TRAVIS SH 130 (0440-06-018)

Items: 218

County: TRAVIS
Length: N/A
Highway: SH 130
District: AUSTIN
Control Number: 0440-06-018
DBE Goal: N/A
Project: CC 440-6-18
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $70,540,746.62
Date: 06/06/2018 (7 years ago)
Contract Number: N/A
Type: ADD ONE LANE IN EACH DIRECTION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$70,540,746.62
1
Rejected
$69,910,317.29
Over/Under Est: -0.89% -$630,429.33
Over/Under Est: 0.33% $230,902.86
Amt Left: 1.23% $861,332.19
$73,255,543.66
Over/Under Est: 3.85% $2,714,797.04
Amt Left: 4.79% $3,345,226.37
Delta: -3.51% -$2,483,894.18
Over/Under Est: 16.18% $11,411,886.59
Amt Left: 17.23% $12,042,315.92
Delta: -11.87% -$8,697,089.55
Over/Under Est: 17.44% $12,300,263.07
Amt Left: 18.5% $12,930,692.40
Delta: -1.08% -$888,376.48

Bid Items & Bid Tabulations

218 Total 0 of 218
TRAVIS  |  SH 130  |  AUSTIN  |  0440-06-018  |  06/06/2018  |  $70,540,746.62  |  CC 440-6-18  |  ADD ONE LANE IN EACH DIRECTION  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
JAMES CONSTRUCTION GROUP, L.L.C.
OHL USA, INC.
JORDAN FOSTER CONSTRUCTION, LLC
FLATIRON CONSTRUCTORS, INC.
PREPARING ROW
STA 586.910 $4,000.000 $3,734.040 $5,603.730 $11,207.930 $2,725.000 $12,100.000
REMOVING CONC (PAV)
SY 2,335.000 $17.000 $8.000 $12.690 $21.590 $14.000 $12.600
REMOVING CONC (RIPRAP)
SY 8,655.000 $6.000 $6.250 $3.420 $12.880 $8.000 $5.540
REMOVING CONC (MEDIANS)
SY 14.000 $35.000 $70.000 $192.070 $42.000 $22.000 $8.190
REMOVING CONC (SIDEWALKS)
SY 278.000 $20.000 $25.000 $56.220 $16.040 $9.500 $41.490
REMOVING CONC (CTB)
LF 120.000 $25.000 $27.000 $14.830 $27.580 $25.000 $14.420
REMOVING CONCRETE(MOW STRIP)
LF 8,519.000 $4.500 $8.950 $1.930 $3.280 $3.250 $2.480
EXCAVATION (ROADWAY)
CY 298,304.000 $5.000 $3.200 $1.120 $6.210 $6.750 $4.170
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 290,179.000 $3.000 $4.850 $3.970 $3.400 $6.250 $3.980
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 182,112.000 $25.000 $23.500 $26.960 $25.190 $37.500 $30.000
FURNISHING AND PLACING TOPSOIL (4")
SY 1,050,706.000 $0.500 $0.750 $0.630 $0.540 $0.800 $1.290
BROADCAST SEED (TEMP) (WARM)
SY 525,353.000 $0.050 $0.070 $0.070 $0.060 $0.070 $0.070
BROADCAST SEED (TEMP) (COOL)
SY 525,353.000 $0.050 $0.070 $0.070 $0.060 $0.070 $0.070
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 1,050,706.000 $0.080 $0.100 $0.100 $0.080 $0.100 $0.100
VEGETATIVE WATERING
MG 26,051.000 $15.000 $28.000 $12.140 $15.000 $21.000 $20.360
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 1,050,706.000 $0.650 $0.840 $0.840 $0.880 $0.880 $0.850
CEM TRT(PLNT MX) (CL N)(TY D)(GR 4)(6")
SY 234,607.000 $9.500 $12.650 $12.040 $9.260 $11.500 $13.390
D-GR HMA TY-D PG64-22
TON 12,336.000 $75.000 $75.500 $77.000 $72.020 $84.000 $75.880
PLAN & TEXT CONC PAV(0" TO 1/2")
SY 728.000 $100.000 $24.420 $10.570 $37.320 $15.000 $11.580
CONC PVMT (CONT REINF - CRCP) (13")
SY 206,355.000 $53.000 $59.000 $61.510 $61.350 $72.000 $53.500
CONC PVMT (JOINTED - CPCD) (6")
SY 368.000 $60.000 $65.000 $33.730 $66.000 $59.000 $52.000
CONC PVMT (JOINTED - CPCD) (13")
SY 319.000 $80.000 $139.080 $71.460 $119.370 $85.000 $65.000
FULL - DEPTH REPAIR CRCP (13")
SY 678.000 $285.000 $220.000 $300.000 $252.720 $145.000 $500.000
CEM STABIL BKFL
CY 1,186.500 $115.000 $100.650 $78.910 $118.200 $120.000 $78.900
FLOWABLE BACKFILL
CY 28.300 $180.000 $406.510 $308.770 $477.660 $135.000 $114.750
TRENCH EXCAVATION PROTECTION
LF 172.000 $5.000 $16.000 $1.220 $1.110 $3.000 $1.110
TEMPORARY SPL SHORING
SF 2,342.000 $50.000 $35.000 $42.470 $13.490 $32.000 $40.000
DRILL SHAFT (18 IN)
LF 213.000 $80.000 $37.880 $36.970 $37.280 $41.000 $100.000
DRILL SHAFT (36 IN)
LF 7,400.000 $125.000 $150.170 $147.420 $137.070 $152.000 $250.000
DRILL SHAFT (42 IN)
LF 1,085.000 $240.000 $205.340 $201.960 $247.050 $260.000 $300.000
DRILL SHAFT (48 IN)
LF 2,656.000 $255.000 $272.230 $262.800 $238.110 $300.000 $400.000
DRILL SHAFT (60 IN)
LF 401.000 $425.000 $421.120 $411.350 $541.370 $450.000 $500.000
DRILL SHAFT (72 IN)
LF 615.000 $600.000 $594.430 $588.330 $611.110 $640.000 $700.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 320.000 $415.000 $500.000 $400.000 $414.870 $425.000 $400.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 450.000 $190.000 $187.000 $210.000 $217.800 $200.000 $188.890
CL C CONC (ABUT)
CY 68.000 $1,000.000 $1,241.970 $841.850 $777.040 $700.000 $1,200.000
CL C CONC (ABUT)(EXTEND)
CY 412.400 $1,000.000 $1,256.180 $1,004.020 $1,012.340 $1,200.000 $1,200.000
CL C CONC (CAP)
CY 580.600 $1,000.000 $1,524.110 $1,078.340 $1,014.090 $1,450.000 $1,600.000
CL C CONC (CAP)(MASS)
CY 263.700 $825.000 $1,019.280 $1,218.010 $901.660 $1,650.000 $1,600.000
CL C CONC (COLUMN)
CY 817.100 $850.000 $759.940 $416.460 $800.000 $1,500.000 $900.000
CL C CONC (COLUMN)(MASS)
CY 483.700 $875.000 $701.010 $457.150 $667.390 $1,250.000 $900.000
CL C CONC (FOOTING)(SRC)
CY 52.000 $900.000 $1,050.000 $588.220 $810.090 $1,000.000 $880.000
CL C CONC (CRASHWALL)
CY 254.200 $800.000 $788.990 $581.900 $646.810 $575.000 $1,800.000
CL C CONC (SIGN COLUMN)(SRC)
CY 100.000 $900.000 $1,200.000 $1,219.660 $1,008.440 $2,200.000 $2,100.000
REINF CONC SLAB
SF 9,872.000 $20.000 $25.000 $17.440 $12.440 $24.000 $18.240
REINF CONC SLAB (EXTEND SLAB)
SF 192,261.000 $18.000 $19.000 $15.750 $17.250 $21.000 $14.150
APPROACH SLAB (EXTEND)
CY 443.400 $475.000 $498.650 $543.760 $500.000 $475.000 $520.280
PRESTR CONC GIRDER (TX54)
LF 21,195.440 $132.500 $128.600 $134.750 $142.190 $156.000 $200.000
PRESTR CONC GIRDER (TX70)
LF 3,139.380 $132.500 $155.680 $182.570 $151.520 $160.000 $200.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 6.000 $500.000 $978.000 $136.530 $1,028.870 $1,000.000 $382.000
CONC STR REPR(REMOV AND REPL BACKWALL)
CY 30.000 $2,500.000 $2,419.970 $1,203.360 $1,055.130 $1,500.000 $2,017.010
RIPRAP (CONC)(4 IN)
CY 568.000 $400.000 $310.000 $346.740 $394.790 $485.000 $333.330
RIPRAP (CONC)(5 IN)
CY 885.000 $400.000 $365.000 $400.030 $440.150 $480.000 $358.970
RIPRAP (MOW STRIP)(4 IN)
CY 500.000 $400.000 $372.000 $607.290 $408.260 $485.000 $346.670
CLEANING AND SEALING EXISTING JOINTS
LF 200.000 $88.000 $67.000 $27.000 $35.000 $75.000 $45.400
RAIL (TY SSTR)
LF 11,307.710 $45.000 $48.000 $43.520 $59.050 $37.000 $38.360
RAIL (TY PR22)
LF 1,675.000 $80.000 $123.930 $128.980 $64.050 $95.000 $94.830
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 1,344.000 $88.000 $120.880 $102.790 $80.000 $215.000 $115.000
RC PIPE (CL III)(18 IN)
LF 149.000 $69.000 $65.000 $105.700 $91.110 $80.000 $55.460
RC PIPE (CL III)(24 IN)
LF 124.000 $79.000 $110.000 $128.550 $132.320 $100.000 $68.800
RC PIPE (CL III)(30 IN)
LF 120.000 $100.000 $115.000 $154.400 $111.020 $110.000 $85.380
RC PIPE (CL III)(36 IN)
LF 88.000 $150.000 $125.000 $219.340 $160.630 $155.000 $103.410
RC PIPE (CL III)(42 IN)
LF 110.000 $168.000 $142.000 $217.010 $162.340 $200.000 $120.890
INLET(COMPL)(DROP)(TY 1)(1 GRATE)
EA 5.000 $4,300.000 $5,000.000 $6,141.880 $5,916.610 $7,800.000 $4,011.270
INLET(COMP)(DROP)(TY 2)
EA 7.000 $5,000.000 $5,000.000 $2,773.340 $3,648.970 $4,600.000 $4,011.340
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 1.000 $700.000 $1,000.000 $1,205.140 $805.840 $1,300.000 $655.150
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $750.000 $1,350.000 $1,205.120 $991.040 $1,600.000 $524.200
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 1.000 $1,500.000 $1,000.000 $1,452.670 $879.910 $1,800.000 $899.770
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 3.000 $2,500.000 $1,350.000 $1,592.560 $1,410.800 $1,900.000 $1,020.930
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 1.000 $2,700.000 $1,500.000 $1,807.820 $1,143.310 $2,100.000 $1,622.090
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 1.000 $3,000.000 $1,800.000 $2,432.020 $1,200.920 $2,200.000 $1,622.090
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 2.000 $1,750.000 $2,100.000 $2,432.000 $1,941.710 $2,500.000 $1,115.100
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 2.000 $2,500.000 $2,500.000 $2,851.720 $1,797.660 $2,500.000 $2,056.360
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $3,000.000 $2,850.000 $3,228.400 $2,093.980 $2,500.000 $2,056.360
SET (TY II) (42 IN) (RCP) (3: 1) (C)
EA 2.000 $5,000.000 $3,100.000 $3,465.160 $3,069.340 $3,800.000 $2,477.560
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 2.000 $5,500.000 $3,400.000 $3,820.310 $3,686.660 $5,700.000 $2,477.560
GRATE AND FRAME (BRIDGE DRAIN)
EA 21.000 $3,000.000 $2,500.000 $1,882.320 $2,482.630 $3,200.000 $1,419.840
PIPE (PVC) (SCH 40) (6 IN)
LF 610.000 $50.000 $37.000 $34.290 $19.470 $45.000 $9.420
PIPE (PVC) (SCH 40) (8 IN)
LF 527.000 $60.000 $39.000 $36.250 $23.470 $50.000 $11.260
REMOV STR (INLET)
EA 13.000 $1,500.000 $1,000.000 $1,421.780 $619.480 $650.000 $1,117.900
REMOV STR (SET)
EA 19.000 $350.000 $1,000.000 $710.890 $649.320 $325.000 $209.590
REMOV STR (WINGWALL)
EA 33.000 $1,200.000 $3,000.000 $920.700 $649.320 $2,500.000 $387.910
REMOV STR (PIPE)
LF 196.000 $20.000 $16.000 $27.900 $16.740 $16.000 $15.510
REMOVE STR (CONC)
EA 7.000 $5,000.000 $1,200.000 $2,466.890 $649.320 $350.000 $1,470.800
REMOV STR (BRIDGE SLAB)
LF 10,895.000 $45.000 $42.420 $93.890 $66.540 $17.000 $30.320
MOBILIZATION
LS 1.000 $5,381,100.000 $6,000,000.000 $5,000,000.000 $6,500,000.000 $6,851,500.000 $7,145,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 26.000 $7,750.000 $13,000.000 $22,090.930 $14,367.910 $21,000.000 $29,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,568.000 $12.000 $30.000 $29.260 $30.720 $11.000 $29.560
CONSTRUCTION EXITS (REMOVE)
SY 1,568.000 $7.500 $9.000 $9.660 $10.140 $8.500 $9.760
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,907.000 $2.250 $2.750 $2.690 $2.820 $2.000 $2.720
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,907.000 $0.450 $0.510 $0.510 $0.540 $0.500 $0.520
CONSTRUCTING DETOURS
SY 26,675.000 $50.000 $13.940 $14.520 $5.960 $16.000 $28.460
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 86,535.000 $35.000 $22.000 $45.000 $30.000 $40.000 $48.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,290.000 $32.000 $60.000 $72.440 $54.890 $38.000 $30.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $40.000 $63.000 $72.440 $45.500 $55.000 $30.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 7,650.000 $11.000 $7.000 $4.710 $4.650 $8.000 $10.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 24,750.000 $6.000 $4.000 $4.220 $6.650 $8.000 $10.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 20,430.000 $5.000 $6.000 $3.570 $4.500 $7.500 $4.140
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 12,040.000 $3.750 $5.000 $3.340 $7.960 $6.500 $3.540
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 7,650.000 $6.000 $5.000 $3.670 $4.530 $6.500 $4.100
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 27,963.000 $4.000 $3.000 $4.670 $1.910 $5.000 $3.580
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 86,535.000 $7.000 $3.000 $3.660 $2.770 $5.000 $4.550
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,290.000 $9.000 $3.000 $4.940 $7.630 $9.000 $4.150
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 140.000 $11.000 $7.000 $4.550 $11.630 $14.000 $8.170
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 672.920 $75.000 $67.830 $69.660 $88.880 $210.000 $50.890
CURB RAMPS (TY 6)
SY 11.000 $125.000 $150.000 $1,500.720 $313.440 $2,025.000 $100.000
MTL W-BEAM GD FEN (TIM POST)
LF 5,337.500 $17.500 $18.500 $18.500 $24.640 $18.000 $21.070
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 22.000 $1,670.000 $1,233.000 $1,233.000 $1,945.530 $1,445.000 $1,663.940
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 43.000 $950.000 $1,025.000 $1,025.000 $794.370 $590.000 $679.390
SHORT RADIUS (TY IV)
LF 50.000 $100.000 $30.000 $30.000 $24.640 $26.000 $21.070
DRIVEWAY TERMINAL ANCHOR SECTION(TY IV)
EA 2.000 $1,000.000 $676.000 $676.000 $1,028.860 $1,000.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 5,199.000 $1.150 $1.000 $1.000 $1.350 $1.000 $1.150
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $246.000 $100.000 $100.000 $168.300 $125.000 $143.940
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $150.000 $100.000 $100.000 $168.300 $125.000 $143.940
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 30.000 $110.000 $100.000 $100.000 $242.350 $180.000 $207.270
GUARDRAIL END TREATMENT (INSTALL)
EA 43.000 $2,250.000 $2,296.000 $2,296.000 $3,023.990 $2,240.000 $2,586.300
GUARDRAIL END TREATMENT (REMOVE)
EA 42.000 $170.000 $100.000 $100.000 $296.210 $220.000 $253.330
CRASH CUSH ATTEN (INSTL)
EA 10.000 $11,500.000 $11,300.000 $11,300.000 $19,614.260 $11,500.000 $11,589.740
CRASH CUSH ATTEN (MOVE & RESET)
EA 11.000 $1,350.000 $1,250.000 $1,250.000 $2,382.300 $1,300.000 $1,282.050
CRASH CUSH ATTEN (REMOVE)
EA 10.000 $600.000 $500.000 $500.000 $1,349.970 $500.000 $512.820
RELOCATE RD IL ASM (TRANS-BASE)
EA 35.000 $1,400.000 $1,500.000 $1,500.000 $1,555.750 $1,500.000 $1,515.150
REMOVE RD IL ASM (TRANS-BASE)
EA 2.000 $350.000 $200.000 $220.000 $228.180 $220.000 $202.020
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 6.000 $2,400.000 $2,700.000 $2,700.000 $2,800.350 $2,700.000 $2,727.270
IN RD IL (TY SA) 50T-8-8 (400W EQ) LED
EA 4.000 $4,000.000 $4,000.000 $4,100.000 $4,252.370 $4,100.000 $4,040.410
CONDT (PVC) (SCH 40) (2")
LF 38,193.000 $8.000 $6.000 $7.750 $8.040 $6.000 $6.060
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,996.000 $40.000 $30.000 $41.000 $42.520 $35.000 $30.300
CONDT (PVC) (SCH 40) (3")
LF 14,475.000 $7.500 $7.000 $9.750 $10.110 $9.000 $7.070
CONDT (PVC) (SCH 80) (2") (BORE)
LF 4,515.000 $27.000 $31.000 $32.000 $33.190 $33.000 $31.310
CONDT (PVC) (SCH 80) (3") (BORE)
LF 3,530.000 $26.000 $32.000 $32.000 $33.190 $32.000 $32.320
ELEC CONDR (NO.14) BARE
LF 545.000 $1.150 $1.000 $0.900 $0.940 $1.000 $1.010
ELEC CONDR (NO.14) INSULATED
LF 1,090.000 $1.150 $2.000 $0.800 $0.830 $2.000 $2.020
ELEC CONDR (NO.8) BARE
LF 18,797.000 $1.300 $1.100 $1.150 $1.190 $1.150 $1.110
ELEC CONDR (NO.8) INSULATED
LF 43,136.000 $1.300 $1.100 $1.150 $1.190 $1.150 $1.110
ELEC CONDR (NO.6) BARE
LF 5,262.000 $1.500 $1.300 $1.400 $1.450 $1.500 $1.310
ELEC CONDR (NO.6) INSULATED
LF 10,524.000 $1.750 $1.300 $1.350 $1.400 $1.400 $1.310
ELEC CONDR (NO.4) BARE
LF 7,575.000 $1.750 $1.600 $1.950 $2.030 $2.000 $1.620
ELEC CONDR (NO.4) INSULATED
LF 15,150.000 $2.000 $1.700 $1.900 $1.980 $1.900 $1.720
ELEC CONDR (NO.2) BARE
LF 23,300.000 $3.000 $2.500 $2.700 $2.800 $2.750 $2.530
ELEC CONDR (NO.2) INSULATED
LF 46,600.000 $2.750 $2.500 $2.750 $2.850 $2.750 $2.530
ELEC CONDR (NO.1/0) BARE
LF 24,035.000 $4.050 $4.000 $4.450 $4.620 $4.500 $4.040
ELEC CONDR (NO.1/0) INSULATED
LF 47,080.000 $4.200 $4.000 $4.550 $4.720 $4.500 $4.040
ELEC CONDR (NO.2/0) BARE
LF 1,445.000 $5.150 $4.500 $5.750 $5.970 $5.750 $4.550
ELEC CONDR (NO.2/0) INSULATED
LF 2,890.000 $3.100 $4.500 $6.000 $6.220 $6.000 $4.550
ELEC CONDR (NO.3/0) BARE
LF 2,605.000 $12.250 $5.000 $7.750 $8.040 $7.500 $5.050
ELEC CONDR (NO.3/0) INSULATED
LF 5,210.000 $4.750 $6.000 $7.750 $8.040 $6.000 $6.060
GROUND BOX TY A (122311)W/APRON
EA 125.000 $800.000 $750.000 $790.000 $819.360 $775.000 $757.580
GROUND BOX TY D (162922)W/APRON
EA 66.000 $1,185.000 $1,000.000 $980.000 $1,016.420 $1,000.000 $1,010.100
REMOVE GROUND BOX
EA 11.000 $100.000 $100.000 $75.000 $77.780 $76.000 $101.010
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 2.000 $4,500.000 $4,700.000 $4,600.000 $4,770.950 $4,700.000 $4,747.480
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 8.000 $4,500.000 $4,800.000 $4,600.000 $4,770.950 $4,700.000 $4,848.490
ELC SRV TY D 120/240 125(NS)GS(N)SP(O)
EA 2.000 $5,000.000 $4,900.000 $4,700.000 $4,874.670 $4,800.000 $4,949.500
ELC SRV TY D 120/240 200(NS)GS(N)SP(O)
EA 4.000 $4,800.000 $5,000.000 $5,300.000 $5,496.960 $5,200.000 $5,050.510
ALUMINUM SIGNS (TY A)
SF 124.000 $40.000 $35.000 $40.000 $41.480 $40.000 $35.350
ALUMINUM SIGNS (TY O)
SF 2,297.500 $20.000 $21.000 $20.000 $20.740 $25.000 $21.210
REFURBISH ALUMINUM SIGNS (TY O)
EA 4.000 $750.000 $600.000 $410.000 $425.240 $420.000 $606.060
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $460.000 $418.000 $396.280 $430.060 $380.000 $419.590
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 26.000 $530.000 $532.000 $549.510 $547.360 $545.000 $571.810
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 6.000 $510.000 $493.000 $462.860 $507.230 $460.000 $485.420
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 22.000 $575.000 $730.000 $673.150 $751.070 $665.000 $694.790
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 3.000 $1,450.000 $1,650.000 $1,690.800 $1,697.630 $1,650.000 $2,424.240
REMOVE SM RD SN SUP&AM
EA 56.000 $75.000 $72.000 $100.390 $74.080 $65.000 $68.180
REMOVE LRSA
EA 2.000 $550.000 $550.000 $560.000 $580.810 $350.000 $358.590
INS OH SN SUP(30 FT BAL TEE)
EA 5.000 $26,000.000 $23,000.000 $18,100.000 $18,772.650 $24,000.000 $23,232.320
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
EA 4.000 $15,000.000 $11,000.000 $14,000.000 $14,520.280 $11,000.000 $11,111.110
REMOVE OVERHD SIGN SUP
EA 1.000 $9,000.000 $2,500.000 $1,900.000 $1,970.610 $2,500.000 $2,525.250
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 9.000 $450.000 $500.000 $450.000 $466.720 $550.000 $505.050
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 80.000 $40.000 $68.000 $40.160 $69.960 $40.000 $39.130
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 66.000 $90.000 $68.000 $40.160 $69.960 $40.000 $39.130
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 53.000 $45.000 $68.000 $41.740 $69.960 $40.000 $42.480
INSTL OM ASSM (OM-3L)(FLX)GND
EA 18.000 $175.000 $145.000 $84.540 $149.190 $85.000 $204.550
INSTL OM ASSM (OM-3R)(FLX)GND
EA 25.000 $175.000 $145.000 $84.540 $149.190 $85.000 $204.550
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 36,720.000 $0.500 $0.750 $0.750 $0.790 $0.500 $0.480
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 41,216.000 $0.500 $0.750 $0.750 $0.790 $0.450 $0.440
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 136,373.000 $0.400 $0.750 $0.750 $0.790 $0.450 $0.440
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 21,234.000 $0.650 $0.650 $0.650 $0.680 $0.600 $0.590
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
LF 5,290.000 $1.000 $2.000 $2.000 $2.100 $2.300 $2.330
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 5,878.000 $2.730 $12.000 $4.000 $4.200 $2.400 $2.430
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 64.000 $10.000 $12.000 $85.000 $6.170 $6.000 $6.080
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 16.000 $85.000 $85.000 $750.000 $89.240 $115.000 $118.480
REFL PAV MRK TY I(W)(LNDP ARW)(090MIL)
EA 3.000 $350.000 $750.000 $725.000 $787.400 $400.000 $405.060
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 16.000 $115.000 $95.000 $0.520 $99.740 $130.000 $131.650
REFL PAV MRK TY I(W)(EXIT GORE)(090MIL)
EA 8.000 $800.000 $725.000 $0.520 $761.160 $980.000 $992.410
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
LF 101,762.000 $0.600 $0.520 $0.520 $0.550 $1.000 $0.920
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
LF 115,029.000 $0.600 $0.520 $0.520 $0.550 $0.900 $0.920
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 16,161.000 $0.350 $0.520 $0.520 $0.550 $0.500 $0.510
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 2,894.000 $0.500 $0.520 $0.520 $0.550 $0.500 $0.510
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 58,685.000 $4.000 $6.800 $6.800 $7.140 $9.000 $9.110
REFL PAV MRKR TY I-C
EA 3,672.000 $2.500 $3.000 $3.000 $3.150 $2.500 $28.350
REFL PAV MRKR TY II-C-R
EA 5,213.000 $2.500 $3.500 $3.500 $3.670 $2.800 $2.840
ELIM EXT PAV MRK & MRKS (4")
LF 171,475.000 $0.200 $0.180 $0.160 $0.130 $0.250 $0.270
ELIM EXT PAV MRK & MRKS (12")
LF 212.000 $10.000 $0.800 $1.000 $6.170 $5.000 $5.060
ELIM EXT PAV MRK & MRKS (24")
LF 64.000 $20.000 $2.000 $3.000 $8.230 $5.000 $5.060
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 240.000 $102.000 $135.000 $52.000 $205.770 $125.000 $117.790
NO. OF DAYS MILESTONE 1
$/D 20,000.000 $465.000 $390.000 $330.000 $232.000 $425.000 $398.000
NO. OF DAYS MILESTONE 2
$/D 5,000.000 $582.000 $468.000 $452.000 $582.000 $545.000 $570.000
RAISING AND UNDERSEALING CONCRETE SLAB
LB 33,080.000 $5.000 $4.500 $4.250 $4.370 $4.500 $4.340
GEOGRID BASE REINFORCEMENT (TY I)
SY 470,207.000 $1.000 $0.980 $1.240 $0.960 $0.750 $0.820
PORTABLE CHANGEABLE MESSAGE SIGN
EA 12.000 $10,500.000 $8,660.000 $10,762.100 $10,803.090 $7,100.000 $2,812.160
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 32,855.000 $3.000 $2.000 $3.050 $3.160 $2.000 $2.020
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
LF 126,810.000 $3.500 $4.000 $4.330 $4.490 $4.000 $4.040
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 69.000 $1,000.000 $935.000 $2,400.000 $2,489.190 $940.000 $944.440
FIBER OPTIC PATCH PANEL (144 POSITION)
EA 62.000 $4,700.000 $5,800.000 $8,700.000 $9,023.320 $5,900.000 $5,858.590
ITS GRND MNT CAB (TY 6) (CONF 1)
EA 14.000 $15,500.000 $13,500.000 $14,500.000 $15,038.870 $14,000.000 $13,636.360
CCTV FIELD EQUIPMENT (DIGITAL)
EA 14.000 $10,000.000 $9,500.000 $14,000.000 $14,520.280 $9,700.000 $9,595.960
CONDUIT (PREPARE)
LF 61,930.000 $1.000 $0.500 $1.620 $1.680 $0.500 $0.510
GROUND BOX (PREPARE)
EA 93.000 $250.000 $350.000 $170.000 $176.320 $375.000 $353.540
INSTALL DMS (FOUNDATION MTD CABINET)
EA 5.000 $15,000.000 $12,000.000 $13,800.000 $14,312.850 $12,000.000 $12,121.210
RADAR VEHICLE SENSING DEVICE
EA 23.000 $7,000.000 $6,000.000 $12,600.000 $13,068.250 $6,200.000 $6,060.610
ITS POLE (40 FT)(90 MPH)
EA 14.000 $6,500.000 $7,000.000 $7,900.000 $8,193.590 $7,200.000 $7,070.710
ITS POLE (60 FT)(90 MPH)
EA 15.000 $11,000.000 $12,000.000 $13,500.000 $14,001.700 $12,000.000 $12,121.210
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 29.000 $5,300.000 $5,600.000 $5,400.000 $5,600.680 $5,600.000 $5,656.570
ETHERNET SWITCH (INSTALL ONLY)
EA 45.000 $1,125.000 $500.000 $560.000 $580.820 $500.000 $505.050
MPEG 4 VIDEO ENCODER (INSTALL ONLY)
EA 14.000 $1,000.000 $500.000 $500.000 $518.580 $500.000 $505.050
TERMINAL SERVER (INSTALL ONLY)
EA 28.000 $1,000.000 $500.000 $500.000 $518.580 $500.000 $505.050
WORK ZONE INTELLIGENT TRNSPRTN SYSTEM
LS 1.000 $200,000.000 $150,637.000 $135,696.790 $139,613.770 $140,000.000 $138,466.110
BLUETOOTH DETECTION SYSTEM
EA 5.000 $8,000.000 $750.000 $3,000.000 $3,111.480 $750.000 $757.580
TMA (STATIONARY)
EA 2.000 $11,250.000 $14,000.000 $32,286.310 $5,555.880 $5,600.000 $16,000.000
TMA (MOBILE OPERATION)
HR 2,000.000 $35.000 $65.000 $73.090 $31.890 $35.000 $50.410
Totals: $70,540,746.620 $69,910,317.353 $70,771,649.547 $73,255,543.718 $81,952,633.210 $82,841,009.721