Show Job Controls
Bid Cobra

TRAVIS US 290 (0113-08-090)

Items: 43

County: TRAVIS
Length: N/A
Highway: US 290
District: AUSTIN
Control Number: 0113-08-090
DBE Goal: N/A
Project: NH 2019(297)
Guaranty: N/A
Time: 48 WORKING DAYS
Engineer's Estimate: $2,450,833.84
Date: 12/05/2018 (7 years ago)
Contract Number: N/A
Type: PFC-C OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$2,450,833.84
$2,265,980.67
Over/Under Est: -7.54% -$184,853.17
Over/Under Est: -6.7% -$164,127.10
Amt Left: 0.91% $20,726.07
$2,289,812.04
Over/Under Est: -6.57% -$161,021.80
Amt Left: 1.05% $23,831.37
Delta: -0.14% -$3,105.30
Over/Under Est: 6.08% $148,929.01
Amt Left: 14.73% $333,782.18
Delta: -13.54% -$309,950.81
Over/Under Est: 20.88% $511,769.01
Amt Left: 30.74% $696,622.18
Delta: -13.96% -$362,840.00
Over/Under Est: 22.03% $539,892.37
Amt Left: 31.98% $724,745.54
Delta: -0.95% -$28,123.36

Bid Items & Bid Tabulations

43 Total 0 of 43
TRAVIS  |  US 290  |  AUSTIN  |  0113-08-090  |  12/05/2018  |  $2,450,833.84  |  NH 2019(297)  |  PFC-C OVERLAY  |  48 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
LONE STAR PAVING COMPANY
AUSTIN MATERIALS, LLC
TEXAS MATERIALS GROUP, INC.
CLARK CONSTRUCTION OF TEXAS, INC.
HUNTER INDUSTRIES, LTD.
REMOVING CONCRETE(MOW STRIP)
LF 2,190.000 $9.000 $7.750 $10.000 $7.000 $7.000 $7.350 $9.990
BACKFILL (TY A)
STA 183.000 $125.000 $100.000 $75.000 $100.000 $200.000 $200.000 $176.100
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
TON 620.000 $86.000 $90.000 $130.000 $111.000 $95.000 $252.370 $172.890
PFC (ASPHALT) PG76-22
TON 635.000 $105.000 $106.000 $100.000 $110.000 $116.000 $149.070 $123.780
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 9,944.000 $105.000 $106.000 $100.000 $110.000 $116.000 $149.070 $123.780
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 13,360.000 $35.000 $19.300 $20.500 $21.000 $27.000 $29.250 $36.230
PLANE ASPH CONC PAV (2")
SY 22,435.000 $2.000 $1.800 $1.500 $1.650 $1.500 $2.500 $2.560
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 2,410.000 $3.000 $1.250 $4.000 $2.300 $2.850 $2.500 $4.660
RIPRAP (MOW STRIP)(4 IN)
CY 364.000 $450.000 $455.000 $450.000 $420.000 $420.000 $441.000 $441.020
MOBILIZATION
LS 1.000 $138,600.000 $105,000.000 $175,000.000 $56,000.000 $228,000.000 $125,000.000 $318,090.580
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $3,000.000 $10,000.000 $9,000.000 $30,000.000 $19,000.000 $3,000.000 $1,974.160
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,500.000 $2.500 $2.000 $2.500 $1.900 $1.900 $2.000 $1.900
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,500.000 $0.500 $0.550 $1.500 $0.500 $0.500 $0.530 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 4,150.000 $19.000 $20.500 $30.000 $18.200 $18.200 $19.110 $18.200
MTL W-BEAM GD FEN (STEEL POST)
LF 231.250 $27.500 $44.000 $35.000 $40.100 $40.100 $42.110 $40.100
MTL W-BEAM GD FEN ADJUSTMENT
LF 3,631.250 $15.000 $17.100 $7.500 $15.000 $15.000 $15.750 $15.000
TERMINAL ANCHOR SECTION ADJUSTMENT
EA 11.000 $400.000 $380.000 $350.000 $330.000 $330.000 $346.500 $330.000
SHORT RADIUS
LF 62.500 $30.000 $25.500 $50.000 $22.800 $22.800 $23.940 $22.800
DRIVEWAY TERMINAL ANCHOR SECTION
EA 3.000 $600.000 $700.000 $800.000 $628.000 $628.000 $660.000 $628.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 23.000 $1,100.000 $1,000.000 $1,300.000 $875.000 $875.000 $918.750 $875.000
REMOVE METAL BEAM GUARD FENCE
LF 4,443.750 $1.250 $1.600 $1.500 $1.000 $1.000 $1.050 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 26.000 $140.000 $133.550 $150.000 $100.000 $100.000 $105.000 $100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 21.000 $2,600.000 $2,700.000 $2,700.000 $2,455.000 $2,455.000 $2,577.750 $2,455.000
GUARDRAIL END TREATMENT (REMOVE)
EA 19.000 $220.000 $255.000 $200.000 $185.000 $185.000 $194.250 $185.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 140.000 $16.000 $31.000 $17.000 $14.000 $14.000 $14.700 $14.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,538.000 $0.850 $0.750 $0.450 $1.000 $1.250 $1.000 $1.760
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,804.000 $0.850 $0.750 $0.450 $1.000 $1.250 $1.000 $1.760
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 675.000 $0.800 $0.900 $0.600 $0.550 $0.800 $2.100 $0.580
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 246.000 $2.500 $3.000 $2.750 $2.550 $5.550 $5.250 $2.690
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 180.000 $5.000 $6.750 $6.000 $5.770 $11.100 $10.500 $6.080
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 7.000 $130.000 $146.400 $150.000 $145.000 $205.000 $183.750 $152.750
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
EA 25.000 $175.000 $242.500 $250.000 $240.000 $205.000 $236.250 $252.830
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 7.000 $100.000 $164.550 $200.000 $200.000 $205.000 $194.250 $210.690
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 9,070.000 $0.360 $0.400 $0.300 $0.270 $0.360 $0.420 $0.280
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 9,020.000 $0.350 $0.400 $0.300 $0.250 $0.360 $0.420 $0.260
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 35,928.000 $0.310 $0.400 $0.250 $0.240 $0.360 $0.420 $0.250
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 36,018.000 $0.650 $0.750 $0.700 $0.630 $0.650 $0.890 $0.660
REFL PAV MRKR TY I-C
EA 921.000 $4.000 $3.200 $3.000 $2.880 $3.000 $3.150 $3.030
REFL PAV MRKR TY II-A-A
EA 966.000 $3.500 $3.200 $3.000 $2.880 $4.250 $3.150 $3.030
UNDERSEAL COURSE
GAL 31,345.000 $2.750 $3.000 $2.500 $3.000 $3.350 $2.800 $5.430
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 92.000 $100.000 $80.000 $65.000 $70.000 $80.000 $69.000 $67.660
TMA (STATIONARY)
DAY 12.000 $250.000 $600.000 $200.000 $425.000 $300.000 $400.000 $243.560
TMA (MOBILE OPERATION)
HR 24.000 $100.000 $75.000 $55.000 $60.000 $30.000 $69.000 $59.540
Totals: $2,450,833.842 $2,265,980.675 $2,286,706.750 $2,289,812.045 $2,599,762.855 $2,962,602.872 $2,990,726.215