Show Job Controls
Bid Cobra

TRAVIS IH0035 (6324-28-001)

Items: 88

County: TRAVIS
Length: N/A
Highway: IH0035
District: AUSTIN
Control Number: 6324-28-001
DBE Goal: N/A
Project: RMC - 632428001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $374,937.00
Date: 06/06/2018 (7 years ago)
Contract Number: N/A
Type: MAINTENANCE OF ILLUMINATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$374,937.00
Over/Under Est: -4.03% -$15,124.00
Over/Under Est: 33.33% $124,983.00
Amt Left: 38.94% $140,107.00
$546,080.00
Over/Under Est: 45.65% $171,143.00
Amt Left: 51.77% $186,267.00
Delta: -9.23% -$46,160.00

Bid Items & Bid Tabulations

88 Total 0 of 88
TRAVIS  |  IH0035  |  AUSTIN  |  6324-28-001  |  06/06/2018  |  $374,937.00  |  RMC - 632428001  |  MAINT OF ILLUM  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
VACA UNDERGROUND UTILITIES INC
IIPL USA LLC
REMOVING CONC (FOUNDATIONS)
CY 5.000 $115.000 $1,000.000 $625.000 $500.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 100.000 $182.800 $165.000 $275.000 $150.000
RIPRAP (CONC) (CL B) (4")
CY 8.000 $600.000 $600.000 $775.000 $500.000
MOBILIZATION (CALLOUT 1)
EA 15.000 $1,400.000 $1,700.000 $3,200.000 $4,000.000
MOBILIZATION (CALLOUT 2)
EA 8.000 $1,500.000 $2,200.000 $2,800.000 $4,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 20.000 $20.000 $4.000 $15.000 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 20.000 $10.000 $1.000 $8.000 $2.000
REMOVE RD IL ASM (BRIDGE MOUNT)
EA 2.000 $200.000 $350.000 $340.000 $300.000
REMOVE RD IL ASM (SHOE-BASE)
EA 2.000 $350.000 $350.000 $340.000 $1,000.000
REMOVE RD IL ASM (TRANS-BASE)
EA 2.000 $734.000 $450.000 $340.000 $1,000.000
REMOVE RD IL ASM (U/P)
EA 2.000 $500.000 $250.000 $110.000 $300.000
IN RD IL AM (TY SP) 48S-10-10 (400W) S
EA 2.000 $4,600.000 $3,175.000 $7,000.000 $3,000.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 2.000 $2,400.000 $1,400.000 $1,075.000 $2,000.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 2.000 $1,500.000 $1,400.000 $1,200.000 $2,000.000
IN RD IL (TY SA) 40S-8 (250W EQ) LED
EA 2.000 $3,500.000 $1,935.000 $7,200.000 $3,000.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 5.000 $2,800.000 $2,416.000 $7,200.000 $3,000.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 5.000 $3,500.000 $2,942.000 $7,200.000 $5,000.000
CONDT (PVC) (SCH 40) (2")
LF 1,200.000 $11.600 $8.000 $11.000 $10.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 100.000 $18.000 $50.000 $20.000 $50.000
CONDT (PVC) (SCH 40) (3")
LF 200.000 $11.000 $15.000 $17.000 $20.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 100.000 $25.000 $55.000 $30.000 $40.000
CONDT (RM) (1 1/2")
LF 100.000 $20.000 $25.000 $32.000 $30.000
CONDT (RM) (3")
LF 50.000 $40.000 $35.000 $75.000 $30.000
ELEC CONDR (NO.10) BARE
LF 1,200.000 $0.700 $1.000 $2.000 $5.000
ELEC CONDR (NO.8) INSULATED
LF 2,400.000 $2.000 $2.000 $2.000 $5.000
ELEC CONDR (NO.6) BARE
LF 100.000 $1.100 $4.000 $2.000 $10.000
ELEC CONDR (NO.6) INSULATED
LF 200.000 $1.100 $5.000 $2.000 $10.000
GROUND BOX TY A (122311)W/APRON
EA 10.000 $800.000 $900.000 $900.000 $1,000.000
REMOVE GROUND BOX
EA 2.000 $200.000 $215.000 $350.000 $500.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $700.000 $500.000 $400.000 $1,000.000
ELC SRV TY A 120/240 100(NS)SS(E)GC(O)
EA 2.000 $5,260.000 $5,260.000 $7,200.000 $6,000.000
ELC SRV TY A 240/480 100(NS)SS(E)GC(O)
EA 2.000 $6,500.000 $5,500.000 $7,300.000 $6,000.000
ELC SRV TY A 240/480 100(NS)SS(E)PS(U)
EA 4.000 $5,260.000 $5,000.000 $6,300.000 $6,000.000
INSTALL ELECTRICAL SPLICE
EA 50.000 $100.000 $150.000 $75.000 $500.000
REPAIR UNDERGROUND CONDUIT
EA 2.000 $60.000 $2,000.000 $750.000 $3,000.000
REPAIR UNDERGROUND DUCT CABLE
EA 2.000 $75.000 $2,000.000 $975.000 $3,000.000
REMOVE ROADWAY ILLUM ASSEMBLY (HPS)
EA 2.000 $832.000 $800.000 $375.000 $1,500.000
REMOVE UNDERPASS LUMINAIRE (HPS)
EA 2.000 $110.000 $300.000 $150.000 $500.000
REMOVE INDUCTION FLUORESCENT FIXTURE
EA 2.000 $260.000 $300.000 $150.000 $500.000
REMOVE LUMINAIRE FIXTURE (LED)
EA 5.000 $140.000 $350.000 $125.000 $500.000
REPLACE LUMINAIRE POLE
EA 3.000 $760.000 $2,500.000 $5,700.000 $2,000.000
MAINTAIN ROADWAY ILLUMINATION
EA 5.000 $1,200.000 $1,000.000 $150.000 $500.000
MAINTAIN HIGH MAST ILLUMINATION
EA 5.000 $3,000.000 $1,000.000 $150.000 $500.000
MAINTAIN OVERHEAD SIGN LIGHTING
EA 5.000 $1,200.000 $300.000 $150.000 $2,000.000
MAINTAIN UNDERPASS FIXTURE
EA 5.000 $500.000 $250.000 $125.000 $1,000.000
MAINTAIN INDUCTION FLUORESCENT FIXTURE
EA 5.000 $250.000 $250.000 $125.000 $500.000
REPLACE TIMBER SERVICE POLE
EA 2.000 $825.000 $500.000 $1,400.000 $1,000.000
REPLACE STEEL SERVICE POLE
EA 2.000 $1,400.000 $600.000 $1,400.000 $1,000.000
REPLACE CONCRETE SERVICE POLE
EA 2.000 $825.000 $939.000 $4,200.000 $1,500.000
INSTALL FOUNDATION
EA 1.000 $1,400.000 $1,000.000 $3,000.000 $2,000.000
REPLACE TRANSFORMER BASE
EA 10.000 $400.000 $300.000 $775.000 $500.000
REPLACE TRANSFORMER BASE COVER
EA 2.000 $75.000 $50.000 $375.000 $100.000
REPLACE HAND HOLE COVER
EA 10.000 $75.000 $50.000 $150.000 $100.000
INSTALL GROUND ROD
EA 20.000 $100.000 $50.000 $75.000 $100.000
REPLACE BALLAST
EA 2.000 $150.000 $50.000 $200.000 $100.000
REPLACE BALLAST (HIGH MAST LIGHTING)
EA 2.000 $200.000 $150.000 $250.000 $200.000
INSTALL FUSED DISCONNECT
EA 2.000 $260.000 $100.000 $625.000 $150.000
REPLACE FUSED DISCONNECT
EA 2.000 $360.000 $150.000 $575.000 $150.000
REPLACE LAMP (POLE MOUNT FIXTURE)
EA 10.000 $200.000 $150.000 $115.000 $200.000
REPLACE LAMP (UNDERPASS FIXTURE)
EA 10.000 $300.000 $50.000 $115.000 $100.000
REPLACE LAMP (WALL PACK FIXTURE)
EA 10.000 $125.000 $50.000 $115.000 $100.000
REPLACE LAMP (HIGH MAST LIGHTING)
EA 10.000 $200.000 $100.000 $115.000 $200.000
REPLACE WALL PACK LUMINAIRE
EA 5.000 $150.000 $100.000 $450.000 $100.000
REPLACE FUSE
EA 25.000 $80.000 $45.000 $50.000 $200.000
REPLACE FUSE HOLDER
EA 50.000 $120.000 $55.000 $125.000 $100.000
REPLACE BREAKAWAY FUSE HOLDER
EA 15.000 $150.000 $100.000 $125.000 $500.000
REPLACE STARTING AID
EA 10.000 $210.000 $100.000 $200.000 $100.000
REPLACE PHOTOCELL AND BRACKET
EA 10.000 $100.000 $100.000 $200.000 $150.000
REPLACE HAND-OFF-AUTO SWITCH
EA 2.000 $200.000 $100.000 $200.000 $150.000
REPLACE CONTACTOR
EA 2.000 $260.000 $250.000 $650.000 $300.000
REPLACE METER BASE
EA 2.000 $500.000 $500.000 $475.000 $1,000.000
REPLACE BREAKER PANEL
EA 2.000 $800.000 $500.000 $1,000.000 $1,000.000
INSTALL CIRCUIT BREAKER
EA 5.000 $200.000 $300.000 $375.000 $500.000
REPLACE CIRCUIT BREAKER
EA 2.000 $300.000 $500.000 $375.000 $500.000
RAISE AND LOWER RING (HIGH MAST LIGHT)
EA 5.000 $500.000 $500.000 $300.000 $4,000.000
TROUBLESHOOT FOR REPAIRS
HR 20.000 $90.000 $125.000 $100.000 $200.000
REPLACE LUMINAIRES
EA 50.000 $235.000 $150.000 $757.000 $300.000
REPLACE PHOTOCELL
EA 10.000 $100.000 $100.000 $55.000 $200.000
TMA (STATIONARY)
DAY 25.000 $280.000 $400.000 $500.000 $500.000
1 LN CLOSURE 2 LN RD NO SHOULDERS
HR 20.000 $400.000 $350.000 $225.000 $500.000
1 LN CLOSURE 2 LN RD PAVED SHOULDERS
HR 20.000 $400.000 $300.000 $225.000 $400.000
1 LN CLOSURE 4 LN RD
HR 20.000 $500.000 $250.000 $225.000 $500.000
2 LN CLOSURE 4 LN RD
HR 20.000 $500.000 $350.000 $225.000 $500.000
FREEWAY 1 LANE CLOSURE
HR 20.000 $500.000 $500.000 $225.000 $500.000
FREEWAY 2 LANE CLOSURE
HR 20.000 $500.000 $600.000 $225.000 $500.000
EXIT OR ENTRANCE RAMP CLOSURE
HR 20.000 $290.000 $150.000 $225.000 $300.000
ONE LANE FRONTAGE ROAD CLOSURE
HR 20.000 $110.000 $250.000 $225.000 $300.000
WORK AREA ON SHOULDER
HR 20.000 $30.000 $550.000 $225.000 $300.000
Totals: $374,937.000 $359,813.000 $499,920.000 $546,080.000