2,000.000
|
|
|
LANE CLOSURE TYPE 12 (8 HR)
|
EA
|
65.000
|
$175.000
|
$500.000
|
|
|
LANE CLOSURE TYPE 13 (8 HR)
|
EA
|
21.000
|
$500.000
|
$1,000.000
|
|
|
LANE CLOSURE TYPE 16
|
EA
|
18.000
|
$450.000
|
$2,000.000
|
|
|
LANE CLOSURE TYPE 14
|
EA
|
18.000
|
$500.000
|
$500.000
|
|
Totals: |
$4,053,070.000
|
$3,884,863.500
|