Job Info for 1378-01-051

County: TRAVIS Highway: RM 1431 Date: 06/28/2023 (1 year ago) Engineer's Estimate: $4,492,164 Control Number: 1378-01-051
Project: STP 2023(989)HES District: AUSTIN Time: 232 WORKING DAYS Type: HAZARD ELIMINATION & SAFETY
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $4,492,163.70
AUSTIN UNDERGROUND INCORPORATED   $5,205,668.65 1
15.88% | $713,504.95
AUSTIN ENGINEERING CO., INC.   $5,351,122.53 2
19.12% | $858,958.83
2.79% | $145,453.88
FNH CONSTRUCTION, LLC   $5,950,741.10 3
32.47% | $1,458,577.40
14.31% | $745,072.45
11.21% | $599,618.57
HUNTER INDUSTRIES, LTD.   $6,527,364.73 4
45.31% | $2,035,201.03
25.39% | $1,321,696.08
9.69% | $576,623.63
AARON CONCRETE CONTRACTORS, LLC   $7,885,639.00 5
75.54% | $3,393,475.30
51.48% | $2,679,970.35
20.81% | $1,358,274.27
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 24.62% $1,281,635.62
ROADWAY SPECIALTIES, INC. 2.26% $117,648.11
ENVIRONMENTAL SAFETY SERVICES, INC. 1.52% $79,126.16
D. I. J. CONSTRUCTION, INC. 1.30% $67,673.69
TEXAS TRAFFIC AND BARRICADE, LLC 0.39% $20,302.11
AREA WIDE PROTECTIVE, INC. 0.26% $13,534.74
STRIPE IT UP, LLC 0.10% $5,205.67
Total: 30.45% $1,585,126.10

Bid Items

Items: 92, 0 filtered
TRAVIS RM 1431  |  AUSTIN  |  1378-01-051  |  06/28/2023  |  $4,492,164  |  STP 2023(989)HES  |  HAZARD ELIM & SAFETY  |  232 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate AUSTIN UNDERGROUND INCORPORATED AUSTIN ENGINEERING CO., INC. FNH CONSTRUCTION, LLC HUNTER INDUSTRIES, LTD. AARON CONCRETE CONTRACTORS, LLC
100 6002 PREPARING ROW STA 53.000 $5,000.000 $5,350.000 $1,163.000 $8,000.000 $4,700.000 $6,500.000
104 6009 REMOVING CONC (RIPRAP) SY 3,196.000 $10.000 $14.000 $8.000 $30.000 $24.500 $50.000
104 6031 REMOVING CONC (HEADWALL) CY 10.000 $600.000 $110.000 $71.000 $500.000 $1,050.000 $2,500.000
104 6054 REMOVING CONCRETE(MOW STRIP) LF 1,199.000 $10.000 $6.500 $3.000 $20.000 $17.500 $16.000
105 6011 REMOVING STAB BASE AND ASPH PAV (2"-6") SY 5,748.000 $8.000 $12.000 $1.000 $20.000 $14.000 $12.000
110 6001 EXCAVATION (ROADWAY) CY 9,426.000 $17.000 $26.000 $21.000 $20.000 $38.500 $55.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 3,943.000 $20.000 $14.000 $27.000 $35.000 $38.500 $75.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 22,233.000 $2.000 $3.250 $2.500 $6.000 $3.880 $5.000
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 22,233.000 $0.300 $0.400 $0.400 $1.000 $0.350 $0.400
164 6071 BROADCAST SEED (TEMP)(WARM OR COOL) SY 11,117.000 $0.400 $0.300 $0.310 $1.000 $0.270 $0.350
168 6001 VEGETATIVE WATERING MG 3,307.000 $12.000 $33.000 $8.000 $25.000 $31.500 $35.000
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 22,233.000 $1.200 $1.250 $1.320 $5.000 $1.180 $1.500
247 6366 FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS) CY 2,411.000 $56.000 $77.000 $93.000 $60.000 $117.700 $150.000
310 6001 PRIME COAT (MULTI OPTION) GAL 2,170.000 $5.500 $4.500 $4.000 $6.000 $7.900 $5.000
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 500.000 $50.190 $100.000 $30.000 $75.000 $136.400 $108.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 24,564.000 $5.000 $1.500 $1.500 $6.000 $3.230 $1.500
400 6006 CUT & RESTORING PAV SY 520.000 $125.000 $150.000 $105.000 $200.000 $190.420 $650.000
402 6001 TRENCH EXCAVATION PROTECTION LF 580.000 $5.000 $10.000 $12.000 $10.000 $89.860 $25.000
403 6001 TEMPORARY SPL SHORING SF 10,551.000 $20.000 $4.750 $12.000 $35.000 $45.070 $50.000
432 6001 RIPRAP (CONC)(4 IN) CY 191.000 $635.000 $460.000 $1,400.000 $500.000 $768.150 $1,000.000
432 6027 RIPRAP (STONE COMMON)(DRY)(24 IN) CY 142.300 $250.000 $240.000 $310.000 $250.000 $286.700 $115.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 172.000 $600.000 $570.000 $729.000 $550.000 $795.800 $800.000
462 6002 CONC BOX CULV (3 FT X 3 FT) LF 124.000 $420.000 $560.000 $1,335.000 $650.000 $697.830 $1,200.000
462 6005 CONC BOX CULV (4 FT X 4 FT) LF 88.000 $480.000 $540.000 $1,066.000 $700.000 $974.290 $1,600.000
462 6039 CONC BOX CULV (11 FT X 11 FT) LF 112.000 $1,500.000 $2,100.000 $3,470.000 $2,000.000 $2,898.700 $3,200.000
464 6003 RC PIPE (CL III)(18 IN) LF 200.000 $80.000 $87.000 $129.000 $85.000 $214.410 $145.000
464 6033 RC PIPE (ARCH)(CL III)(DES 4) LF 48.000 $320.000 $260.000 $315.000 $300.000 $473.490 $440.000
464 6034 RC PIPE (ARCH)(CL III)(DES 5) LF 176.000 $450.000 $480.000 $1,077.000 $400.000 $633.990 $890.000
466 6112 HEADWALL (CH - PW - A - 0) (DES= 5) EA 1.000 $10,000.000 $45,000.000 $9,008.000 $25,000.000 $30,502.270 $25,000.000
466 6153 WINGWALL (FW - 0) (HW=6 FT) EA 1.000 $15,000.000 $36,000.000 $15,623.000 $25,000.000 $20,285.110 $32,000.000
466 6174 WINGWALL (PW - 1) (HW=13 FT) EA 2.000 $55,000.000 $58,000.000 $81,000.000 $60,000.000 $82,430.650 $105,000.000
466 6180 WINGWALL (PW - 1) (HW=5 FT) EA 1.000 $20,000.000 $28,000.000 $12,000.000 $28,500.000 $21,133.090 $26,000.000
466 6183 WINGWALL (PW - 1) (HW=8 FT) EA 2.000 $36,000.000 $46,000.000 $26,500.000 $35,000.000 $42,981.720 $42,000.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 8.000 $1,250.000 $5,400.000 $2,000.000 $1,850.000 $2,907.670 $2,600.000
467 6555 SET (TY II) (DES 4) (RCP) (6: 1) (P) EA 2.000 $5,500.000 $9,100.000 $5,236.000 $6,500.000 $12,475.350 $5,100.000
467 6611 SET (TY II) (DES 5) (RCP) (3: 1) (C) EA 1.000 $6,000.000 $19,000.000 $7,600.000 $7,500.000 $19,821.680 $5,200.000
496 6004 REMOV STR (SET) EA 10.000 $600.000 $1,000.000 $1,518.000 $850.000 $1,912.100 $1,500.000
496 6007 REMOV STR (PIPE) LF 872.000 $20.000 $20.000 $36.000 $50.000 $159.630 $33.000
500 6001 MOBILIZATION LS 1.000 $400,000.000 $400,000.000 $325,000.000 $580,000.000 $444,607.270 $730,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 14.000 $8,000.000 $9,500.000 $7,557.000 $8,500.000 $6,747.430 $10,000.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 60.000 $36.000 $35.000 $41.000 $30.000 $35.530 $45.000
506 6004 ROCK FILTER DAMS (INSTALL) (TY 4) LF 131.000 $55.000 $50.000 $59.000 $50.000 $51.370 $64.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 191.000 $20.000 $32.000 $12.000 $15.000 $32.650 $41.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 5,195.000 $6.000 $5.000 $5.000 $18.000 $4.670 $6.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 5,195.000 $2.000 $0.600 $0.620 $9.000 $0.550 $0.700
530 6004 DRIVEWAYS (CONC) SY 209.000 $115.000 $130.000 $118.000 $85.000 $142.680 $130.000
530 6005 DRIVEWAYS (ACP) SY 414.000 $110.000 $150.000 $95.000 $55.000 $101.200 $110.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 3,630.000 $27.000 $27.000 $29.000 $25.000 $23.790 $37.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 6.000 $1,400.000 $1,700.000 $1,731.000 $1,850.000 $1,471.550 $2,300.000
540 6017 MTL BM GD FEN (LONG SPAN SYSTEM) LF 50.000 $38.000 $29.000 $31.000 $50.000 $25.590 $39.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,145.000 $4.000 $3.500 $3.000 $3.000 $3.150 $6.700
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 4.000 $250.000 $370.000 $377.000 $500.000 $320.450 $172.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 6.000 $3,500.000 $4,100.000 $4,201.000 $3,250.000 $3,571.080 $4,800.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 3.000 $350.000 $370.000 $377.000 $850.000 $320.450 $345.000
556 6008 PIPE UNDERDRAINS (TY 8) (6") LF 3,110.000 $32.000 $38.000 $71.000 $65.000 $87.310 $51.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 10.000 $800.000 $1,100.000 $960.000 $1,150.000 $777.000 $980.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 9.000 $700.000 $800.000 $960.000 $850.000 $777.000 $870.000
644 6070 RELOCATE SM RD SN SUP&AM TY S80 EA 3.000 $800.000 $800.000 $960.000 $850.000 $777.000 $1,100.000
658 6047 INSTL OM ASSM (OM-2Y)(WC)GND EA 4.000 $64.000 $275.000 $95.000 $100.000 $77.000 $94.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 10,508.000 $0.250 $0.700 $0.500 $0.700 $0.450 $0.550
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 2,627.000 $0.250 $0.700 $0.500 $0.750 $0.450 $0.550
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 10,508.000 $0.250 $0.700 $0.500 $0.750 $0.450 $0.550
662 6080 WK ZN PAV MRK REMOV (W)(ARROW) EA 10.000 $175.000 $230.000 $197.000 $250.000 $167.450 $200.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 7,880.000 $1.000 $2.300 $0.500 $6.000 $1.630 $1.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 8,406.000 $1.500 $2.300 $0.500 $6.000 $1.630 $2.000
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 400.000 $1.750 $2.000 $1.300 $2.000 $1.110 $1.300
666 6054 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 10.000 $200.000 $350.000 $217.000 $350.000 $184.200 $220.000
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 1.000 $275.000 $375.000 $340.000 $350.000 $287.810 $342.000
666 6171 REFL PAV MRK TY II (W) 6" (BRK) LF 5,254.000 $0.300 $0.240 $0.400 $0.500 $0.360 $0.400
666 6174 REFL PAV MRK TY II (W) 6" (SLD) LF 10,508.000 $0.300 $0.350 $0.400 $0.500 $0.360 $0.400
666 6178 REFL PAV MRK TY II (W) 8" (SLD) LF 400.000 $0.550 $0.750 $0.400 $0.750 $0.450 $0.550
666 6184 REFL PAV MRK TY II (W) (ARROW) EA 12.000 $80.000 $100.000 $95.000 $100.000 $80.590 $96.000
666 6192 REFL PAV MRK TY II (W) (WORD) EA 1.000 $90.000 $120.000 $131.000 $125.000 $110.940 $132.000
666 6208 REFL PAV MRK TY II (Y) 6" (BRK) LF 4,515.000 $0.300 $0.220 $0.400 $0.500 $0.360 $0.400
666 6210 REFL PAV MRK TY II (Y) 6" (SLD) LF 11,108.000 $0.300 $0.350 $0.400 $0.500 $0.360 $0.400
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 5,254.000 $0.750 $0.700 $0.800 $0.750 $0.730 $0.900
666 6318 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 4,515.000 $0.750 $0.700 $0.800 $0.750 $0.730 $0.900
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 11,108.000 $0.750 $1.180 $0.800 $1.250 $0.730 $0.900
666 6343 REF PROF PAV MRK TY I(W)6"(SLD)(100MIL) LF 10,508.000 $0.800 $1.700 $2.000 $1.750 $1.500 $1.800
672 6007 REFL PAV MRKR TY I-C EA 151.000 $6.000 $14.000 $10.000 $15.000 $8.130 $9.700
672 6009 REFL PAV MRKR TY II-A-A EA 344.000 $6.000 $11.500 $10.000 $15.000 $8.130 $9.700
3076 6003 D-GR HMA TY-B PG64-22 (EXEMPT) TON 2,613.000 $115.000 $120.000 $123.000 $115.000 $141.500 $127.000
3076 6072 D-GR HMA TY-D PG 76-22 (EXEMPT) TON 2,919.000 $135.000 $180.000 $185.000 $130.000 $152.500 $190.000
3079 6011 PFC-C PG76-22 SAC-A TON 2,389.000 $185.000 $220.000 $228.000 $165.000 $217.400 $185.000
3084 6001 BONDING COURSE GAL 2,169.000 $5.000 $4.500 $4.000 $6.000 $4.880 $5.000
3085 6001 UNDERSEAL COURSE GAL 6,404.000 $5.000 $4.500 $4.000 $6.000 $6.700 $5.000
5000 6001 GEOGRID REINFORCE EMBANKMENTS (TY A) SY 569.000 $5.000 $250.000 $97.000 $20.000 $23.800 $30.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 3.000 $10,000.000 $11,000.000 $30,000.000 $16,500.000 $9,742.500 $16,000.000
6185 6002 TMA (STATIONARY) DAY 300.000 $170.000 $180.000 $185.000 $250.000 $265.210 $600.000
6185 6003 TMA (MOBILE OPERATION) HR 160.000 $95.000 $48.000 $95.000 $85.000 $83.350 $110.000
7251 6001 SUBSURFACE UTIL LOCATE (OUTSIDE RDBED) EA 10.000 $1,500.000 $700.000 $2,000.000 $1,000.000 $1,500.000 $3,000.000
7251 6002 SUBSURFACE UTIL LOCATE (WITHIN RDBED) EA 10.000 $3,500.000 $4,000.000 $2,000.000 $1,000.000 $3,000.000 $5,300.000
Totals: $4,492,163.70 $5,205,668.65 $5,351,122.53 $5,950,741.10 $6,527,364.73 $7,885,639.00