|
|
PREPARING ROW
|
STA
|
586.910
|
$4,000.000
|
$7,000.000
|
$2,182.400
|
$6,846.060
|
$2,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
2,335.000
|
$14.000
|
$15.000
|
$12.710
|
$8.000
|
$15.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
8,641.000
|
$6.000
|
$10.000
|
$3.430
|
$6.250
|
$10.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
120.000
|
$25.000
|
$50.000
|
$14.870
|
$27.000
|
$20.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
8,445.000
|
$4.000
|
$7.000
|
$1.940
|
$9.000
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
298,160.000
|
$4.500
|
$6.000
|
$1.130
|
$2.500
|
$5.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
290,139.000
|
$4.000
|
$5.000
|
$4.130
|
$4.500
|
$5.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
182,112.000
|
$25.000
|
$20.430
|
$30.430
|
$19.750
|
$32.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
1,050,706.000
|
$0.650
|
$0.070
|
$0.630
|
$0.750
|
$0.500
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
525,353.000
|
$0.070
|
$0.070
|
$0.070
|
$0.100
|
$0.070
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
525,353.000
|
$0.070
|
$0.060
|
$0.060
|
$0.110
|
$0.090
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
1,050,706.000
|
$0.100
|
$0.100
|
$0.100
|
$0.150
|
$0.090
|
|
|
VEGETATIVE WATERING
|
MG
|
26,051.000
|
$17.500
|
$0.010
|
$12.140
|
$5.000
|
$12.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
1,050,706.000
|
$0.850
|
$0.820
|
$0.740
|
$0.680
|
$0.650
|
|
|
CEM TRT(PLNT MX) (CL N)(TY D)(GR 4)(6")
|
SY
|
234,128.000
|
$12.000
|
$9.880
|
$10.960
|
$12.750
|
$12.000
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
12,336.000
|
$75.000
|
$75.250
|
$74.500
|
$78.350
|
$74.500
|
|
|
PLAN & TEXT CONC PAV(0" TO 1/2")
|
SY
|
728.000
|
$50.000
|
$38.820
|
$20.570
|
$125.000
|
$25.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
206,355.000
|
$60.000
|
$55.000
|
$60.680
|
$54.000
|
$62.000
|
|
|
CONC PVMT (JOINTED - CPCD) (13")
|
SY
|
319.000
|
$95.000
|
$117.250
|
$65.340
|
$142.000
|
$90.000
|
|
|
FULL - DEPTH REPAIR CRCP (13")
|
SY
|
678.000
|
$265.000
|
$261.990
|
$300.000
|
$375.000
|
$290.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,090.500
|
$110.000
|
$116.970
|
$67.490
|
$116.000
|
$110.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
28.300
|
$350.000
|
$483.460
|
$288.680
|
$380.000
|
$675.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
172.000
|
$5.000
|
$1.080
|
$2.450
|
$16.000
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,342.000
|
$40.000
|
$13.160
|
$42.480
|
$35.000
|
$12.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
213.000
|
$60.000
|
$37.180
|
$66.020
|
$37.880
|
$50.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
6,990.000
|
$150.000
|
$148.000
|
$147.140
|
$150.170
|
$175.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
1,085.000
|
$220.000
|
$255.920
|
$208.980
|
$205.340
|
$300.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
2,656.000
|
$265.000
|
$290.340
|
$309.980
|
$272.230
|
$350.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
401.000
|
$425.000
|
$417.140
|
$451.830
|
$421.120
|
$500.000
|
|
|
DRILL SHAFT (72 IN)
|
LF
|
615.000
|
$600.000
|
$583.320
|
$501.230
|
$594.430
|
$700.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
320.000
|
$415.000
|
$385.000
|
$409.830
|
$363.110
|
$450.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
450.000
|
$200.000
|
$200.000
|
$204.910
|
$200.000
|
$200.000
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
412.400
|
$1,050.000
|
$850.000
|
$963.550
|
$1,300.000
|
$1,200.000
|
|
|
CL C CONC (CAP)
|
CY
|
551.600
|
$1,250.000
|
$1,250.000
|
$1,081.180
|
$1,100.000
|
$1,200.000
|
|
|
CL C CONC (CAP)(MASS)
|
CY
|
263.700
|
$1,050.000
|
$1,000.000
|
$1,221.150
|
$1,100.000
|
$1,200.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
750.600
|
$850.000
|
$850.000
|
$451.720
|
$825.000
|
$900.000
|
|
|
CL C CONC (COLUMN)(MASS)
|
CY
|
483.700
|
$750.000
|
$750.000
|
$456.070
|
$775.000
|
$800.000
|
|
|
CL C CONC (FOOTING)(SRC)
|
CY
|
52.000
|
$900.000
|
$850.000
|
$600.820
|
$1,050.000
|
$800.000
|
|
|
CL C CONC (CRASHWALL)
|
CY
|
236.800
|
$800.000
|
$700.000
|
$412.930
|
$930.000
|
$700.000
|
|
|
CL C CONC (SIGN COLUMN)(SRC)
|
CY
|
100.000
|
$1,200.000
|
$1,050.000
|
$1,279.740
|
$1,200.000
|
$1,100.000
|
|
|
REINF CONC SLAB (EXTEND SLAB)
|
SF
|
192,261.000
|
$18.000
|
$20.000
|
$15.660
|
$20.000
|
$18.000
|
|
|
APPROACH SLAB (EXTEND)
|
CY
|
443.400
|
$500.000
|
$450.000
|
$529.170
|
$500.000
|
$600.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
19,350.440
|
$132.500
|
$145.000
|
$133.790
|
$128.850
|
$140.000
|
|
|
PRESTR CONC GIRDER (TX70)
|
LF
|
3,139.380
|
$155.000
|
$150.000
|
$180.430
|
$133.420
|
$145.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
6.000
|
$1,000.000
|
$1,716.000
|
$136.950
|
$1,716.000
|
$1,800.000
|
|
|
CONC STR REPR(REMOV AND REPL BACKWALL)
|
CY
|
30.000
|
$1,500.000
|
$1,334.500
|
$1,208.040
|
$5,000.000
|
$1,800.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
537.000
|
$375.000
|
$425.000
|
$199.110
|
$333.000
|
$475.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
885.000
|
$400.000
|
$425.000
|
$252.570
|
$342.000
|
$450.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
479.000
|
$400.000
|
$375.000
|
$460.460
|
$359.000
|
$500.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
200.000
|
$75.000
|
$28.420
|
$49.500
|
$80.000
|
$50.000
|
|
|
RAIL (TY SSTR)
|
LF
|
11,307.710
|
$45.000
|
$36.090
|
$40.570
|
$50.000
|
$52.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
1,280.000
|
$105.000
|
$94.820
|
$112.820
|
$120.880
|
$150.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
149.000
|
$75.000
|
$74.030
|
$108.180
|
$65.000
|
$90.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
124.000
|
$120.000
|
$108.680
|
$131.110
|
$110.000
|
$110.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
120.000
|
$115.000
|
$111.600
|
$158.110
|
$115.000
|
$125.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
88.000
|
$150.000
|
$162.550
|
$225.410
|
$125.000
|
$180.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
110.000
|
$168.000
|
$162.900
|
$224.150
|
$142.000
|
$190.000
|
|
|
INLET(COMPL)(DROP)(TY 1)(1 GRATE)
|
EA
|
5.000
|
$5,500.000
|
$2,024.270
|
$4,637.590
|
$5,300.000
|
$2,500.000
|
|
|
INLET(COMP)(DROP)(TY 2)
|
EA
|
7.000
|
$4,000.000
|
$2,024.240
|
$4,637.590
|
$5,300.000
|
$4,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,000.000
|
$987.150
|
$1,200.190
|
$1,000.000
|
$1,100.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,100.000
|
$1,269.250
|
$1,425.780
|
$1,350.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
1.000
|
$1,500.000
|
$1,096.350
|
$1,580.170
|
$1,000.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,750.000
|
$1,487.640
|
$1,471.130
|
$1,350.000
|
$1,400.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,800.000
|
$1,797.050
|
$2,342.300
|
$2,100.000
|
$1,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$1,797.050
|
$2,655.350
|
$2,400.000
|
$1,700.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$2,250.000
|
$1,797.050
|
$3,307.350
|
$3,000.000
|
$1,700.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$2,343.050
|
$3,276.040
|
$3,000.000
|
$2,200.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$2,343.050
|
$3,670.060
|
$3,500.000
|
$2,700.000
|
|
|
SET (TY II) (42 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$3,500.000
|
$2,980.050
|
$3,562.110
|
$3,100.000
|
$4,700.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$4,000.000
|
$2,980.050
|
$3,562.110
|
$3,400.000
|
$5,400.000
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
21.000
|
$2,500.000
|
$2,619.410
|
$2,104.240
|
$2,500.000
|
$2,000.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
610.000
|
$40.000
|
$19.210
|
$28.220
|
$37.000
|
$30.000
|
|
|
PIPE (PVC) (SCH 40) (8 IN)
|
LF
|
527.000
|
$50.000
|
$23.180
|
$32.240
|
$39.000
|
$35.000
|
|
|
REMOV STR (INLET)
|
EA
|
13.000
|
$1,250.000
|
$644.820
|
$1,426.130
|
$1,000.000
|
$1,000.000
|
|
|
REMOV STR (SET)
|
EA
|
19.000
|
$800.000
|
$685.080
|
$713.060
|
$1,000.000
|
$525.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
33.000
|
$1,200.000
|
$685.080
|
$923.510
|
$3,000.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
196.000
|
$20.000
|
$17.870
|
$27.980
|
$16.000
|
$20.000
|
|
|
REMOVE STR (CONC)
|
EA
|
7.000
|
$2,500.000
|
$685.080
|
$2,798.280
|
$1,200.000
|
$1,500.000
|
|
|
REMOV STR (BRIDGE SLAB)
|
LF
|
10,895.000
|
$50.000
|
$73.860
|
$94.400
|
$50.000
|
$75.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$5,000,000.000
|
$5,600,000.000
|
$5,800,000.000
|
$5,800,000.000
|
$6,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
26.000
|
$15,000.000
|
$20,000.000
|
$32,547.320
|
$14,000.000
|
$10,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,568.000
|
$30.000
|
$11.500
|
$9.500
|
$25.000
|
$12.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,568.000
|
$10.000
|
$9.000
|
$4.500
|
$7.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,907.000
|
$3.000
|
$2.500
|
$1.650
|
$2.250
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,907.000
|
$0.450
|
$1.000
|
$0.200
|
$0.410
|
$0.200
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
86,535.000
|
$35.000
|
$5.500
|
$47.500
|
$25.000
|
$35.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,290.000
|
$60.000
|
$55.000
|
$73.740
|
$60.000
|
$15.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$60.000
|
$66.000
|
$73.740
|
$63.000
|
$25.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
7,650.000
|
$8.000
|
$6.000
|
$4.720
|
$7.000
|
$8.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
24,750.000
|
$5.500
|
$5.000
|
$4.240
|
$4.000
|
$7.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
20,430.000
|
$5.000
|
$5.500
|
$3.580
|
$6.000
|
$6.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
12,040.000
|
$5.000
|
$4.000
|
$3.350
|
$5.000
|
$5.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
7,650.000
|
$5.500
|
$5.500
|
$3.680
|
$5.000
|
$5.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
27,963.000
|
$4.000
|
$2.500
|
$4.680
|
$3.000
|
$4.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
86,535.000
|
$3.500
|
$2.500
|
$3.670
|
$3.000
|
$6.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,290.000
|
$5.000
|
$7.540
|
$4.950
|
$3.000
|
$8.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
140.000
|
$11.000
|
$12.200
|
$4.560
|
$7.000
|
$8.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
672.920
|
$75.000
|
$50.000
|
$67.750
|
$72.000
|
$90.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
5,237.500
|
$18.500
|
$18.800
|
$18.500
|
$18.500
|
$18.800
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$1,450.000
|
$1,445.000
|
$1,448.000
|
$1,448.000
|
$1,445.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
43.000
|
$950.000
|
$895.000
|
$1,025.000
|
$792.440
|
$895.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,125.000
|
$1.150
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$246.000
|
$125.000
|
$100.000
|
$100.000
|
$125.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
10.000
|
$150.000
|
$200.000
|
$100.000
|
$100.000
|
$200.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
30.000
|
$110.000
|
$180.000
|
$100.000
|
$100.000
|
$180.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
41.000
|
$2,300.000
|
$1,430.000
|
$2,530.000
|
$2,530.000
|
$1,430.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
42.000
|
$170.000
|
$200.000
|
$100.000
|
$100.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
10.000
|
$11,500.000
|
$11,200.000
|
$11,200.000
|
$11,200.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
11.000
|
$1,250.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,250.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
10.000
|
$600.000
|
$500.000
|
$500.000
|
$500.000
|
$500.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
35.000
|
$1,500.000
|
$1,425.000
|
$1,460.020
|
$1,425.000
|
$1,425.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
2.000
|
$350.000
|
$205.000
|
$210.040
|
$205.000
|
$205.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
6.000
|
$2,750.000
|
$2,650.000
|
$2,715.120
|
$2,650.000
|
$2,650.000
|
|
|
IN RD IL (TY SA) 50T-8-8 (400W EQ) LED
|
EA
|
4.000
|
$4,000.000
|
$3,600.000
|
$3,688.470
|
$3,600.000
|
$3,600.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
38,193.000
|
$7.000
|
$6.750
|
$6.920
|
$6.750
|
$6.750
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
1,996.000
|
$35.000
|
$39.000
|
$39.960
|
$39.000
|
$39.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
14,475.000
|
$9.000
|
$8.750
|
$8.970
|
$8.750
|
$8.750
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
4,515.000
|
$32.000
|
$30.000
|
$30.740
|
$30.000
|
$30.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
3,530.000
|
$32.000
|
$30.000
|
$30.740
|
$30.000
|
$30.000
|
|
|
ELEC CONDR (NO.14) BARE
|
LF
|
545.000
|
$1.150
|
$0.850
|
$0.870
|
$0.850
|
$0.850
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
1,090.000
|
$2.000
|
$0.850
|
$0.870
|
$0.850
|
$0.850
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
18,797.000
|
$1.150
|
$1.000
|
$1.020
|
$1.000
|
$1.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
43,136.000
|
$1.150
|
$1.000
|
$1.020
|
$1.000
|
$1.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
5,262.000
|
$1.500
|
$1.200
|
$1.230
|
$1.200
|
$1.200
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
10,524.000
|
$1.500
|
$1.250
|
$1.280
|
$1.250
|
$1.250
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
7,575.000
|
$1.750
|
$1.650
|
$1.690
|
$1.650
|
$1.650
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
15,150.000
|
$1.900
|
$1.650
|
$1.690
|
$1.650
|
$1.650
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
23,300.000
|
$2.750
|
$2.300
|
$2.360
|
$2.300
|
$2.300
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
46,600.000
|
$2.750
|
$2.350
|
$2.410
|
$2.350
|
$2.350
|
|
|
ELEC CONDR (NO.1/0) BARE
|
LF
|
24,035.000
|
$4.050
|
$4.550
|
$4.660
|
$4.550
|
$4.550
|
|
|
ELEC CONDR (NO.1/0) INSULATED
|
LF
|
47,080.000
|
$4.200
|
$4.050
|
$4.150
|
$4.050
|
$4.050
|
|
|
ELEC CONDR (NO.2/0) BARE
|
LF
|
1,445.000
|
$5.150
|
$5.500
|
$5.640
|
$5.500
|
$5.500
|
|
|
ELEC CONDR (NO.2/0) INSULATED
|
LF
|
2,890.000
|
$6.000
|
$5.300
|
$5.430
|
$5.300
|
$5.300
|
|
|
ELEC CONDR (NO.3/0) BARE
|
LF
|
2,605.000
|
$8.000
|
$6.750
|
$6.920
|
$6.750
|
$6.750
|
|
|
ELEC CONDR (NO.3/0) INSULATED
|
LF
|
5,210.000
|
$6.000
|
$7.000
|
$7.170
|
$7.000
|
$7.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
125.000
|
$800.000
|
$750.000
|
$768.430
|
$750.000
|
$750.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
66.000
|
$1,050.000
|
$930.000
|
$952.850
|
$930.000
|
$930.000
|
|
|
REMOVE GROUND BOX
|
EA
|
11.000
|
$100.000
|
$70.000
|
$71.720
|
$70.000
|
$70.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
|
EA
|
2.000
|
$4,750.000
|
$4,350.000
|
$4,456.900
|
$4,350.000
|
$4,350.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
8.000
|
$4,800.000
|
$4,400.000
|
$4,508.130
|
$4,400.000
|
$4,400.000
|
|
|
ELC SRV TY D 120/240 125(NS)GS(N)SP(O)
|
EA
|
2.000
|
$5,000.000
|
$4,000.000
|
$4,098.300
|
$4,000.000
|
$4,000.000
|
|
|
ELC SRV TY D 120/240 200(NS)GS(N)SP(O)
|
EA
|
4.000
|
$5,150.000
|
$4,200.000
|
$4,303.210
|
$4,200.000
|
$4,200.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
124.000
|
$40.000
|
$37.000
|
$37.910
|
$37.000
|
$37.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
2,297.500
|
$21.000
|
$20.000
|
$20.490
|
$20.000
|
$20.000
|
|
|
REFURBISH ALUMINUM SIGNS (TY O)
|
EA
|
4.000
|
$600.000
|
$310.000
|
$317.620
|
$310.000
|
$310.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$460.000
|
$406.480
|
$406.480
|
$406.480
|
$406.480
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
26.000
|
$530.000
|
$555.110
|
$555.110
|
$555.110
|
$555.110
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
6.000
|
$510.000
|
$461.750
|
$461.750
|
$461.750
|
$461.750
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
22.000
|
$700.000
|
$671.340
|
$671.340
|
$671.340
|
$671.340
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
3.000
|
$1,700.000
|
$1,569.000
|
$1,569.000
|
$1,569.000
|
$1,569.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
56.000
|
$75.000
|
$65.000
|
$65.000
|
$65.000
|
$65.000
|
|
|
REMOVE LRSA
|
EA
|
2.000
|
$550.000
|
$530.000
|
$543.030
|
$550.000
|
$530.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
5.000
|
$23,500.000
|
$16,800.000
|
$17,212.860
|
$16,800.000
|
$16,800.000
|
|
|
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
|
EA
|
4.000
|
$13,000.000
|
$12,200.000
|
$12,499.810
|
$12,200.000
|
$12,200.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$3,000.000
|
$1,800.000
|
$1,844.230
|
$1,800.000
|
$1,800.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
9.000
|
$475.000
|
$420.000
|
$430.320
|
$420.000
|
$420.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
80.000
|
$55.000
|
$37.290
|
$37.290
|
$37.290
|
$37.290
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
66.000
|
$70.000
|
$37.750
|
$37.750
|
$37.750
|
$37.750
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
53.000
|
$50.000
|
$40.330
|
$40.330
|
$40.330
|
$40.330
|
|
|
INSTL OM ASSM (OM-3L)(FLX)GND
|
EA
|
18.000
|
$125.000
|
$195.000
|
$195.000
|
$195.000
|
$195.000
|
|
|
INSTL OM ASSM (OM-3R)(FLX)GND
|
EA
|
25.000
|
$125.000
|
$195.000
|
$195.000
|
$195.000
|
$195.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
36,720.000
|
$0.700
|
$0.650
|
$0.650
|
$0.650
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
41,216.000
|
$0.700
|
$0.650
|
$0.650
|
$0.650
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
136,373.000
|
$0.700
|
$0.650
|
$0.650
|
$0.650
|
$0.650
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
21,234.000
|
$0.650
|
$0.600
|
$0.600
|
$0.600
|
$0.600
|
|
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
|
LF
|
5,290.000
|
$2.000
|
$1.470
|
$1.470
|
$1.470
|
$1.470
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
5,666.000
|
$4.000
|
$1.200
|
$1.200
|
$1.200
|
$1.200
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
16.000
|
$85.000
|
$95.000
|
$95.000
|
$95.000
|
$95.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(090MIL)
|
EA
|
3.000
|
$700.000
|
$420.000
|
$420.000
|
$420.000
|
$420.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
16.000
|
$115.000
|
$155.000
|
$155.000
|
$155.000
|
$155.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(090MIL)
|
EA
|
8.000
|
$800.000
|
$755.000
|
$755.000
|
$755.000
|
$755.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
101,762.000
|
$0.550
|
$0.890
|
$0.890
|
$0.890
|
$0.890
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
|
LF
|
115,029.000
|
$0.550
|
$0.890
|
$0.890
|
$0.890
|
$0.890
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
16,161.000
|
$0.550
|
$0.520
|
$0.520
|
$0.520
|
$0.520
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
2,894.000
|
$0.550
|
$0.520
|
$0.520
|
$0.520
|
$0.520
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
58,685.000
|
$7.000
|
$6.770
|
$6.770
|
$6.770
|
$6.770
|
|
REFL PAV MRKR TY I-C
|
EA
|
3,672.000
|
$3.000
|
$3.250
|
$3.250
|
$3.250
|
$3.250
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
5,213.000
|
$3.500
|
$3.250
|
$3.250
|
$3.250
|
$3.250
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
171,475.000
|
$0.180
|
$0.670
|
$0.670
|
$0.180
|
$0.670
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
240.000
|
$130.000
|
$125.000
|
$125.000
|
$135.000
|
$125.000
|
|
|
CONCRETE BEAM REPAIR
|
EA
|
24.000
|
$10,100.000
|
$500.000
|
$1,000.000
|
$1,500.000
|
$2,500.000
|
|
|
NO. OF DAYS MILESTONE 1
|
$/D
|
20,000.000
|
$412.000
|
$341.000
|
$330.000
|
$385.000
|
$345.000
|
|
|
NO. OF DAYS MILESTONE 2
|
$/D
|
5,000.000
|
$506.000
|
$443.000
|
$452.000
|
$492.000
|
$452.000
|
|
|
RAISING AND UNDERSEALING CONCRETE SLAB
|
LB
|
33,080.000
|
$4.500
|
$4.250
|
$4.300
|
$4.500
|
$4.250
|
|
|
REPLACE ELASTOMERIC BEARING PADS
|
EA
|
24.000
|
$1,800.000
|
$500.000
|
$500.000
|
$5,500.000
|
$2,000.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY I)
|
SY
|
470,207.000
|
$0.950
|
$0.750
|
$1.290
|
$0.850
|
$1.100
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
12.000
|
$9,500.000
|
$15,435.000
|
$10,794.990
|
$8,660.000
|
$8,118.750
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
32,855.000
|
$2.500
|
$2.500
|
$2.560
|
$2.500
|
$2.500
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
126,810.000
|
$4.000
|
$3.000
|
$3.070
|
$3.000
|
$3.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
69.000
|
$1,000.000
|
$960.000
|
$983.590
|
$960.000
|
$960.000
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
62.000
|
$6,000.000
|
$4,200.000
|
$4,303.210
|
$4,200.000
|
$4,200.000
|
|
|
ITS GRND MNT CAB (TY 6) (CONF 1)
|
EA
|
14.000
|
$15,000.000
|
$13,000.000
|
$13,319.470
|
$13,000.000
|
$13,000.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
14.000
|
$10,000.000
|
$9,800.000
|
$10,040.830
|
$9,800.000
|
$9,800.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
61,930.000
|
$1.000
|
$1.200
|
$1.230
|
$1.200
|
$1.200
|
|
|
GROUND BOX (PREPARE)
|
EA
|
93.000
|
$250.000
|
$215.000
|
$220.280
|
$215.000
|
$215.000
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
5.000
|
$13,500.000
|
$12,300.000
|
$12,602.270
|
$12,300.000
|
$12,300.000
|
|
|
RADAR VEHICLE SENSING DEVICE
|
EA
|
23.000
|
$7,000.000
|
$7,200.000
|
$7,376.940
|
$7,794.000
|
$7,200.000
|
|
|
ITS POLE (40 FT)(90 MPH)
|
EA
|
14.000
|
$7,500.000
|
$8,100.000
|
$8,299.060
|
$8,100.000
|
$8,100.000
|
|
|
ITS POLE (60 FT)(90 MPH)
|
EA
|
15.000
|
$12,500.000
|
$15,100.000
|
$15,471.080
|
$15,100.000
|
$15,100.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)
|
EA
|
29.000
|
$5,500.000
|
$5,300.000
|
$5,430.250
|
$5,300.000
|
$5,300.000
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
45.000
|
$600.000
|
$710.000
|
$727.450
|
$710.000
|
$710.000
|
|
|
MPEG 4 VIDEO ENCODER (INSTALL ONLY)
|
EA
|
14.000
|
$550.000
|
$680.000
|
$696.710
|
$680.000
|
$680.000
|
|
|
TERMINAL SERVER (INSTALL ONLY)
|
EA
|
28.000
|
$550.000
|
$680.000
|
$696.710
|
$680.000
|
$680.000
|
|
|
WORK ZONE INTELLIGENT TRNSPRTN SYSTEM
|
LS
|
1.000
|
$150,000.000
|
$129,459.420
|
$129,459.420
|
$160,899.550
|
$136,000.000
|
|
|
BLUETOOTH DETECTION SYSTEM
|
EA
|
5.000
|
$8,000.000
|
$1,300.000
|
$1,331.950
|
$1,407.250
|
$1,300.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$11,250.000
|
$5,400.000
|
$32,384.970
|
$14,000.000
|
$14,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
2,000.000
|
$50.000
|
$45.000
|
$73.320
|
$70.000
|
$40.000
|
|
Totals: |
$69,988,410.620
|
$65,209,105.247
|
$67,881,389.910
|
$68,226,924.168
|
$70,666,604.580
|