County: TRAVIS Highway: SL 1 Date: 10/05/2023 (1 year ago) Engineer's Estimate: $3,915,005 Control Number: 3136-01-200
Project: F 2024(152) District: AUSTIN Time: 96 WORKING DAYS Type: DRAINAGE IMPROVEMENTS
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10
Plans: Plans | Rev 1 | Rev 2 | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,915,005.30
AUSTIN UNDERGROUND INCORPORATED   $4,337,214.75 1
10.78% | $422,209.45
AARON CONCRETE CONTRACTORS, LLC   $4,894,362.40 2
25.02% | $979,357.10
12.85% | $557,147.65
CAPITAL EXCAVATION COMPANY   $6,407,742.80 3
63.67% | $2,492,737.50
47.74% | $2,070,528.05
30.92% | $1,513,380.40
FNH CONSTRUCTION, LLC   $6,740,623.00 4
72.17% | $2,825,617.70
55.41% | $2,403,408.25
5.19% | $332,880.20
JORDAN FOSTER CONSTRUCTION, LLC   $7,086,121.80 5
81% | $3,171,116.50
63.38% | $2,748,907.05
5.13% | $345,498.80
Subcontractor Percentage Amount
VORTEX LINING SYSTEMS, LLC 31.79% $1,378,800.57
ENVIRONMENTAL SAFETY SERVICES, INC. 0.94% $40,769.82
AUSTIN WOOD RECYCLING 0.65% $28,191.90
TEXAS TRAFFIC AND BARRICADE, LLC 0.18% $7,806.99
MG DRILLING, LLC 0.09% $3,903.49
(INACTIVE)M.G. DRILLING 0.09% $3,903.49
STRIPE IT UP, LLC 0.08% $3,469.77
ENVIRONMENTAL SUPPORT SERVICES, INC. 0.00% $0.00
Total: 33.82% $1,466,846.03

Bid Items

Items: 44, 0 filtered
TRAVIS SL 1  |  AUSTIN  |  3136-01-200  |  10/05/2023  |  $3,915,005  |  F 2024(152)  |  DRAINAGE IMPRVS  |  96 WORKING DAYS
Alt Item code Description Unit Quantity Engineer's Estimate AUSTIN UNDERGROUND INCORPORATED AARON CONCRETE CONTRACTORS, LLC CAPITAL EXCAVATION COMPANY FNH CONSTRUCTION, LLC JORDAN FOSTER CONSTRUCTION, LLC
100 6002 PREPARING ROW STA 4.000 $4,000.000 $50,000.000 $12,000.000 $19,000.000 $95,000.000 $145,000.000
110 6001 EXCAVATION (ROADWAY) CY 100.000 $60.000 $150.000 $120.000 $108.000 $25.000 $65.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 100.000 $60.000 $77.000 $65.000 $121.000 $80.000 $180.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 2,400.000 $2.000 $13.000 $8.000 $9.750 $8.000 $20.000
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 2,400.000 $1.000 $0.400 $0.350 $0.400 $1.000 $3.000
168 6001 VEGETATIVE WATERING MG 37.000 $20.000 $42.000 $35.000 $76.200 $50.000 $85.000
169 6003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY 2,400.000 $3.000 $2.000 $1.500 $1.950 $10.500 $2.350
351 6011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(18") SY 133.000 $100.000 $220.000 $480.000 $370.000 $200.000 $390.000
401 6001 FLOWABLE BACKFILL CY 736.000 $250.000 $225.000 $615.000 $320.000 $350.000 $265.000
402 6001 TRENCH EXCAVATION PROTECTION LF 296.000 $25.000 $8.500 $22.000 $35.050 $10.000 $13.000
431 6004 PNEUMATICALLY PLACED CON-66"PIPE LINER SF 2,868.000 $144.700 $120.000 $125.000 $165.000 $0.000 $160.000
431 6005 PNEUMATICALLY PLACED CON-96"PIPE LINER SF 15,155.000 $139.230 $141.000 $125.000 $165.000 $0.000 $185.000
432 6004 RIPRAP CONC (8 IN) CY 14.000 $325.000 $1,300.000 $1,400.000 $1,370.000 $1,000.000 $1,200.000
432 6035 RIPRAP (STONE PROTECTION)(24 IN) CY 20.000 $350.000 $390.000 $1,000.000 $550.000 $300.000 $800.000
464 6005 RC PIPE (CL III)(24 IN) LF 158.500 $125.000 $140.000 $124.000 $162.000 $150.000 $300.000
464 6007 RC PIPE (CL III)(30 IN) LF 20.000 $160.000 $280.000 $218.000 $350.000 $180.000 $400.000
464 6008 RC PIPE (CL III)(36 IN) LF 83.000 $200.000 $260.000 $185.000 $270.000 $250.000 $350.000
465 6005 JCTBOX(COMPL)(PJB)(3FTX3FT) EA 2.000 $5,000.000 $6,300.000 $4,500.000 $6,500.000 $16,500.000 $12,000.000
465 6006 JCTBOX(COMPL)(PJB)(4FTX4FT) EA 3.000 $6,500.000 $8,800.000 $5,400.000 $8,100.000 $18,500.000 $14,000.000
476 6014 JACK BOR OR TUN PIPE(24 IN)(RC)(CL IV) LF 104.500 $1,100.000 $1,200.000 $995.000 $3,010.000 $3,000.000 $2,600.000
476 6113 JACK BOR OR TUN PIPE(96")TUNNEL LINING LF 80.000 $3,505.680 $4,400.000 $5,500.000 $16,000.000 $0.000 $16,050.000
480 6002 CLEAN EXIST CULVERTS CY 30.000 $200.000 $390.000 $20,000.000 $650.000 $1,500.000 $1,200.000
500 6001 MOBILIZATION LS 1.000 $345,746.800 $380,000.000 $465,000.000 $540,000.000 $750,000.000 $700,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $5,000.000 $25,000.000 $5,500.000 $50,000.000 $8,500.000 $23,000.000
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 30.000 $70.000 $140.000 $102.000 $134.000 $30.000 $125.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 30.000 $15.000 $35.000 $32.000 $66.800 $15.000 $62.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 333.000 $25.000 $68.000 $50.000 $23.400 $50.000 $22.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 333.000 $12.000 $20.000 $18.000 $16.700 $20.000 $15.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,189.000 $6.000 $6.000 $4.500 $4.700 $4.000 $4.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,189.000 $2.000 $0.750 $0.600 $0.650 $2.000 $0.700
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 40.000 $8.000 $7.000 $5.000 $8.700 $18.000 $9.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 40.000 $3.000 $2.500 $2.500 $1.350 $9.000 $1.300
512 6089 PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL) LF 1,750.000 $75.000 $31.000 $52.000 $99.900 $100.000 $34.000
512 6091 PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL) LF 1,750.000 $20.000 $24.000 $26.000 $24.200 $30.000 $32.000
529 6008 CONC CURB & GUTTER (TY II) LF 100.000 $40.000 $32.000 $65.000 $58.100 $55.000 $50.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 4.000 $1,000.000 $1,200.000 $1,600.000 $12,400.000 $3,000.000 $1,400.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 4.000 $10,000.000 $11,000.000 $15,000.000 $710.000 $30,000.000 $15,000.000
666 6141 REFL PAV MRK TY I (Y)12"(SLD)(100MIL) LF 119.000 $7.000 $50.000 $34.000 $20.850 $6.000 $42.000
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 100.000 $4.000 $11.000 $8.000 $13.050 $6.000 $10.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $9,000.000 $15,000.000 $3,600.000 $26,100.000 $16,500.000 $18,000.000
6185 6002 TMA (STATIONARY) DAY 20.000 $500.000 $290.000 $250.000 $560.000 $250.000 $650.000
7016 6210 CASING (STEEL)(18")(BORE) LF 32.000 $500.000 $940.000 $670.000 $1,960.000 $500.000 $800.000
1 476 6111 JACK BOR OR TUN PIPE(48")TUNNEL LINING LF 166.000 $2,500.000 $0.000 $0.000 $0.000 $5,000.000 $0.000
1 476 6112 JACK BOR OR TUN PIPE(78")TUNNEL LINING LF 683.000 $3,500.000 $0.000 $0.000 $0.000 $5,000.000 $0.000
Totals: $6,720,489.95 $4,337,214.75 $4,894,362.40 $6,407,742.80 $6,740,623.00 $7,086,121.80