Show Job Controls
Bid Cobra

TRAVIS FM0685 (6327-13-001)

Items: 162

County: TRAVIS
Length: N/A
Highway: FM0685
District: AUSTIN
Control Number: 6327-13-001
DBE Goal: N/A
Project: RMC - 632713001
Guaranty: N/A
Time: 520 W
Engineer's Estimate: $764,655.20
Date: 05/07/2019 (7 years ago)
Contract Number: N/A
Type: SIGNAL REPAIR WITH EMERGENCY CALL OUTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$764,655.20
Over/Under Est: -13.19% -$100,837.70

Bid Items & Bid Tabulations

162 Total 0 of 162
TRAVIS  |  FM0685  |  AUSTIN  |  6327-13-001  |  05/07/2019  |  $764,655.20  |  RMC - 632713001  |  SIGNAL REPAIR WITH EMERGENCY CALL OU...  |  520 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
FURNISHING AND PLACING TOPSOIL (4")
SY 100.000 $1.530 $5.000
BROADCAST SEED (PERM) (URBAN) (CLAY)
SY 100.000 $0.660 $5.000
VEGETATIVE WATERING
MG 2.000 $23.050 $50.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 11.000 $215.580 $100.000
MOBILIZATION (CALLOUT 1)
EA 35.000 $1,696.930 $1,000.000
MOBILIZATION (CALLOUT 2)
EA 15.000 $1,200.000 $1,400.000
MOBILIZATION (EMERGENCY)
EA 12.000 $469.080 $2,000.000
BARR, SIGNS, TRAFFIC HANDLING
EA 5.000 $7,735.840 $1,750.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 300.000 $4.090 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 300.000 $1.070 $1.000
CONC DIRECTIONAL ISLAND
SY 6.000 $90.840 $125.000
CONDT (PVC) (SCH 40) (2")
LF 300.000 $10.160 $10.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 200.000 $33.060 $30.000
CONDT (PVC) (SCH 40) (3")
LF 300.000 $16.050 $15.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 300.000 $25.470 $35.000
CONDT (PVC) (SCH 40) (4")
LF 100.000 $19.470 $20.000
CONDT (PVC) (SCH 40) (4") (BORE)
LF 100.000 $30.030 $40.000
CONDT (PVC) (SCH 80) (2")
LF 100.000 $12.040 $16.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 100.000 $31.570 $31.000
CONDT (PVC) (SCH 80) (2") (BORE)(ROCK)
LF 100.000 $46.780 $40.000
CONDT (PVC) (SCH 80) (2") (ROCK)
LF 100.000 $17.540 $25.000
CONDT (PVC) (SCH 80) (3")
LF 100.000 $16.010 $18.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 100.000 $33.180 $35.000
CONDT (PVC) (SCH 80) (3") (BORE)(ROCK)
LF 100.000 $27.840 $45.000
CONDT (PVC) (SCH 80) (3") (ROCK)
LF 100.000 $20.430 $30.000
CONDT (PVC) (SCH 80) (4")
LF 100.000 $20.550 $20.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 100.000 $24.000 $50.000
ELEC CONDR (NO.14) BARE
LF 100.000 $1.000 $2.000
ELEC CONDR (NO.14) INSULATED
LF 100.000 $0.860 $2.000
ELEC CONDR (NO.12) BARE
LF 100.000 $1.020 $2.000
ELEC CONDR (NO.12) INSULATED
LF 100.000 $1.100 $2.000
ELEC CONDR (NO.10) BARE
LF 100.000 $1.150 $2.000
ELEC CONDR (NO.10) INSULATED
LF 100.000 $1.690 $2.000
ELEC CONDR (NO.8) BARE
LF 9,000.000 $1.110 $0.800
ELEC CONDR (NO.8) INSULATED
LF 11,000.000 $2.180 $0.850
ELEC CONDR (NO.6) BARE
LF 800.000 $1.890 $1.000
ELEC CONDR (NO.6) INSULATED
LF 1,600.000 $2.250 $2.000
ELEC CONDR (NO.4) BARE
LF 100.000 $1.850 $2.000
ELEC CONDR (NO.4) INSULATED
LF 100.000 $1.770 $3.000
ELEC CONDR (NO.2) BARE
LF 100.000 $2.350 $3.000
ELEC CONDR (NO.2) INSULATED
LF 100.000 $2.440 $4.000
GROUND BOX TY A (122311)W/APRON
EA 2.000 $1,002.280 $700.000
GROUND BOX TY C (162911)W/APRON
EA 10.000 $1,211.450 $750.000
GROUND BOX TY D (162922)W/APRON
EA 25.000 $1,058.190 $800.000
ZINC-COAT STL WIRE STRAND (1/4")
LF 1,500.000 $3.360 $1.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 1,500.000 $2.670 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 300.000 $0.710 $3.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 275.000 $3.170 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 200.000 $8.830 $9.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $108.190 $145.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 4.000 $171.750 $200.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $128.680 $215.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 500.000 $0.380 $1.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 250.000 $0.390 $1.500
ELIM EXT PAV MRK & MRKS (4")
LF 50.000 $0.550 $2.400
ELIM EXT PAV MRK & MRKS (8")
LF 50.000 $0.770 $4.000
ELIM EXT PAV MRK & MRKS (12")
LF 100.000 $1.140 $6.000
ELIM EXT PAV MRK & MRKS (24")
LF 80.000 $2.740 $9.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $54.880 $130.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 2.000 $71.790 $150.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $52.510 $155.000
PAV SURF PREP FOR MRK (4")
LF 500.000 $0.120 $0.500
PAV SURF PREP FOR MRK (8")
LF 300.000 $0.110 $1.000
PAV SURF PREP FOR MRK (12")
LF 275.000 $0.300 $1.500
PAV SURF PREP FOR MRK (24")
LF 200.000 $1.020 $2.000
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $7.870 $50.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $11.690 $75.000
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $26.330 $100.000
VEH SIG SEC (12")LED(GRN)
EA 75.000 $222.680 $180.000
VEH SIG SEC (12")LED(GRN ARW)
EA 35.000 $277.250 $180.000
VEH SIG SEC (12")LED(YEL)
EA 75.000 $234.850 $180.000
VEH SIG SEC (12")LED(YEL ARW)
EA 35.000 $223.730 $180.000
VEH SIG SEC (12")LED(RED)
EA 75.000 $224.280 $180.000
VEH SIG SEC (12")LED(RED ARW)
EA 34.000 $217.470 $180.000
PED SIG SEC (LED)(COUNTDOWN)
EA 4.000 $799.980 $400.000
BACK PLATE (12")(1 SEC)
EA 2.000 $66.890 $100.000
BACK PLATE (12")(3 SEC)
EA 100.000 $70.170 $60.000
BACK PLATE (12")(4 SEC)
EA 25.000 $77.060 $70.000
BACK PLATE (12")(5 SEC)
EA 12.000 $100.050 $85.000
LOUVER (12") (ADJUSTABLE)
EA 6.000 $220.660 $130.000
VEH SIG SEC (12")(LED)(YEL)(SOLAR)
EA 10.000 $235.560 $250.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 900.000 $1.960 $3.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 700.000 $2.930 $4.000
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 1,500.000 $3.740 $4.000
TRF SIG CBL (TY A)(16 AWG)(3 CONDR)
LF 7,000.000 $0.980 $1.000
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 1,200.000 $1.990 $1.500
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $7,216.870 $5,500.000
PED POLE ASSEMBLY
EA 3.000 $2,293.630 $2,500.000
PEDESTRIAN PUSH BUTTON POLE
EA 2.000 $1,609.840 $2,000.000
PED DETECT PUSH BUTTON (APS)
EA 4.000 $874.420 $1,000.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $2,871.850 $3,000.000
VEH LP DETECT (SAWCUT)(14 AWG)(BLK)
LF 800.000 $8.440 $5.000
INSTALL OF VEHICLE DETECTORS
LF 700.000 $6.790 $5.000
REMOVAL OF GROUND BOXES
EA 3.000 $229.960 $100.000
REMOVAL OF CABLES
LF 1,500.000 $1.740 $0.500
REMOVAL OF SPAN CABLE ASSM
LF 1,200.000 $1.310 $0.500
REPLACE OF ELECTRICAL SERVICE
EA 3.000 $3,474.450 $4,500.000
INSTALL OF ELECTRICAL SERVICE
EA 2.000 $2,000.000 $3,500.000
REMOVAL OF TIMBER POLES
EA 2.000 $309.670 $200.000
INSTALL OF TIMBER POLES
EA 2.000 $654.620 $800.000
REMOVAL OF SIGNAL HEAD ASSM
EA 8.000 $218.520 $150.000
REMOVAL OF SIGNAL RELATED SIGNS
EA 5.000 $180.400 $100.000
INSTALL OF SIGNAL RELATED SIGNS
EA 15.000 $271.850 $300.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 6.000 $54.140 $40.000
INSTALL OF FND FOR GROUND MNT CABINETS
EA 2.000 $2,935.520 $1,700.000
REPLACE OF CONTROL CABINET(GRND MNT)
EA 2.000 $1,304.970 $900.000
INSTALL OF CONTROL CABINET(GRND MNT)
EA 2.000 $2,739.110 $800.000
REMOVAL OF CONTROL CABINET(POLE MNT)
EA 1.000 $1,269.270 $300.000
REPLACE OF CONTROL CABINET(POLE MNT)
EA 1.000 $1,669.330 $600.000
INSTALL OF CONTROL CABINET(POLE MNT)
EA 2.000 $1,619.730 $500.000
REMOVAL OF FLASHER CABINET
EA 2.000 $150.000 $150.000
REPLACE OF FLASHER CABINET
EA 2.000 $1,110.530 $600.000
INSTALL OF FLASHER CABINET
EA 2.000 $300.000 $600.000
INSTALL OF FND FOR RDSD FLSH BEA ASSM
EA 5.000 $2,000.000 $2,000.000
REMOVAL OF RDSD FLSH BEACON ASSM
EA 1.000 $728.760 $900.000
REPLACE OF RDSD FLSH BEACON ASSM
EA 3.000 $4,214.140 $5,000.000
REMOVAL OF SIGNAL POLE ASSM
EA 3.000 $915.540 $250.000
REPLACE OF SIGNAL POLE ASSM
EA 6.000 $1,453.670 $800.000
INSTALL OF SIGNAL POLE ASSM
EA 8.000 $2,028.730 $700.000
REMOVAL OF PEDESTRIAN RAMPS
EA 2.000 $701.750 $250.000
INSTALL OF PEDESTRIAN RAMPS
EA 5.000 $2,368.120 $1,800.000
REMOVAL OF SIDEWALKS
SF 20.000 $125.000 $160.000
INSTALL OF SIDEWALKS
SF 20.000 $200.000 $300.000
REMOVAL OF CONCRETE FOUNDATIONS
EA 4.000 $1,115.900 $700.000
REPLACE OF LUMINAIRE HEAD
EA 3.000 $361.560 $700.000
INSTALL OF LUMINAIRE HEAD
EA 4.000 $700.000 $700.000
REPLACE OF LUMINAIRE MAST ARMS
EA 2.000 $288.830 $1,500.000
INSTALL OF LUMINAIRE MAST ARMS
EA 4.000 $600.000 $1,500.000
INS OF TRF SIG PL FND (24" DRIL SHFT)
LF 30.000 $150.000 $150.000
INS OF TRF SIG PL FND (30" DRIL SHFT)
LF 34.000 $155.000 $155.000
INS OF TRF SIG PL FND (36" DRIL SHFT)
LF 100.000 $261.300 $200.000
INS OF TRF SIG PL FND (42" DRIL SHFT)
LF 22.000 $325.000 $325.000
INS OF TRF SIG PL FND (48" DRIL SHFT)
LF 22.000 $400.000 $400.000
INSTL 12X12X6 PVC WEATHPROOF ENCLSE
EA 1.000 $100.000 $100.000
REPLACE 12X12X6 PVC WEATHPROOF ENCLSE
EA 1.000 $100.000 $100.000
INSTL DOWN GUY AND ANCHOR W/GUARD
EA 1.000 $362.390 $250.000
REPLACE DOWN GUY AND ANCHOR W/GUARD
EA 1.000 $300.000 $300.000
REMOVE DOWN GUY AND ANCHOR W/GUARD
EA 1.000 $647.400 $200.000
REMOVE PED POLE ASSM
EA 2.000 $559.550 $200.000
REPLACE LED TRAF SIG LAMP UNIT
EA 80.000 $94.400 $100.000
INSTALL LED TRAF SIG LAMP UNIT
EA 80.000 $80.000 $80.000
REPLACE PED SIG LED TRAF SIG LAMP UNIT
EA 5.000 $250.000 $250.000
INSTALL PED SGN LED TRAF SIG AMP UNIT
EA 5.000 $200.000 $200.000
REPLACE SPREAD SPECTRUM ANTENNA
EA 2.000 $140.000 $140.000
INSTALL SPREAD SPECTRUM ANTENNA
EA 2.000 $593.970 $110.000
SALVAGE TRAFFIC SIGNAL
EA 2.000 $1,650.000 $1,650.000
INSTALL LUMINAIRE POLE
EA 2.000 $250.000 $250.000
REPLACE LUMINAIRE POLE
EA 2.000 $300.000 $300.000
INSTALL RADAR VEHICLE DETECTION SYSTEM
EA 4.000 $6,000.000 $7,000.000
REPLACE RADAR VEHICLE DETECTION SYSTEM
EA 4.000 $6,500.000 $7,000.000
INSTALL FOUNDATION
EA 2.000 $1,046.680 $1,200.000
REMOVE FOUNDATION
EA 2.000 $718.820 $1,000.000
VIVDS PROCESSOR SYSTEM
EA 2.000 $5,484.330 $7,000.000
VIVDS CAMERA ASSEMBLY
EA 20.000 $1,370.650 $1,300.000
VIVDS SET-UP SYSTEM
EA 2.000 $698.650 $250.000
VIVDS COMMUNICATION CABLE (COAXIAL)
LF 800.000 $3.050 $4.000
ITS COM CBL (ETHERNET)
LF 200.000 $5.120 $5.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $7,911.650 $6,000.000
TMA (STATIONARY)
DAY 6.000 $721.480 $300.000
TMA (MOBILE OPERATION)
HR 10.000 $50.690 $100.000
RVDS(PRESENCE DETECTION ONLY)
EA 1.000 $7,452.360 $6,500.000
RVDS(ADVANCE DETECTION ONLY)
EA 1.000 $5,567.350 $6,500.000
Totals: $764,655.200 $663,817.500