|
|
REMOV CONC (MEDIANS)
|
SY
|
97.000
|
$16.000
|
$5.000
|
$29.000
|
$101.000
|
$250.000
|
$50.000
|
|
|
REMOV CONC (CURB OR CURB & GUTTER)
|
LF
|
31.000
|
$15.000
|
$5.000
|
$4.000
|
$110.000
|
$220.000
|
$30.000
|
|
|
RMV (12"-16") TRT/UNTRT BASE & ASPH PAV
|
SY
|
120.000
|
$15.000
|
$25.000
|
$83.000
|
$56.000
|
$265.000
|
$30.000
|
|
|
RMV (19") TRT/UNTRT BASE & ASPH PAV
|
SY
|
470.000
|
$10.000
|
$30.000
|
$101.000
|
$43.000
|
$255.000
|
$30.000
|
|
|
EMBANK (FNL)(OC)(TY B)
|
CY
|
27.000
|
$10.000
|
$250.000
|
$88.000
|
$145.000
|
$900.000
|
$60.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
95.000
|
$2.000
|
$20.000
|
$13.000
|
$34.000
|
$34.000
|
$30.000
|
|
|
BLOCK SODDING
|
SY
|
381.000
|
$10.000
|
$15.000
|
$8.300
|
$15.000
|
$15.000
|
$10.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(19")
|
SY
|
31.000
|
$130.000
|
$300.000
|
$621.000
|
$379.000
|
$500.000
|
$2,500.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
10.000
|
$300.000
|
$250.000
|
$385.000
|
$351.220
|
$185.000
|
$350.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
55.000
|
$300.000
|
$350.000
|
$390.000
|
$305.230
|
$185.000
|
$350.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
208.000
|
$375.000
|
$375.000
|
$414.000
|
$351.740
|
$350.000
|
$430.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (42 IN)
|
LF
|
16.000
|
$500.000
|
$525.000
|
$455.000
|
$545.520
|
$583.000
|
$450.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
130.000
|
$550.000
|
$525.000
|
$479.000
|
$576.150
|
$650.000
|
$650.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$176,000.000
|
$99,600.000
|
$127,300.000
|
$241,822.860
|
$136,000.000
|
$100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$5,000.000
|
$2,500.000
|
$4,568.000
|
$5,406.520
|
$2,500.000
|
$2,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
336.000
|
$125.000
|
$50.000
|
$94.000
|
$57.770
|
$75.000
|
$135.000
|
|
|
TMA (STATIONARY)
|
DAY
|
25.000
|
$275.000
|
$600.000
|
$84.000
|
$59.100
|
$300.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
64.000
|
$250.000
|
$0.010
|
$3.500
|
$7.390
|
$68.000
|
$85.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
700.000
|
$10.000
|
$2.000
|
$5.300
|
$5.960
|
$8.000
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
700.000
|
$2.000
|
$1.000
|
$1.100
|
$2.200
|
$1.000
|
$2.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
171.000
|
$30.000
|
$50.000
|
$29.000
|
$52.000
|
$72.000
|
$45.000
|
|
|
CONC CURB (RIBBON)
|
LF
|
654.000
|
$35.000
|
$50.000
|
$29.000
|
$33.000
|
$46.000
|
$10.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
875.000
|
$80.000
|
$75.000
|
$74.000
|
$102.000
|
$125.000
|
$135.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$2,100.000
|
$3,000.000
|
$2,364.000
|
$2,463.000
|
$3,000.000
|
$2,765.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
1.000
|
$3,800.000
|
$4,000.000
|
$3,310.000
|
$3,917.000
|
$4,500.000
|
$4,444.000
|
|
|
CURB RAMPS (TY 5)
|
SY
|
22.000
|
$250.000
|
$400.000
|
$213.000
|
$336.000
|
$400.000
|
$550.000
|
|
|
CURB RAMPS (TY 7) (SUP)
|
EA
|
12.000
|
$3,500.000
|
$4,000.000
|
$2,364.000
|
$2,501.000
|
$3,000.000
|
$2,500.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$3,300.000
|
$2,500.000
|
$2,548.000
|
$2,507.940
|
$2,300.000
|
$3,100.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,955.000
|
$11.000
|
$15.000
|
$18.000
|
$9.680
|
$10.000
|
$17.500
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
40.000
|
$30.000
|
$30.000
|
$23.000
|
$42.750
|
$40.000
|
$26.750
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
5,355.000
|
$15.500
|
$17.000
|
$21.000
|
$14.000
|
$15.000
|
$21.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
1,365.000
|
$33.000
|
$30.000
|
$25.000
|
$24.950
|
$43.000
|
$29.600
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
270.000
|
$25.000
|
$20.000
|
$28.000
|
$30.460
|
$35.000
|
$26.750
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
5,145.000
|
$30.000
|
$30.000
|
$27.000
|
$24.510
|
$45.000
|
$29.600
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
9,075.000
|
$2.100
|
$1.250
|
$1.800
|
$1.920
|
$1.300
|
$1.750
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
14,370.000
|
$2.050
|
$1.500
|
$1.800
|
$2.030
|
$1.600
|
$2.450
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
5,025.000
|
$3.050
|
$1.500
|
$2.200
|
$2.240
|
$1.800
|
$2.450
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
2,250.000
|
$3.600
|
$1.750
|
$2.200
|
$2.510
|
$2.000
|
$2.450
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
610.000
|
$3.500
|
$3.000
|
$3.000
|
$3.500
|
$5.000
|
$3.200
|
|
|
ITS GND BOX TY 2 (243636)W/APRON
|
EA
|
2.000
|
$5,000.000
|
$3,500.000
|
$5,893.000
|
$6,650.350
|
$5,500.000
|
$4,200.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
47.000
|
$1,300.000
|
$1,500.000
|
$1,655.000
|
$1,659.440
|
$1,800.000
|
$1,775.000
|
|
|
ELC SRV TY D 120/240 070(NS)AL(E)SP(O)
|
EA
|
5.000
|
$7,000.000
|
$8,000.000
|
$7,574.000
|
$7,746.080
|
$6,000.000
|
$5,500.000
|
|
|
ELC SRV TY D 120/240 070(NS)AL(E)SP(U)
|
EA
|
1.000
|
$5,000.000
|
$7,500.000
|
$6,532.000
|
$10,639.310
|
$5,800.000
|
$5,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
625.000
|
$50.000
|
$35.000
|
$30.000
|
$36.180
|
$40.000
|
$45.300
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$800.000
|
$850.000
|
$1,004.000
|
$1,011.140
|
$1,000.000
|
$775.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$800.000
|
$950.000
|
$1,123.000
|
$1,130.100
|
$1,100.000
|
$875.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
4.000
|
$650.000
|
$450.000
|
$532.000
|
$535.310
|
$600.000
|
$660.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
23.000
|
$110.000
|
$75.000
|
$89.000
|
$89.220
|
$125.000
|
$125.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
24.000
|
$1.000
|
$1.000
|
$5.000
|
$1.000
|
$2.000
|
$1.750
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
34.000
|
$1.100
|
$1.000
|
$3.500
|
$1.000
|
$2.100
|
$1.550
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
94.000
|
$1.300
|
$2.000
|
$2.400
|
$2.000
|
$2.600
|
$2.150
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,003.000
|
$1.000
|
$1.000
|
$1.200
|
$1.000
|
$2.000
|
$1.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,861.000
|
$8.750
|
$6.750
|
$8.000
|
$6.750
|
$10.000
|
$9.250
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
29.000
|
$170.000
|
$150.000
|
$178.000
|
$150.000
|
$95.000
|
$191.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
15.000
|
$270.000
|
$250.000
|
$296.000
|
$250.000
|
$110.000
|
$2.750
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
4.000
|
$300.000
|
$300.000
|
$355.000
|
$300.000
|
$150.000
|
$2.750
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
35.000
|
$210.000
|
$175.000
|
$207.000
|
$175.000
|
$110.000
|
$221.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
14.000
|
$20.000
|
$35.000
|
$42.000
|
$35.000
|
$30.000
|
$45.000
|
|
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
|
EA
|
3.000
|
$150.000
|
$100.000
|
$119.000
|
$100.000
|
$75.000
|
$180.000
|
|
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
|
EA
|
3.000
|
$300.000
|
$150.000
|
$178.000
|
$150.000
|
$95.000
|
$205.000
|
|
REFL PAV MRK TY I (W)(BIKE DOT)(100MIL)
|
EA
|
49.000
|
$25.000
|
$1.000
|
$1.200
|
$1.000
|
$10.000
|
$6.500
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
417.000
|
$2.500
|
$3.500
|
$4.200
|
$3.500
|
$5.000
|
$4.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
916.000
|
$9.000
|
$6.750
|
$8.000
|
$6.750
|
$10.000
|
$1.250
|
|
|
PAVEMENT SLER 4"
|
LF
|
362.000
|
$1.200
|
$0.300
|
$0.350
|
$0.300
|
$0.400
|
$1.250
|
|
|
PAVEMENT SLER 6"
|
LF
|
17,664.000
|
$0.500
|
$0.400
|
$0.480
|
$0.400
|
$0.500
|
$0.750
|
|
|
PAVEMENT SLER 8"
|
LF
|
3,097.000
|
$1.500
|
$0.500
|
$0.600
|
$0.500
|
$0.550
|
$0.750
|
|
|
PAVEMENT SLER 12"
|
LF
|
417.000
|
$2.000
|
$1.000
|
$1.190
|
$1.000
|
$1.000
|
$4.000
|
|
|
PAVEMENT SLER 24"
|
LF
|
2,777.000
|
$3.700
|
$2.000
|
$2.400
|
$2.000
|
$1.500
|
$2.250
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
29.000
|
$90.000
|
$50.000
|
$59.000
|
$50.000
|
$40.000
|
$45.500
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
35.000
|
$100.000
|
$50.000
|
$59.000
|
$50.000
|
$45.000
|
$45.500
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
15.000
|
$90.000
|
$75.000
|
$89.000
|
$75.000
|
$45.000
|
$45.500
|
|
|
PAVEMENT SLER (UTURN ARROW)
|
EA
|
4.000
|
$50.000
|
$75.000
|
$89.000
|
$75.000
|
$60.000
|
$60.000
|
|
|
PAVEMENT SLER (YLD TRI)
|
EA
|
14.000
|
$50.000
|
$10.000
|
$12.000
|
$10.000
|
$15.000
|
$20.000
|
|
|
PAVEMENT SLER (BIKE ARROW)
|
EA
|
3.000
|
$55.000
|
$25.000
|
$30.000
|
$25.000
|
$15.000
|
$40.000
|
|
|
PAVEMENT SLER (BIKE SYMBOL)
|
EA
|
3.000
|
$80.000
|
$25.000
|
$30.000
|
$25.000
|
$15.000
|
$40.000
|
|
|
PAVENENT SLER (BIKE DOT)
|
LF
|
49.000
|
$2.000
|
$0.100
|
$3.000
|
$0.100
|
$5.000
|
$10.000
|
|
REFL PAV MRK TY I (W)4"(SLD)(100MIL)
|
LF
|
338.000
|
$0.500
|
$0.680
|
$0.800
|
$0.680
|
$1.000
|
$1.250
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
440.000
|
$0.700
|
$0.680
|
$0.850
|
$0.680
|
$1.000
|
$1.250
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
5,568.000
|
$0.700
|
$0.680
|
$0.800
|
$0.680
|
$1.000
|
$1.250
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
11,622.000
|
$0.700
|
$0.680
|
$0.800
|
$0.680
|
$1.000
|
$1.250
|
|
REFL PAV MRKR TY I-C
|
EA
|
171.000
|
$4.500
|
$3.500
|
$4.150
|
$3.500
|
$7.000
|
$6.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
517.000
|
$4.500
|
$3.500
|
$4.150
|
$3.500
|
$6.000
|
$8.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
130.000
|
$5.000
|
$3.500
|
$4.120
|
$3.500
|
$7.000
|
$8.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
2,737.000
|
$0.400
|
$1.000
|
$1.200
|
$1.000
|
$1.000
|
$1.500
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
3,636.000
|
$0.500
|
$1.000
|
$1.200
|
$1.000
|
$1.000
|
$1.500
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
1,004.000
|
$0.800
|
$1.000
|
$1.200
|
$1.000
|
$2.000
|
$2.250
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
205.000
|
$3.000
|
$3.000
|
$3.600
|
$3.000
|
$3.000
|
$2.500
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
1,208.000
|
$5.000
|
$6.000
|
$7.100
|
$6.000
|
$4.000
|
$5.000
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
11.000
|
$70.000
|
$100.000
|
$119.000
|
$100.000
|
$60.000
|
$5.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
9.000
|
$70.000
|
$100.000
|
$119.000
|
$100.000
|
$50.000
|
$85.000
|
|
|
ELIM EXT PM & MRKS (18")(YLD TRI)
|
EA
|
58.000
|
$25.000
|
$25.000
|
$30.000
|
$25.000
|
$25.000
|
$26.000
|
|
|
ELIM EXT PM & MARKS (BIKE ARROW)
|
EA
|
1.000
|
$50.000
|
$75.000
|
$89.000
|
$75.000
|
$30.000
|
$65.000
|
|
|
ELIM EXT PM & MARKS (BIKE SYMBOL)
|
EA
|
1.000
|
$70.000
|
$75.000
|
$89.000
|
$75.000
|
$30.000
|
$65.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
362.000
|
$0.250
|
$0.020
|
$0.400
|
$0.020
|
$0.200
|
$0.550
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
17,664.000
|
$0.400
|
$0.040
|
$0.100
|
$0.040
|
$0.200
|
$0.750
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,097.000
|
$0.600
|
$0.060
|
$0.100
|
$0.060
|
$0.300
|
$0.750
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
417.000
|
$0.750
|
$0.250
|
$4.000
|
$0.250
|
$0.600
|
$0.750
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,777.000
|
$0.900
|
$0.500
|
$0.400
|
$0.500
|
$0.900
|
$2.300
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
29.000
|
$25.000
|
$25.000
|
$16.000
|
$25.000
|
$30.000
|
$28.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
15.000
|
$30.000
|
$25.000
|
$7.900
|
$25.000
|
$30.000
|
$28.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
4.000
|
$25.000
|
$25.000
|
$259.000
|
$25.000
|
$50.000
|
$28.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
35.000
|
$25.000
|
$25.000
|
$3.400
|
$25.000
|
$25.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
14.000
|
$30.000
|
$5.000
|
$8.500
|
$5.000
|
$10.000
|
$25.000
|
|
|
PAV SURF PREP FOR MRK (BIKE ARROW)
|
EA
|
3.000
|
$32.000
|
$10.000
|
$40.000
|
$10.000
|
$10.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (BIKE SYMBOL)
|
EA
|
3.000
|
$33.000
|
$10.000
|
$40.000
|
$10.000
|
$10.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (BIKE DOT)
|
EA
|
49.000
|
$2.000
|
$0.020
|
$3.000
|
$0.020
|
$2.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
748.000
|
$0.700
|
$2.500
|
$3.000
|
$2.500
|
$0.500
|
$1.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
6.000
|
$12,500.000
|
$6,000.000
|
$14,150.000
|
$8,546.470
|
$9,000.000
|
$32,900.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
1.000
|
$20,000.000
|
$6,000.000
|
$10,804.000
|
$16,429.990
|
$10,000.000
|
$41,900.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
64.000
|
$275.000
|
$300.000
|
$235.000
|
$346.140
|
$275.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
19.000
|
$325.000
|
$300.000
|
$235.000
|
$346.140
|
$275.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
64.000
|
$275.000
|
$300.000
|
$235.000
|
$346.140
|
$275.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
20.000
|
$325.000
|
$300.000
|
$235.000
|
$346.140
|
$275.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
64.000
|
$275.000
|
$300.000
|
$235.000
|
$346.140
|
$275.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
15.000
|
$325.000
|
$300.000
|
$235.000
|
$346.140
|
$275.000
|
$350.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
24.000
|
$750.000
|
$625.000
|
$683.000
|
$742.010
|
$500.000
|
$840.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
71.000
|
$200.000
|
$150.000
|
$127.000
|
$181.890
|
$150.000
|
$275.000
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
7.000
|
$270.000
|
$175.000
|
$193.000
|
$195.390
|
$170.000
|
$275.000
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
1.000
|
$235.000
|
$225.000
|
$211.000
|
$222.410
|
$200.000
|
$275.000
|
|
|
TRF SIG CBL (TY A)(10 AWG)(2 CONDR)
|
LF
|
1,275.000
|
$3.500
|
$4.000
|
$3.600
|
$4.380
|
$1.000
|
$3.500
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
6,910.000
|
$2.000
|
$1.500
|
$1.900
|
$1.970
|
$1.000
|
$2.100
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
14,521.000
|
$2.100
|
$1.750
|
$2.500
|
$2.510
|
$2.000
|
$3.100
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
2,252.000
|
$4.500
|
$2.500
|
$3.100
|
$3.170
|
$3.000
|
$3.500
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
1,690.000
|
$7.500
|
$6.000
|
$7.100
|
$8.160
|
$6.000
|
$7.500
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
5.000
|
$6,100.000
|
$5,500.000
|
$7,508.000
|
$6,884.230
|
$9,500.000
|
$7,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM
|
EA
|
1.000
|
$11,000.000
|
$10,250.000
|
$11,139.000
|
$10,173.920
|
$12,000.000
|
$18,700.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
4.000
|
$11,800.000
|
$11,000.000
|
$11,591.000
|
$10,761.860
|
$13,000.000
|
$13,200.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
4.000
|
$14,000.000
|
$11,750.000
|
$12,712.000
|
$12,094.720
|
$14,000.000
|
$15,225.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
6.000
|
$14,500.000
|
$12,250.000
|
$14,730.000
|
$13,595.780
|
$15,000.000
|
$15,768.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
2.000
|
$15,500.000
|
$12,750.000
|
$13,760.000
|
$13,675.230
|
$16,000.000
|
$16,100.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
4.000
|
$16,000.000
|
$13,750.000
|
$14,275.000
|
$15,488.120
|
$18,000.000
|
$16,995.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
1.000
|
$35,000.000
|
$35,000.000
|
$36,033.000
|
$45,263.000
|
$43,000.000
|
$35,567.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM
|
EA
|
1.000
|
$37,000.000
|
$36,000.000
|
$36,931.000
|
$45,594.320
|
$44,000.000
|
$41,000.000
|
|
|
INS TRF SIG PL AM (MAST)(INSTALL ONLY)
|
EA
|
6.000
|
$2,100.000
|
$1,500.000
|
$370.000
|
$1,669.860
|
$1,000.000
|
$5,001.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
16.000
|
$2,500.000
|
$2,200.000
|
$3,425.000
|
$2,800.190
|
$3,500.000
|
$2,750.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
24.000
|
$1,000.000
|
$850.000
|
$1,110.000
|
$912.590
|
$900.000
|
$999.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
3.000
|
$4,000.000
|
$3,000.000
|
$3,798.000
|
$3,572.510
|
$3,000.000
|
$4,004.000
|
|
|
INSTALL FUSED DISCONNECT
|
EA
|
1.000
|
$1,200.000
|
$1,500.000
|
$944.000
|
$3,196.200
|
$3,800.000
|
$2,500.000
|
|
|
SUBSURFACE UTIL LOCATE (NON-PAVED AREA)
|
EA
|
14.000
|
$1,500.000
|
$1,000.000
|
$703.000
|
$860.680
|
$400.000
|
$559.000
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
2,580.000
|
$5.000
|
$1.500
|
$1.500
|
$1.390
|
$2.000
|
$3.010
|
|
|
VIVDS PROSR SYS
|
EA
|
5.000
|
$4,500.000
|
$9,500.000
|
$15,340.000
|
$9,033.670
|
$10,000.000
|
$13,219.980
|
|
|
VIVDS CAM ASSY FXD LNS
|
EA
|
17.000
|
$2,500.000
|
$2,500.000
|
$3,542.000
|
$6,355.910
|
$3,000.000
|
$4,407.450
|
|
|
VIVDS CNTRL SOFTWARE
|
EA
|
5.000
|
$4,000.000
|
$350.000
|
$11,284.000
|
$403.120
|
$500.000
|
$2,432.120
|
|
|
VIVDS CABLING
|
LF
|
3,710.000
|
$2.000
|
$1.500
|
$1.500
|
$1.970
|
$2.000
|
$3.530
|
|
|
BBU SYSTEM (EXTERNAL BATTERY CABINET)
|
EA
|
6.000
|
$8,250.000
|
$6,500.000
|
$7,940.000
|
$8,275.560
|
$7,500.000
|
$9,200.000
|
|
|
RVDS (PRESENCE DETECTION ONLY)
|
EA
|
6.000
|
$7,300.000
|
$6,000.000
|
$8,888.000
|
$5,655.900
|
$5,400.000
|
$8,123.000
|
|
|
RVDS (ADVANCE DETECTION ONLY)
|
EA
|
4.000
|
$8,500.000
|
$6,500.000
|
$9,278.000
|
$5,655.890
|
$5,400.000
|
$8,125.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
1.000
|
$600.000
|
$300.000
|
$185.000
|
$438.320
|
$600.000
|
$550.000
|
|
|
GROUND BOX (ADJUST)
|
EA
|
1.000
|
$750.000
|
$500.000
|
$554.000
|
$879.590
|
$835.000
|
$700.000
|
|
|
INSTALLATION OF CELLULAR MODEM
|
EA
|
6.000
|
$1,350.000
|
$500.000
|
$370.000
|
$738.720
|
$150.000
|
$1,136.400
|
|
|
CCTV MOUNT (POLE)
|
EA
|
2.000
|
$800.000
|
$300.000
|
$121.000
|
$168.470
|
$500.000
|
$890.000
|
|
Totals: |
$2,376,787.950
|
$2,047,796.580
|
$2,415,473.650
|
$2,418,228.640
|
$2,562,106.750
|
$2,771,447.750
|