|
|
PREPARING ROW
|
STA
|
30.000
|
$1,500.000
|
$2,000.000
|
$1,000.000
|
$3,850.000
|
$4,000.000
|
$3,850.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
218.000
|
$40.000
|
$15.000
|
$30.000
|
$24.000
|
$14.000
|
$16.500
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
2,219.000
|
$5.000
|
$3.500
|
$6.500
|
$8.500
|
$8.000
|
$13.750
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
54.000
|
$17.000
|
$14.000
|
$32.000
|
$24.000
|
$14.000
|
$24.750
|
|
|
REMOVING STAB BASE & ASPH PAV(16")
|
SY
|
1,927.000
|
$4.000
|
$8.500
|
$7.000
|
$20.000
|
$10.000
|
$5.400
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-14")
|
SY
|
146.000
|
$6.000
|
$18.000
|
$38.000
|
$35.000
|
$12.000
|
$7.100
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
2,329.000
|
$5.250
|
$1.000
|
$9.000
|
$3.500
|
$8.000
|
$8.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,300.000
|
$11.000
|
$12.000
|
$27.000
|
$30.000
|
$18.000
|
$9.630
|
|
|
EXCAVATION (ROADWAY AND CHANNEL)
|
CY
|
1,051.000
|
$27.930
|
$12.000
|
$16.000
|
$37.000
|
$18.000
|
$9.630
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
6,159.000
|
$10.000
|
$15.000
|
$28.000
|
$25.000
|
$35.000
|
$24.200
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
9,513.000
|
$1.500
|
$1.000
|
$3.000
|
$5.500
|
$1.400
|
$24.200
|
|
|
DRILL SEEDING (PERM) (URBAN) (CLAY)
|
SY
|
7,438.000
|
$0.400
|
$0.800
|
$0.300
|
$0.600
|
$0.250
|
$1.290
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
2,075.000
|
$0.150
|
$0.500
|
$0.350
|
$0.750
|
$0.300
|
$1.270
|
|
|
VEGETATIVE WATERING
|
MG
|
191.000
|
$16.690
|
$9.500
|
$35.000
|
$45.000
|
$55.000
|
$80.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
9,513.000
|
$1.200
|
$1.500
|
$1.650
|
$2.000
|
$1.500
|
$2.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
1,874.000
|
$50.000
|
$50.000
|
$55.000
|
$65.000
|
$80.000
|
$71.340
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
796.000
|
$3.890
|
$4.950
|
$5.700
|
$6.000
|
$8.000
|
$5.500
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
82.000
|
$150.000
|
$190.000
|
$207.000
|
$205.000
|
$125.000
|
$170.500
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
103.000
|
$102.000
|
$190.000
|
$213.000
|
$300.000
|
$125.000
|
$352.000
|
|
|
TOM - C (AGGREGATE) SAC - B
|
TON
|
1,130.000
|
$100.000
|
$122.000
|
$127.000
|
$125.000
|
$125.000
|
$170.500
|
|
|
TACK COAT
|
GAL
|
1,688.000
|
$3.000
|
$2.850
|
$3.300
|
$3.500
|
$3.000
|
$3.300
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
|
SY
|
1,489.000
|
$17.500
|
$16.000
|
$16.700
|
$18.000
|
$17.000
|
$33.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 1")
|
SY
|
14,886.000
|
$3.000
|
$2.000
|
$1.450
|
$1.500
|
$2.000
|
$2.200
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
2,180.000
|
$1.730
|
$3.000
|
$2.500
|
$3.000
|
$5.000
|
$5.500
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
53.000
|
$162.000
|
$80.000
|
$120.000
|
$190.000
|
$80.000
|
$245.940
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
457.000
|
$10.000
|
$1.000
|
$2.500
|
$6.000
|
$35.000
|
$24.670
|
|
|
TEMPORARY SPL SHORING
|
SF
|
825.000
|
$23.000
|
$1.000
|
$10.000
|
$21.000
|
$35.000
|
$26.400
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
136.000
|
$250.000
|
$300.000
|
$280.000
|
$300.000
|
$260.000
|
$231.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
14.000
|
$500.000
|
$600.000
|
$670.000
|
$730.000
|
$620.000
|
$357.500
|
|
|
CL B CONC (MISC)
|
CY
|
21.000
|
$390.000
|
$550.000
|
$585.000
|
$390.000
|
$650.000
|
$900.950
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
5.950
|
$450.000
|
$800.000
|
$608.000
|
$620.000
|
$470.000
|
$536.130
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
9.440
|
$450.000
|
$600.000
|
$620.000
|
$600.000
|
$480.000
|
$541.840
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
32.000
|
$400.000
|
$550.000
|
$602.000
|
$610.000
|
$550.000
|
$532.810
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
53.000
|
$115.000
|
$125.000
|
$182.000
|
$180.000
|
$180.000
|
$137.500
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
865.000
|
$60.000
|
$50.000
|
$82.000
|
$77.000
|
$52.000
|
$40.700
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
30.000
|
$150.000
|
$250.000
|
$196.000
|
$260.000
|
$280.000
|
$166.100
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$4,349.000
|
$3,500.000
|
$2,220.000
|
$4,100.000
|
$8,000.000
|
$4,950.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
5.000
|
$4,541.000
|
$4,750.000
|
$3,000.000
|
$3,000.000
|
$4,800.000
|
$5,170.000
|
|
|
INLET (COMPL)(PCO)(6FT)(NONE)
|
EA
|
2.000
|
$2,234.550
|
$4,800.000
|
$2,840.000
|
$5,400.000
|
$5,900.000
|
$5,170.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
1.000
|
$9,500.000
|
$9,500.000
|
$26,000.000
|
$21,000.000
|
$15,000.000
|
$10,010.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
1.000
|
$1,200.000
|
$450.000
|
$2,700.000
|
$1,300.000
|
$1,000.000
|
$2,035.000
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$550.000
|
$600.000
|
$1,400.000
|
$610.000
|
$1,200.000
|
$750.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$1,500.000
|
$600.000
|
$2,400.000
|
$1,800.000
|
$1,300.000
|
$1,650.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,500.000
|
$600.000
|
$2,400.000
|
$1,800.000
|
$1,300.000
|
$1,300.000
|
|
|
REMOV STR (PIPE)
|
LF
|
90.000
|
$14.700
|
$15.000
|
$52.000
|
$22.000
|
$25.000
|
$15.280
|
|
|
REMOV STR (PIPE)
|
EA
|
1.000
|
$1,200.000
|
$250.000
|
$2,400.000
|
$6,500.000
|
$1,900.000
|
$775.500
|
|
|
REMOV STR (SLOTTED DRAIN INLET)
|
LF
|
60.000
|
$11.500
|
$10.000
|
$40.000
|
$37.000
|
$28.000
|
$13.750
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$62,206.000
|
$150,000.000
|
$100,000.000
|
$95,000.000
|
$200,000.000
|
$77,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$8,000.000
|
$11,000.000
|
$1,500.000
|
$3,300.000
|
$900.000
|
$8,250.000
|
|
|
SANDBAGS FOR EROSION CONTROL (6")
|
LF
|
325.000
|
$10.000
|
$4.500
|
$7.000
|
$6.500
|
$6.500
|
$5.750
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,953.000
|
$2.750
|
$2.500
|
$4.000
|
$3.000
|
$3.500
|
$3.850
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,953.000
|
$0.750
|
$0.350
|
$1.100
|
$0.600
|
$1.000
|
$1.650
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
720.000
|
$30.000
|
$20.000
|
$12.000
|
$63.000
|
$85.000
|
$81.400
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
720.000
|
$9.000
|
$6.000
|
$12.000
|
$3.500
|
$12.000
|
$27.500
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
720.000
|
$20.000
|
$12.000
|
$12.000
|
$9.500
|
$40.000
|
$27.500
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
3,603.000
|
$20.000
|
$18.000
|
$16.000
|
$19.000
|
$45.000
|
$25.850
|
|
|
CONC SIDEWALKS (5")
|
SY
|
252.000
|
$52.000
|
$58.000
|
$76.000
|
$76.000
|
$70.000
|
$65.480
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
950.000
|
$21.500
|
$20.000
|
$25.000
|
$27.000
|
$19.500
|
$21.450
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,400.000
|
$1,000.000
|
$1,300.000
|
$1,400.000
|
$970.000
|
$1,067.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
1.000
|
$411.000
|
$800.000
|
$855.000
|
$1,100.000
|
$750.000
|
$825.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
817.000
|
$2.550
|
$1.250
|
$2.200
|
$2.000
|
$1.250
|
$1.380
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$2,650.000
|
$2,500.000
|
$3,062.000
|
$3,100.000
|
$2,180.000
|
$2,398.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$500.000
|
$120.000
|
$220.000
|
$170.000
|
$120.000
|
$132.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,300.000
|
$1,000.000
|
$1,400.000
|
$1,500.000
|
$1,100.000
|
$1,210.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$800.000
|
$1,000.000
|
$820.000
|
$700.000
|
$500.000
|
$550.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(W)(TL3)
|
EA
|
1.000
|
$7,500.000
|
$10,000.000
|
$790.000
|
$12,000.000
|
$7,200.000
|
$9,350.000
|
|
|
REMOVE RD IL ASM (SHOE-BASE)
|
EA
|
1.000
|
$625.000
|
$500.000
|
$570.000
|
$620.000
|
$530.000
|
$715.000
|
|
|
REPLACE LUMINAIRE W/LED (250W EQ)
|
EA
|
4.000
|
$619.860
|
$575.000
|
$655.000
|
$710.000
|
$600.000
|
$687.500
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
17.000
|
$3,100.000
|
$4,000.000
|
$4,100.000
|
$4,500.000
|
$3,750.000
|
$3,979.410
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
3,650.000
|
$10.000
|
$12.500
|
$14.000
|
$16.000
|
$14.000
|
$11.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
360.000
|
$32.000
|
$31.000
|
$35.000
|
$38.000
|
$63.000
|
$11.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
855.000
|
$35.000
|
$33.250
|
$38.000
|
$41.000
|
$35.000
|
$20.900
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
15.000
|
$16.000
|
$20.000
|
$23.000
|
$25.000
|
$21.000
|
$22.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
180.000
|
$35.000
|
$52.750
|
$60.000
|
$65.000
|
$55.000
|
$11.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
4,600.000
|
$1.300
|
$1.150
|
$1.300
|
$1.500
|
$1.250
|
$1.760
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
7,480.000
|
$1.340
|
$1.250
|
$1.400
|
$1.500
|
$1.400
|
$2.150
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
5.000
|
$1.860
|
$2.000
|
$2.300
|
$2.500
|
$2.100
|
$2.310
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
6.000
|
$928.000
|
$1,000.000
|
$1,100.000
|
$1,200.000
|
$1,000.000
|
$715.000
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$326.000
|
$250.000
|
$285.000
|
$310.000
|
$261.000
|
$385.000
|
|
|
ELC SRV TY A 120/240 100(NS)AL(E)PS(U)
|
EA
|
1.000
|
$5,248.640
|
$10,000.000
|
$7,100.000
|
$7,800.000
|
$6,505.000
|
$4,895.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$550.000
|
$480.000
|
$525.000
|
$670.000
|
$490.000
|
$528.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$550.000
|
$600.000
|
$656.000
|
$840.000
|
$571.000
|
$660.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$800.000
|
$1,050.000
|
$1,150.000
|
$1,500.000
|
$1,075.000
|
$1,155.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$421.000
|
$420.000
|
$460.000
|
$590.000
|
$491.000
|
$462.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
2.000
|
$500.000
|
$500.000
|
$550.000
|
$700.000
|
$592.000
|
$550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$89.000
|
$50.000
|
$55.000
|
$70.000
|
$150.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
|
EA
|
9.000
|
$55.000
|
$25.000
|
$28.000
|
$35.000
|
$55.000
|
$27.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
400.000
|
$1.250
|
$1.500
|
$0.900
|
$1.000
|
$0.750
|
$1.650
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
55.000
|
$1.600
|
$1.500
|
$0.900
|
$1.000
|
$0.750
|
$1.650
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
200.000
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
$1.000
|
$3.040
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,935.000
|
$0.620
|
$0.800
|
$0.900
|
$1.000
|
$0.800
|
$3.040
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,011.000
|
$0.800
|
$0.800
|
$0.900
|
$1.000
|
$0.800
|
$3.040
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
692.000
|
$2.870
|
$3.000
|
$3.300
|
$4.000
|
$3.000
|
$3.960
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
24.000
|
$3.000
|
$3.000
|
$3.300
|
$4.000
|
$3.000
|
$3.960
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
48.000
|
$5.760
|
$8.000
|
$9.000
|
$8.000
|
$8.000
|
$6.920
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
24.000
|
$7.600
|
$8.000
|
$9.000
|
$8.000
|
$8.000
|
$6.920
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
2.000
|
$120.000
|
$150.000
|
$165.000
|
$180.000
|
$150.000
|
$287.380
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$150.000
|
$150.000
|
$165.000
|
$180.000
|
$150.000
|
$328.080
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
2.000
|
$140.000
|
$150.000
|
$165.000
|
$180.000
|
$150.000
|
$287.380
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$150.000
|
$150.000
|
$165.000
|
$180.000
|
$150.000
|
$328.080
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
4,129.000
|
$0.250
|
$0.250
|
$0.300
|
$1.000
|
$0.250
|
$0.400
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
1,144.000
|
$0.130
|
$0.250
|
$0.300
|
$1.000
|
$0.250
|
$0.480
|
|
REFL PAV MRK TY II (W) 8" (DOT)
|
LF
|
200.000
|
$0.400
|
$0.500
|
$0.550
|
$1.000
|
$0.500
|
$1.380
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
3,946.000
|
$0.500
|
$0.500
|
$0.550
|
$1.000
|
$0.500
|
$0.820
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
716.000
|
$1.500
|
$1.500
|
$1.650
|
$3.000
|
$1.500
|
$5.380
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
72.000
|
$2.820
|
$3.000
|
$3.300
|
$5.000
|
$3.000
|
$3.820
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
6.000
|
$61.000
|
$63.000
|
$69.000
|
$100.000
|
$63.000
|
$137.500
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
6.000
|
$74.000
|
$67.000
|
$73.000
|
$100.000
|
$67.000
|
$194.700
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
1,706.000
|
$0.160
|
$0.250
|
$0.300
|
$1.000
|
$0.250
|
$0.970
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
4,129.000
|
$0.550
|
$0.740
|
$0.800
|
$0.500
|
$0.740
|
$0.800
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
1,144.000
|
$0.300
|
$1.200
|
$1.300
|
$0.500
|
$1.200
|
$0.480
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
1,706.000
|
$0.350
|
$1.200
|
$1.300
|
$0.500
|
$1.200
|
$0.480
|
|
REFL PAV MRKR TY I-C
|
EA
|
182.000
|
$3.300
|
$8.000
|
$9.000
|
$8.000
|
$8.000
|
$4.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
16.000
|
$3.440
|
$8.000
|
$9.000
|
$8.000
|
$8.000
|
$5.500
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
1.000
|
$500.000
|
$350.000
|
$342.000
|
$370.000
|
$313.000
|
$224.400
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
1.000
|
$500.000
|
$350.000
|
$342.000
|
$370.000
|
$313.000
|
$224.400
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
1.000
|
$500.000
|
$350.000
|
$342.000
|
$370.000
|
$313.000
|
$224.400
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
165.000
|
$2.000
|
$1.850
|
$2.100
|
$2.500
|
$2.000
|
$3.330
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
80.000
|
$4.000
|
$2.000
|
$2.300
|
$2.500
|
$2.100
|
$6.880
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
200.000
|
$6.000
|
$5.500
|
$6.300
|
$7.000
|
$5.800
|
$6.600
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
405.000
|
$2.000
|
$1.450
|
$1.650
|
$2.000
|
$1.510
|
$2.310
|
|
|
RELOC TRF SG PL AM(S)SNGL MST ARM POLE
|
EA
|
1.000
|
$4,100.000
|
$8,000.000
|
$7,700.000
|
$8,400.000
|
$7,100.000
|
$3,650.000
|
|
|
PEDESTRIAN PUSH BUTTON POLE
|
EA
|
1.000
|
$2,000.000
|
$2,500.000
|
$2,500.000
|
$2,700.000
|
$2,238.000
|
$420.200
|
|
|
INSTALL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
1.000
|
$709.000
|
$450.000
|
$485.000
|
$530.000
|
$443.000
|
$520.000
|
|
|
REMOVAL OF TRAFFIC SIGNAL POLE FND
|
LF
|
14.000
|
$800.000
|
$130.000
|
$150.000
|
$160.000
|
$136.000
|
$547.500
|
|
|
REROUTE CABLES
|
LF
|
560.000
|
$5.000
|
$1.500
|
$1.700
|
$2.000
|
$1.600
|
$4.910
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
805.000
|
$68.460
|
$82.000
|
$92.000
|
$95.000
|
$90.000
|
$137.500
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
218.000
|
$82.000
|
$120.000
|
$136.000
|
$135.000
|
$122.000
|
$203.500
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
186.000
|
$79.920
|
$97.000
|
$110.000
|
$110.000
|
$122.000
|
$225.500
|
|
|
TACK COAT
|
GAL
|
572.000
|
$3.000
|
$2.850
|
$3.300
|
$3.500
|
$2.500
|
$3.300
|
|
|
UNDERSEAL COURSE
|
GAL
|
76.000
|
$3.300
|
$2.850
|
$3.300
|
$3.500
|
$3.100
|
$3.300
|
|
|
REMOVE UNDERGROUND CONDUIT
|
LF
|
350.000
|
$13.590
|
$5.000
|
$5.700
|
$6.000
|
$4.100
|
$13.440
|
|
|
REMOVE GROUND BOX
|
EA
|
3.000
|
$203.500
|
$250.000
|
$285.000
|
$310.000
|
$130.000
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
130.000
|
$80.000
|
$100.000
|
$82.000
|
$170.000
|
$75.000
|
$159.500
|
|
|
CONDUIT (PREPARE)
|
LF
|
780.000
|
$3.000
|
$1.250
|
$1.400
|
$1.500
|
$1.700
|
$9.820
|
|
|
TMA (STATIONARY)
|
DAY
|
130.000
|
$200.000
|
$125.000
|
$165.000
|
$180.000
|
$85.000
|
$209.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$230.000
|
$60.000
|
$82.000
|
$45.000
|
$85.000
|
$82.500
|
|
Totals: |
$1,384,917.890
|
$1,525,579.260
|
$1,667,420.350
|
$1,944,141.350
|
$2,075,419.560
|
$2,220,234.303
|