Job Info for 0914-04-271

County: TRAVIS Highway: CR Date: 05/08/2019 (5 years ago) Engineer's Estimate: $935,814 Control Number: 0914-04-271
Project: BR 1502(647) District: AUSTIN Time: 141 WORKING DAYS Type: REPLACE BRIDGE & APPROACHES

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $935,814.35
SB CONTRACTORS LLC   $1,078,645.16 1
15.26% | $142,830.81
CHASCO CONSTRUCTORS   $1,084,884.75 2
15.93% | $149,070.40
0.58% | $6,239.59
DAN WILLIAMS COMPANY   $1,133,450.25 3
21.12% | $197,635.90
5.08% | $54,805.09
4.48% | $48,565.50
CAPITAL EXCAVATION COMPANY   $1,243,247.62 4
32.85% | $307,433.27
15.26% | $164,602.46
9.69% | $109,797.37
PROJECT ALLIED RESOURCES, LLC   $1,265,975.30 5
35.28% | $330,160.95
17.37% | $187,330.14
1.83% | $22,727.68
ANGEL BROTHERS HOLDINGS CORP.   $1,418,967.60 6
51.63% | $483,153.25
31.55% | $340,322.44
12.08% | $152,992.30

Bid Items

Items: 75, 0 filtered
TRAVIS CR  |  AUSTIN  |  0914-04-271  |  05/08/2019  |  $935,814  |  BR 1502(647)  |  REPLACE BRIDGE & APPROACHES  |  141 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate SB CONTRACTORS LLC CHASCO CONSTRUCTORS DAN WILLIAMS COMPANY CAPITAL EXCAVATION COMPANY PROJECT ALLIED RESOURCES, LLC ANGEL BROTHERS HOLDINGS CORP.
100 6001 PREPARING ROW AC 0.240 $6,400.000 $15,000.000 $30,000.000 $50,000.000 $20,000.000 $15,900.000 $50,000.000
100 6002 PREPARING ROW STA 4.000 $3,100.000 $3,000.000 $6,000.000 $15,000.000 $20,000.000 $23,900.000 $25,500.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 80.000 $13.460 $15.000 $25.000 $15.000 $34.800 $23.100 $30.000
104 6028 REMOVING CONC (MISC) SY 12.000 $20.000 $20.000 $200.000 $35.000 $143.780 $54.000 $30.000
105 6011 REMOVING STAB BASE AND ASPH PAV (2"-6") SY 513.000 $3.750 $4.000 $15.000 $5.000 $5.390 $4.100 $15.000
110 6001 EXCAVATION (ROADWAY) CY 300.000 $6.690 $10.000 $40.000 $25.000 $35.840 $19.600 $12.000
110 6002 EXCAVATION (CHANNEL) CY 2,381.000 $10.660 $12.000 $25.000 $15.000 $22.650 $15.600 $35.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 200.000 $6.750 $10.000 $40.000 $25.000 $38.620 $19.800 $23.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 268.000 $0.730 $6.000 $6.000 $2.500 $19.560 $11.200 $12.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 268.000 $0.100 $1.870 $2.000 $1.700 $1.680 $1.420 $2.000
164 6027 CELL FBR MLCH SEED(PERM)(URBAN)(CLAY) SY 1,454.000 $0.320 $0.350 $1.000 $0.600 $0.550 $0.980 $0.600
168 6001 VEGETATIVE WATERING MG 8.000 $14.930 $55.000 $500.000 $15.000 $81.440 $252.000 $45.000
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 268.000 $0.900 $1.500 $2.000 $1.500 $1.500 $1.320 $1.600
169 6006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY 1,186.000 $3.600 $6.000 $2.000 $1.500 $1.350 $2.160 $1.400
340 6011 D-GR HMA(SQ) TY-B PG64-22 TON 422.000 $80.000 $125.000 $100.000 $110.000 $105.000 $114.000 $113.000
340 6120 D-GR HMA(SQ) TY-D SAC-B PG70-22 TON 53.000 $109.720 $235.000 $190.000 $420.000 $190.000 $157.000 $200.000
400 6005 CEM STABIL BKFL CY 100.000 $116.350 $135.000 $160.000 $150.000 $160.000 $247.000 $200.000
402 6001 TRENCH EXCAVATION PROTECTION LF 360.000 $3.500 $5.000 $5.000 $1.000 $5.000 $4.850 $40.000
416 6004 DRILL SHAFT (36 IN) LF 241.000 $152.150 $210.000 $250.000 $225.000 $220.000 $251.000 $300.000
420 6013 CL C CONC (ABUT) CY 43.600 $848.950 $800.000 $850.000 $900.000 $900.000 $1,230.000 $1,000.000
420 6025 CL C CONC (BENT) CY 30.800 $850.000 $900.000 $1,100.000 $1,150.000 $1,700.000 $1,380.000 $1,000.000
420 6037 CL C CONC (COLUMN) CY 10.210 $858.300 $1,100.000 $1,600.000 $1,150.000 $1,000.000 $1,220.000 $1,400.000
422 6001 REINF CONC SLAB SF 6,120.000 $18.000 $19.000 $20.000 $20.000 $18.000 $19.300 $25.000
422 6015 APPROACH SLAB CY 67.000 $450.000 $400.000 $430.000 $500.000 $550.000 $674.000 $650.000
425 6035 PRESTR CONC GIRDER (TX28) LF 720.000 $129.000 $175.000 $156.000 $165.000 $140.000 $153.000 $182.000
432 6001 RIPRAP (CONC)(4 IN) CY 1.650 $414.860 $1,200.000 $1,750.000 $1,200.000 $850.000 $743.000 $750.000
432 6034 RIPRAP (STONE PROTECTION)(21 IN) CY 281.000 $120.000 $135.000 $125.000 $130.000 $160.000 $163.000 $165.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 14.050 $440.490 $400.000 $475.000 $450.000 $700.000 $640.000 $530.000
450 6006 RAIL (TY T223) LF 404.000 $95.500 $110.000 $115.000 $110.000 $90.000 $142.000 $118.000
454 6004 ARMOR JOINT (SEALED) LF 70.000 $85.000 $80.000 $95.000 $95.000 $100.000 $138.000 $125.000
460 6003 CMP (GAL STL 24 IN) LF 83.000 $85.240 $65.000 $75.000 $55.000 $70.000 $109.000 $100.000
467 6378 SET (TY II) (24 IN) (CMP) (4: 1) (P) EA 2.000 $1,125.000 $1,800.000 $1,800.000 $800.000 $1,300.000 $1,690.000 $2,700.000
496 6007 REMOV STR (PIPE) LF 53.000 $21.950 $21.000 $50.000 $16.000 $30.000 $22.200 $35.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 1.000 $25,000.000 $15,000.000 $29,323.000 $15,000.000 $34,000.000 $27,200.000 $30,000.000
500 6001 MOBILIZATION LS 1.000 $68,520.090 $100,000.000 $90,000.000 $100,000.000 $120,000.000 $140,000.000 $120,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $1,000.000 $4,000.000 $1,500.000 $6,500.000 $1,000.000 $1,350.000 $600.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 80.000 $27.780 $25.000 $25.000 $28.000 $27.500 $56.000 $29.000
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 155.000 $45.000 $45.000 $45.000 $55.000 $55.000 $63.000 $55.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 235.000 $9.640 $13.000 $5.000 $15.000 $15.000 $16.100 $15.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 1,055.000 $17.850 $15.000 $20.000 $12.000 $12.000 $10.000 $12.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 1,055.000 $7.870 $10.000 $5.000 $10.000 $10.000 $3.640 $10.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 805.000 $2.400 $4.000 $4.000 $2.150 $2.150 $4.480 $2.200
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 805.000 $0.630 $0.750 $0.500 $0.500 $0.150 $1.070 $0.200
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 176.000 $16.800 $5.000 $5.000 $4.500 $4.500 $5.900 $4.500
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 176.000 $1.350 $1.000 $0.500 $0.500 $0.500 $1.260 $0.500
530 6004 DRIVEWAYS (CONC) SY 56.000 $70.000 $60.000 $96.000 $95.000 $150.000 $110.000 $130.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 250.000 $20.630 $20.000 $21.000 $18.500 $18.000 $21.600 $22.000
540 6007 MTL BEAM GD FEN TRANS (TL2) EA 4.000 $1,320.740 $900.000 $950.000 $875.000 $850.000 $1,020.000 $1,000.000
540 6014 SHORT RADIUS LF 70.000 $36.550 $25.000 $25.000 $26.500 $26.000 $31.200 $28.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 1.000 $1,146.110 $925.000 $975.000 $1,000.000 $950.000 $1,140.000 $1,000.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 3.000 $2,667.300 $2,630.000 $2,775.000 $2,500.000 $2,390.000 $2,870.000 $2,800.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 3.000 $539.020 $555.000 $580.000 $600.000 $450.000 $509.000 $600.000
644 6076 REMOVE SM RD SN SUP&AM EA 6.000 $81.700 $125.000 $130.000 $125.000 $50.000 $78.000 $100.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 8.000 $21.960 $13.000 $15.000 $20.000 $10.000 $24.000 $14.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 3.000 $15.000 $16.250 $17.000 $22.000 $10.000 $26.400 $17.000
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 918.000 $0.330 $1.500 $3.000 $1.750 $3.000 $3.600 $3.000
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 1,000.000 $0.340 $1.500 $3.000 $1.750 $3.000 $3.600 $3.000
666 6323 RE PM W/RET REQ TY II (W) 4" (SLD) LF 918.000 $0.110 $1.200 $1.000 $1.250 $0.500 $2.580 $0.500
666 6327 RE PM W/RET REQ TY II (Y) 4" (SLD) LF 1,000.000 $0.120 $1.200 $1.000 $1.250 $0.500 $2.580 $0.500
672 6009 REFL PAV MRKR TY II-A-A EA 26.000 $2.880 $50.000 $10.000 $55.000 $10.000 $24.000 $10.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 22.000 $0.440 $50.000 $10.000 $55.000 $10.000 $18.000 $10.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $10,000.000 $17,000.000 $2,800.000 $7,000.000 $8,724.450 $20,400.000 $8,500.000
6185 6001 TMA (STATIONARY) EA 2.000 $5,000.000 $5,000.000 $750.000 $1.000 $30,000.000 $706.000 $3,000.000
6185 6005 TMA (MOBILE OPERATION) DAY 164.000 $150.000 $150.000 $1.000 $1.000 $100.000 $1.000 $75.000
7207 6016 JACK BORE ASTM A134 STEEL MIN THICK 3/8 LF 110.000 $600.000 $525.000 $600.000 $750.000 $600.000 $312.000 $720.000
7207 6017 PIPE, 2" DIA. HDPE (ALL DEPTHS) LF 6.000 $40.000 $50.000 $65.000 $150.000 $200.000 $181.000 $390.000
7207 6018 PIPE, 6" DIA. DI CLASS 350 (ALL DEPTHS) LF 14.000 $85.000 $70.000 $100.000 $250.000 $150.000 $202.000 $200.000
7207 6019 FCT RESTR JT PIPE,12"DIA. CL 350 DI LF 360.000 $165.000 $155.000 $150.000 $125.000 $150.000 $149.000 $280.000
7207 6020 WET CONNECTIONS, 12" DIA. X 12" DIA. EA 2.000 $5,000.000 $8,500.000 $2,500.000 $3,500.000 $6,300.000 $8,060.000 $3,000.000
7207 6021 DUCTILE IRON FITTINGS 4" THROUGH 12" TON 0.350 $7,450.000 $9,000.000 $20,000.000 $10,000.000 $7,000.000 $18,100.000 $32,000.000
7207 6022 VALVES, GATE VALVE TYPE, 6" DIA. EA 1.000 $1,650.000 $2,500.000 $1,150.000 $1,200.000 $2,500.000 $1,400.000 $1,500.000
7207 6023 VALVES, GATE VALVE TYPE, 12" DIA. EA 1.000 $2,700.000 $3,500.000 $2,500.000 $3,500.000 $3,500.000 $15,100.000 $4,300.000
7207 6024 FIRE HYDRANTS EA 1.000 $4,800.000 $6,500.000 $3,500.000 $5,500.000 $5,000.000 $8,900.000 $5,200.000
7207 6025 AUTO COMBO AIR AND VAC RELEASE VALVE 2" EA 1.000 $4,000.000 $2,500.000 $3,500.000 $3,500.000 $4,500.000 $1,260.000 $3,300.000
7207 6026 ADDITIONAL BURY DEPTH(2" ARV AND 6" FH) LF 18.000 $800.000 $120.000 $150.000 $150.000 $120.000 $204.000 $210.000
Totals: $935,814.35 $1,078,645.16 $1,084,884.75 $1,133,450.25 $1,243,247.62 $1,265,975.30 $1,418,967.60