REMOVING CONC (RIPRAP)
|
SY
|
104.000
|
$50.000
|
$180.000
|
$30.000
|
$50.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
365.000
|
$60.000
|
$120.000
|
$25.000
|
$25.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
12,375.000
|
$2.000
|
$0.300
|
$0.200
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
251.000
|
$14.000
|
$80.000
|
$12.000
|
$25.000
|
|
|
CEM STABIL BKFL
|
CY
|
200.000
|
$200.000
|
$740.000
|
$175.000
|
$200.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
3.000
|
$300.000
|
$838.000
|
$1,000.000
|
$1,000.000
|
|
|
CL C CONC (PILE ENCASEMENT)
|
CY
|
10.800
|
$800.000
|
$3,910.000
|
$5,000.000
|
$3,500.000
|
|
|
CL K CONC (PEDESTAL)
|
EA
|
13.000
|
$2,000.000
|
$3,700.000
|
$2,000.000
|
$3,500.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
994.000
|
$15.000
|
$56.000
|
$15.000
|
$50.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
16.000
|
$250.000
|
$391.000
|
$1,000.000
|
$450.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
896.000
|
$180.000
|
$156.000
|
$800.000
|
$275.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2.000
|
$1,000.000
|
$10,800.000
|
$1,000.000
|
$1,500.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
375.000
|
$200.000
|
$500.000
|
$200.000
|
$200.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
20.000
|
$300.000
|
$168.000
|
$250.000
|
$200.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
50.000
|
$500.000
|
$486.000
|
$1,000.000
|
$650.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
2,624.000
|
$20.000
|
$32.000
|
$60.000
|
$30.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
174.000
|
$10.000
|
$23.000
|
$100.000
|
$20.000
|
|
|
CLEAN & PAINT EXIST STR (SPL PROT SYS)
|
LS
|
1.000
|
$80,000.000
|
$179,600.000
|
$50,000.000
|
$225,000.000
|
|
|
CLEAN & PAINT EXIST PILING (SYSTEM II)
|
LS
|
1.000
|
$42,000.000
|
$220,850.000
|
$100,000.000
|
$275,000.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
864.000
|
$240.000
|
$187.000
|
$300.000
|
$200.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
14.000
|
$350.000
|
$587.000
|
$1,000.000
|
$850.000
|
|
|
JOINT SEALANT
|
LF
|
141.000
|
$15.000
|
$31.500
|
$100.000
|
$20.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
30.000
|
$150.000
|
$430.000
|
$100.000
|
$150.000
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$260,000.000
|
$121,000.000
|
$150,000.000
|
$150,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$198,284.600
|
$105,000.000
|
$300,000.000
|
$125,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$8,000.000
|
$6,500.000
|
$8,000.000
|
$10,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
624.000
|
$24.000
|
$14.550
|
$20.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
624.000
|
$10.000
|
$11.200
|
$15.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,955.000
|
$4.000
|
$2.800
|
$3.500
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,955.000
|
$1.000
|
$1.000
|
$0.500
|
$2.000
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
510.000
|
$45.000
|
$40.000
|
$80.000
|
$40.000
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
510.000
|
$20.000
|
$40.000
|
$15.000
|
$30.000
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
510.000
|
$15.000
|
$40.000
|
$10.000
|
$20.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
675.000
|
$24.000
|
$22.000
|
$50.000
|
$27.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
11.000
|
$1,800.000
|
$1,550.000
|
$2,000.000
|
$2,000.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,100.000
|
$1,000.000
|
$1,000.000
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
706.000
|
$2.500
|
$3.350
|
$5.000
|
$4.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
129.000
|
$250.000
|
$165.000
|
$250.000
|
$200.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
1.000
|
$200.000
|
$165.000
|
$1,000.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,800.000
|
$2,800.000
|
$2,500.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$300.000
|
$325.000
|
$1,000.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
1.000
|
$12,000.000
|
$9,200.000
|
$25,000.000
|
$11,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,800.000
|
$2,400.000
|
$2,500.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,000.000
|
$850.000
|
$2,500.000
|
$1,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
5.000
|
$40.000
|
$15.000
|
$250.000
|
$18.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
8.000
|
$25.000
|
$15.000
|
$250.000
|
$18.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
5.000
|
$40.000
|
$15.000
|
$250.000
|
$18.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
2.000
|
$40.000
|
$15.000
|
$250.000
|
$18.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
1,290.000
|
$1.000
|
$1.150
|
$1.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
5,675.000
|
$1.000
|
$1.000
|
$1.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
7,660.000
|
$1.000
|
$1.000
|
$1.000
|
$2.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
3,000.000
|
$2.000
|
$1.400
|
$1.500
|
$3.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
2,595.000
|
$2.000
|
$1.400
|
$1.000
|
$3.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,550.000
|
$0.600
|
$1.150
|
$0.500
|
$3.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,950.000
|
$0.500
|
$1.100
|
$0.500
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
3,830.000
|
$0.500
|
$1.100
|
$0.500
|
$3.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
78.000
|
$5.000
|
$9.000
|
$5.000
|
$75.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,320.000
|
$0.400
|
$1.700
|
$0.750
|
$1.500
|
|
|
JT / CRCK ROUT / SEAL(RUBBER - ASPHALT)
|
LF
|
209.000
|
$2.000
|
$11.000
|
$250.000
|
$100.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
0.500
|
$12,000.000
|
$97,000.000
|
$40,000.000
|
$5,000.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
70.000
|
$200.000
|
$175.000
|
$250.000
|
$1,000.000
|
|
|
CONCRETE RAIL REPLACEMENT (TYPE 501)
|
LF
|
53.000
|
$1,500.000
|
$765.000
|
$1,000.000
|
$750.000
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
1,034.000
|
$50.000
|
$40.000
|
$100.000
|
$100.000
|
|
|
REP STL BRIDGE MEMBER (BEARINGS)
|
EA
|
141.000
|
$1,400.000
|
$971.000
|
$1,500.000
|
$2,500.000
|
|
|
REP STL BRDG MEMB (DRAIN HOLE RETROFIT)
|
EA
|
56.000
|
$200.000
|
$750.000
|
$800.000
|
$3,000.000
|
|
|
BRIDGE JOINT REPAIR (HEADER)
|
LF
|
205.000
|
$350.000
|
$135.000
|
$250.000
|
$250.000
|
|
|
FRP STRUCTURAL SHAPE (ANGLE)
|
LF
|
48.000
|
$100.000
|
$340.000
|
$250.000
|
$2,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$12,000.000
|
$22,500.000
|
$30,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
4.000
|
$30,000.000
|
$25,000.000
|
$31,500.000
|
$40,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
36.000
|
$150.000
|
$400.000
|
$150.000
|
$200.000
|
|
Totals: |
$2,181,580.600
|
$2,484,393.100
|
$3,214,687.000
|
$3,227,219.500
|