TRAVIS VARIOUS (0914-04-377)

Items: 114

County: TRAVIS
Length: 0.0000 MILES
Highway: VARIOUS
District: AUSTIN
Control Number: 0914-04-377
DBE Goal: 0.0%
Project: C 914-4-377
Guaranty: $100,000.00
Time: 227 WORKING DAYS
Engineer's Estimate: $16,306,478.85
Date: 07/02/2026 1:00 PM CDT (16 days ago)
Contract Number: 7263202
Type: TRANSPORTATION NON-ROADWAY
Project ID: A00212065
Project Description: DUAL FEED POWER FOR DRAINAGE TUNNEL PUMP STATION
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
MATTHEW KELLY
KEVIN MACKAN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$16,306,478.85
$7,779,122.15
Over/Under Est: -52.29% -$8,527,356.70
Over/Under Est: -4.21% -$685,890.58
Amt Left: 100.8% $7,841,466.12
Over/Under Est: -2.55% -$415,444.21
Amt Left: 104.28% $8,111,912.49
Delta: -1.73% -$270,446.37
Over/Under Est: 19.96% $3,254,561.85
Amt Left: 151.46% $11,781,918.55
Delta: -23.09% -$3,670,006.06
Over/Under Est: 35.81% $5,839,879.71
Amt Left: 184.69% $14,367,236.41
Delta: -13.22% -$2,585,317.86
$23,827,063.28
Over/Under Est: 46.12% $7,520,584.43
Amt Left: 206.3% $16,047,941.13
Delta: -7.59% -$1,680,704.72

Bid Items & Bid Tabulations

114 Total 0 of 114
TRAVIS  |  VARIOUS  |  AUSTIN  |  0914-04-377  |  07/02/2026 1:00 PM CDT  |  $16,306,478.85  |  C 914-4-377  |  TRANSPORT NON-ROADWAY  |  227 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS ROAD LLC
E-Z BEL CONSTRUCTION, LLC
JAY-REESE CONTRACTORS, INC.
JOE BLAND CONSTRUCTION LLC
ZACHRY CONSTRUCTION CORPORATION
WEBBER, LLC
PREPARING ROW
STA 112.000 $6,550.000 $3,200.000 $5,500.000 $1,050.000 $2,750.000 $17,500.000 $35,533.830
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 17.000 $2,000.000 $2,300.000 $2,000.000 $1,015.000 $750.000 $2,763.050 $8,377.610
TREE PROTECTION (INSTALL)
LF 148.000 $80.000 $5.600 $5.000 $6.000 $5.000 $6.930 $55.000
TREE PROTECTION (REMOVE)
LF 148.000 $10.000 $1.700 $3.000 $2.000 $2.000 $2.190 $5.000
REMOV CONC (PAV)
SY 20.000 $40.000 $10.000 $1.000 $90.000 $50.000 $242.420 $95.300
REMOV CONC (MOWSTRIP)
LF 112.000 $20.000 $18.000 $1.000 $12.000 $45.000 $21.490 $117.480
REMOV CONC (MEDIANS)
SY 58.000 $30.000 $12.000 $1.000 $40.000 $45.000 $79.750 $97.890
REMOV CONC (DRIVEWAYS)
SY 65.000 $35.000 $53.000 $1.000 $45.000 $40.000 $76.990 $89.590
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 627.000 $55.000 $9.500 $1.000 $25.000 $35.000 $22.690 $68.110
REMOV CONC (CURB RAMP)
SY 21.000 $150.000 $35.000 $1.000 $45.000 $45.000 $118.760 $401.210
REMOV CONC (CURB OR CURB & GUTTER)
LF 311.000 $30.000 $11.000 $1.000 $30.000 $15.000 $22.170 $76.290
REMOV CONC (FOUNDATIONS)
SY 19.000 $42.000 $40.000 $1.000 $75.000 $85.000 $260.550 $395.710
REMOV CONC (MISC)
SY 13.000 $70.000 $23.000 $1.000 $45.000 $75.000 $197.580 $403.960
FURN & PLACE TOPSOIL (4")
SY 23,692.000 $1.800 $1.000 $6.000 $6.000 $3.000 $2.920 $20.960
BROADCAST SEED (PERM_URBAN_CLAY)
SY 23,692.000 $2.000 $0.250 $1.000 $0.250 $0.500 $0.290 $0.200
FERTILIZER
AC 4.880 $750.000 $1,100.000 $665.000 $1,250.000 $1,150.000 $1,394.280 $955.000
VEGETATIVE WATERING
TGL 399.000 $60.000 $30.000 $50.000 $60.000 $65.000 $73.000 $120.050
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 393.000 $135.000 $150.000 $270.000 $210.000 $120.000 $204.390 $224.150
D-GR HMA TY-C PG76-22 (EXEMPT)
TON 314.000 $125.000 $150.000 $290.000 $240.000 $350.000 $262.790 $264.590
D-GR HMA TY-D PG70-22 (EXEMPT)
TON 1,100.000 $110.000 $260.000 $208.000 $230.000 $360.000 $303.670 $214.240
TOM-C PG76-22 SAC-B
TON 1,130.000 $125.000 $240.000 $189.000 $210.000 $150.000 $280.310 $197.760
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 6,547.000 $30.000 $38.000 $35.000 $70.000 $60.000 $87.600 $86.670
PLANE & TEXT ASPH CONC PAV(2")
SY 20,000.000 $1.350 $1.250 $1.000 $1.250 $4.000 $1.460 $5.730
FULL - DEPTH REPAIR CRCP (10")
CY 6.000 $1,750.000 $3,200.000 $900.000 $1,525.000 $1,500.000 $1,532.980 $750.000
TRENCH EXCAVATION PROTECTION
LF 9,493.000 $12.500 $4.500 $0.010 $30.000 $15.000 $9.850 $48.470
RIPRAP (CONC)(4 IN)
CY 113.000 $675.000 $540.000 $780.000 $700.000 $775.000 $912.480 $958.460
RIPRAP (MOW STRIP)(4 IN)
CY 7.000 $730.000 $280.000 $700.000 $930.000 $725.000 $948.980 $1,445.010
MOBILIZATION
LS 1.000 $2,250,000.000 $700,000.000 $1,500,000.000 $1,400,000.000 $425,000.000 $2,000,000.000 $4,250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $45,000.000 $7,300.000 $6,000.000 $32,750.000 $4,500.000 $25,000.000 $250,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,500.000 $13,000.000 $22,800.000 $18,925.000 $20,000.000 $27,657.560 $20,000.000
TMA (STATIONARY)
DAY 90.000 $275.000 $280.000 $277.000 $350.000 $340.000 $276.660 $350.000
TMA (MOBILE OPERATION)
DAY 45.000 $350.000 $80.000 $750.000 $1,600.000 $340.000 $1,053.260 $600.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 30.000 $75.000 $45.000 $43.000 $230.000 $60.000 $62.050 $50.000
ROCK FILTER DAMS (REMOVE)
LF 30.000 $20.000 $35.000 $38.000 $40.000 $35.000 $54.750 $29.750
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 333.000 $35.000 $42.000 $22.000 $45.000 $50.000 $31.390 $35.750
CONSTRUCTION EXITS (REMOVE)
SY 333.000 $14.000 $11.000 $16.000 $10.000 $10.000 $22.990 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,623.000 $5.500 $3.000 $4.000 $3.000 $5.000 $5.470 $7.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,623.000 $2.000 $1.000 $0.500 $1.000 $2.000 $0.730 $0.950
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 564.000 $8.000 $4.500 $8.000 $5.000 $8.000 $10.950 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 564.000 $2.000 $1.500 $1.000 $1.500 $2.000 $1.460 $1.250
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,740.000 $60.000 $17.000 $105.000 $100.000 $115.000 $57.360 $86.910
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 140.000 $75.000 $13.000 $35.000 $100.000 $110.000 $136.850 $81.340
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 2,060.000 $12.000 $10.000 $19.000 $25.000 $25.000 $24.220 $34.380
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 260.000 $20.000 $18.000 $19.000 $25.000 $25.000 $42.090 $35.810
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,740.000 $20.000 $6.500 $24.000 $20.000 $15.000 $28.970 $42.450
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 140.000 $22.000 $5.500 $15.000 $20.000 $15.000 $49.300 $29.690
COLORED TEXTURED CONC (4")
SY 73.000 $165.000 $120.000 $125.000 $235.000 $140.000 $20.000 $642.730
COLORED TEXTURED CONC (6")
SY 280.000 $145.000 $95.000 $127.000 $245.000 $155.000 $33.790 $647.870
CONC CURB & GUTTER (TY II)
LF 263.000 $46.000 $31.000 $32.000 $80.000 $35.000 $43.800 $221.170
DRIVEWAYS (CONC) (HES)
SY 63.000 $300.000 $32.000 $180.000 $225.000 $245.000 $29.310 $237.020
CONC SIDEWALKS (5")
SY 274.000 $102.000 $68.000 $110.000 $210.000 $95.000 $19.240 $234.520
CURB RAMPS (TY 1)
EA 2.000 $3,000.000 $3,400.000 $3,000.000 $3,700.000 $1,750.000 $4,306.940 $4,050.830
CURB RAMPS (TY 7)
EA 3.000 $3,000.000 $3,700.000 $3,200.000 $4,700.000 $1,750.000 $5,328.930 $4,146.440
CONC MEDIAN
SY 56.000 $112.000 $100.000 $120.000 $225.000 $115.000 $200.740 $630.650
CONCRETE MEDIAN (NOSE)
SY 11.000 $850.000 $260.000 $850.000 $250.000 $250.000 $138.700 $461.880
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $33.000 $27.000 $35.000 $34.000 $25.000 $51.100 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $3,000.000 $2,000.000 $4,500.000 $2,600.000 $2,000.000 $4,744.950 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 77.000 $5.000 $1.500 $15.000 $2.000 $2.000 $7.300 $5.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 3.000 $310.000 $175.000 $1,500.000 $220.000 $150.000 $364.990 $150.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 3.000 $5,000.000 $1,300.000 $4,500.000 $1,600.000 $1,250.000 $1,094.980 $1,100.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 4.000 $850.000 $1,250.000 $650.000 $700.000 $750.000 $1,569.480 $1,075.000
REMOVE SM RD SN SUP&AM
EA 5.000 $250.000 $84.000 $100.000 $160.000 $115.000 $105.120 $125.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 2,090.000 $1.000 $0.300 $2.000 $2.000 $2.500 $0.480 $0.330
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,834.000 $1.000 $0.250 $2.000 $2.000 $2.500 $0.320 $0.220
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 4,550.000 $1.000 $0.250 $2.000 $2.000 $2.500 $0.320 $0.220
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 1,715.000 $1.000 $0.300 $3.000 $3.000 $3.500 $0.420 $0.290
WK ZN PAV MRK REMOV (W)(ARROW)
EA 1.000 $500.000 $91.000 $200.000 $200.000 $240.000 $116.800 $380.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 1.000 $500.000 $105.000 $200.000 $200.000 $240.000 $138.700 $495.000
REFL PAV MRK TY I (W)4"(LNDP)(100MIL)
LF 10.000 $2.500 $1.500 $1.000 $1.000 $1.200 $2.120 $2.450
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 95.000 $3.750 $5.000 $3.500 $3.500 $4.000 $6.500 $6.450
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 940.000 $8.500 $8.000 $7.000 $7.000 $8.000 $10.950 $10.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 7.000 $250.000 $5.000 $200.000 $200.000 $220.000 $211.690 $445.000
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
EA 2.000 $200.000 $165.000 $150.000 $150.000 $175.000 $211.690 $645.000
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 2.000 $300.000 $245.000 $200.000 $200.000 $220.000 $313.890 $600.000
REFL PAV MRK TY I (Y)4"(DOT)(100MIL)
LF 8.000 $6.250 $1.800 $1.000 $1.000 $1.500 $2.340 $3.600
RE PM TY II (W) 4" (LNDP)
LF 10.000 $1.500 $1.000 $2.000 $2.000 $2.000 $1.460 $2.000
RE PM TY II (W) 6" (BRK)
LF 1,460.000 $0.350 $0.300 $0.650 $0.650 $1.000 $0.390 $0.270
RE PM TY II (W) 6" (SLD)
LF 6,703.000 $0.350 $0.300 $0.650 $0.650 $1.000 $0.390 $0.270
RE PM TY II (W) 8" (SLD)
LF 136.000 $1.500 $0.400 $0.650 $0.650 $1.000 $0.530 $0.860
RE PM TY II (W) 12" (SLD)
LF 95.000 $2.750 $1.400 $2.500 $2.500 $3.000 $1.900 $1.300
RE PM TY II (W) 24" (SLD)
LF 940.000 $4.750 $5.400 $5.000 $5.000 $6.000 $6.930 $4.750
RE PM TY II (W) (ARROW)
EA 7.000 $125.000 $9.000 $100.000 $100.000 $115.000 $124.100 $85.000
RE PM TY II (W) (BIKE ARROW)
EA 2.000 $125.000 $40.000 $100.000 $100.000 $115.000 $51.100 $35.000
RE PM TY II (W) (BIKE SYMBOL)
EA 2.000 $175.000 $45.000 $100.000 $100.000 $115.000 $58.400 $40.000
RE PM TY II (Y) 4" (DOT)
LF 8.000 $10.000 $1.300 $0.650 $0.650 $1.000 $1.750 $1.200
RE PM TY II (Y) 4" (SLD)
LF 1,648.000 $0.300 $0.300 $0.650 $0.650 $1.000 $0.360 $0.250
RE PM TY II (Y) 6" (SLD)
LF 5,820.000 $0.350 $0.350 $0.650 $0.650 $1.000 $0.440 $0.300
PAVEMENT SLER 4"
LF 1,666.000 $0.650 $0.300 $0.300 $0.300 $1.000 $0.360 $0.250
PAVEMENT SLER 6"
LF 13,983.000 $0.300 $0.350 $0.400 $0.400 $1.000 $0.440 $0.300
PAVEMENT SLER 12"
LF 95.000 $1.500 $1.400 $1.500 $1.500 $2.000 $1.900 $1.300
PAVEMENT SLER 24"
LF 940.000 $3.000 $5.000 $3.000 $3.000 $4.000 $6.930 $4.750
PAVEMENT SLER (ARROW)
EA 7.000 $50.000 $97.000 $50.000 $50.000 $60.000 $124.100 $85.000
PAVEMENT SLER (BIKE ARROW)
EA 2.000 $72.500 $40.000 $25.000 $25.000 $30.000 $51.100 $35.000
PAVEMENT SLER (BIKE SYMBOL)
EA 2.000 $100.000 $45.000 $25.000 $25.000 $30.000 $58.400 $40.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 1,460.000 $0.750 $0.800 $1.000 $1.000 $1.200 $1.090 $0.750
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 6,703.000 $0.500 $0.800 $1.000 $1.000 $1.200 $0.990 $0.680
REFL PAV MRK TY I (Y)4"(SLD)(100MIL)
LF 1,648.000 $0.450 $0.500 $1.000 $1.000 $1.200 $0.730 $0.500
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 5,820.000 $0.800 $0.700 $1.000 $1.000 $1.200 $0.990 $0.680
ELIM EXT PM & MRKS (4")
LF 7,875.000 $1.000 $0.500 $1.500 $1.500 $2.000 $0.730 $0.500
ELIM EXT PM & MRKS (8")
LF 173.000 $1.000 $1.100 $1.500 $1.500 $2.000 $1.460 $1.000
ELIM EXT PM & MRKS (ARROW)
EA 3.000 $200.000 $51.000 $200.000 $200.000 $220.000 $65.700 $255.000
ELIM EXT PM & MRKS (WORD)
EA 1.000 $500.000 $62.000 $200.000 $200.000 $220.000 $80.300 $255.000
PAV SURF PREP FOR MRK (4")
LF 1,666.000 $0.300 $0.400 $0.020 $0.020 $0.500 $0.510 $0.350
PAV SURF PREP FOR MRK (6")
LF 13,983.000 $0.200 $0.600 $0.040 $0.040 $0.500 $0.770 $0.530
PAV SURF PREP FOR MRK (12")
LF 95.000 $0.500 $0.800 $0.250 $0.250 $0.500 $1.020 $0.700
PAV SURF PREP FOR MRK (24")
LF 940.000 $2.000 $0.900 $0.500 $0.500 $0.500 $1.170 $0.800
PAV SURF PREP FOR MRK (ARROW)
EA 7.000 $28.000 $45.000 $25.000 $25.000 $30.000 $58.400 $40.000
PAV SURF PREP FOR MRK (BIKE ARROW)
EA 2.000 $85.000 $51.000 $25.000 $25.000 $30.000 $65.700 $45.000
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 2.000 $85.000 $51.000 $25.000 $25.000 $30.000 $65.700 $45.000
BONDING COURSE
GAL 3,600.000 $3.700 $4.000 $3.250 $3.250 $5.000 $4.740 $3.350
LED ROADSIDE SIGN
EA 1.000 $5,000.000 $2,600.000 $2,100.000 $2,800.000 $3,500.000 $14,599.830 $3,500.000
DUCT BANK (CONC ENCASE) (TRENCH)
LF 9,485.000 $500.000 $248.000 $678.000 $750.000 $1,270.000 $955.380 $542.490
DUCT BANK (STL ENCASE) (BORE)
LF 1,413.000 $2,200.000 $1,200.000 $2,350.000 $2,150.000 $1,950.000 $2,962.320 $1,735.490
MANHOLE (6’X12’) (ALL DEPTHS)
EA 35.000 $95,500.000 $30,000.000 $50,000.000 $35,600.000 $45,750.000 $60,870.060 $35,787.630
Totals: $16,306,478.850 $7,779,122.150 $15,620,588.270 $15,891,034.640 $19,561,040.700 $22,146,358.556 $23,827,063.280
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (NON-PART) $20,000.00
PUBLIC UTILITY FORCE ACCT WORK (NON- PART) $7,500,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $7,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $163,064.79
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $35,000.00
Total: $7,725,064.79