Show Job Controls
Bid Cobra

TRAVIS SL 275 (0015-11-066)

Items: 77

County: TRAVIS
Length: N/A
Highway: SL 275
District: AUSTIN
Control Number: 0015-11-066
DBE Goal: N/A
Project: STP 2020(620)HES
Guaranty: N/A
Time: 48 WORKING DAYS
Engineer's Estimate: $704,942.96
Date: 03/05/2020 (6 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$704,942.96
Over/Under Est: 23.05% $162,476.04
Over/Under Est: 43.68% $307,922.54
Amt Left: 16.77% $145,446.50
$1,015,171.50
Over/Under Est: 44.01% $310,228.54
Amt Left: 17.03% $147,752.50
Delta: -0.23% -$2,306.00

Bid Items & Bid Tabulations

77 Total 0 of 77
TRAVIS  |  SL 275  |  AUSTIN  |  0015-11-066  |  03/05/2020  |  $704,942.96  |  STP 2020(620)HES  |  HWY IMPRV  |  48 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AARON CONCRETE CONTRACTORS, L.P.
ANGEL BROTHERS HOLDINGS CORP.
AUSTIN MATERIALS, LLC
REMOVING CONC (RIPRAP)
SY 25.000 $100.000 $60.000 $60.000 $70.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 700.000 $3.000 $10.000 $5.000 $14.000
SUBGRADE WIDENING (ORD COMP)
STA 6.000 $400.000 $1,800.000 $1,300.000 $2,350.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 35.000 $10.000 $75.000 $85.000 $175.000
BACKFILL (TY A)
STA 60.000 $410.000 $750.000 $390.000 $750.000
FURNISHING AND PLACING TOPSOIL (4")
SY 360.000 $3.000 $15.000 $4.500 $17.000
DRILL SEEDING (PERM) (URBAN) (CLAY)
SY 360.000 $0.750 $1.500 $1.600 $1.750
PRIME COAT (MULTI OPTION)
GAL 70.000 $4.000 $8.000 $35.000 $11.000
TOM (ASPHALT) PG 76-22
TON 146.000 $124.000 $141.000 $125.000 $128.000
TOM - C (AGGREGATE) SAC - B
TON 2,170.000 $120.000 $141.000 $125.000 $128.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 500.000 $40.000 $45.000 $100.000 $60.000
PLAN & TEXT ASPH CONC PAV(0" TO 1")
SY 3,940.000 $1.300 $6.500 $3.500 $8.000
RIPRAP (CONC)(5 IN)
CY 80.000 $495.000 $720.000 $1,035.000 $900.000
RIPRAP (MOW STRIP)(4 IN)
CY 14.000 $430.000 $460.000 $755.000 $475.000
CMP (GAL STL 24 IN)
LF 15.000 $72.000 $200.000 $300.000 $250.000
MOBILIZATION
LS 1.000 $18,893.210 $80,000.000 $139,000.000 $127,600.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $9,000.000 $10,000.000 $43,000.000 $50,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 400.000 $10.000 $3.300 $3.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 400.000 $5.000 $1.100 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 400.000 $10.000 $4.000 $3.500 $3.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 400.000 $5.000 $1.100 $1.000 $1.000
CONC CURB (TY II)
LF 1,000.000 $25.000 $20.000 $84.000 $35.000
CURB RAMPS (TY 1)
EA 1.000 $1,700.000 $2,400.000 $4,700.000 $3,300.000
MTL W-BEAM GD FEN (TIM POST)
LF 225.000 $21.000 $23.000 $20.000 $24.000
SHORT RADIUS
LF 25.000 $38.000 $27.000 $26.000 $29.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,127.000 $980.000 $1,100.000 $1,050.000
REMOVE METAL BEAM GUARD FENCE
LF 250.000 $2.500 $3.300 $2.000 $3.550
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $320.000 $165.000 $165.000 $175.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,880.000 $3,000.000 $2,800.000 $3,200.000
ALUMINUM SIGNS (TY A)
SF 14.000 $30.000 $40.000 $66.000 $38.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $600.000 $750.000 $576.000 $715.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)SRF
EA 10.000 $112.000 $94.000 $107.000 $90.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 5.000 $22.000 $30.000 $16.950 $28.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 800.000 $1.000 $0.800 $1.000 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,350.000 $1.450 $1.650 $1.000 $1.500
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 325.000 $3.350 $1.100 $1.400 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 610.000 $7.500 $5.500 $7.400 $5.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 12.000 $200.000 $150.000 $100.000 $134.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 8.000 $260.000 $162.000 $120.000 $147.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 350.000 $2.800 $3.000 $4.550 $2.670
REFL PAV MRK TY II (W) 4" (BRK)
LF 3,050.000 $1.000 $0.150 $0.200 $0.120
REFL PAV MRK TY II (W) 4" (SLD)
LF 13,255.000 $1.000 $0.150 $0.250 $0.120
REFL PAV MRK TY II (W) 8" (DOT)
LF 325.000 $1.500 $0.550 $0.700 $0.500
REFL PAV MRK TY II (W) 24" (SLD)
LF 610.000 $4.000 $2.700 $2.000 $2.440
REFL PAV MRK TY II (W) (ARROW)
EA 12.000 $115.000 $70.000 $40.000 $63.000
REFL PAV MRK TY II (W) (WORD)
EA 8.000 $140.000 $70.000 $50.000 $63.000
REFL PAV MRK TY II (Y) 4" (BRK)
LF 10,760.000 $1.000 $0.150 $0.200 $0.120
REFL PAV MRK TY II (Y) 4" (SLD)
LF 12,710.000 $1.000 $0.150 $0.250 $0.120
REFL PAV MRK TY II (Y) 12" (SLD)
LF 350.000 $1.500 $1.650 $1.200 $1.500
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,050.000 $1.000 $0.450 $0.350 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,000.000 $1.000 $0.450 $1.900 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 10,760.000 $1.000 $0.400 $0.350 $0.360
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,040.000 $1.000 $0.450 $1.900 $0.400
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 11,255.000 $2.000 $0.800 $0.570 $0.700
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 11,670.000 $2.000 $0.800 $0.570 $0.700
REFL PAV MRKR TY I-C
EA 70.000 $4.500 $4.400 $2.500 $4.000
REFL PAV MRKR TY II-A-A
EA 290.000 $5.000 $4.400 $5.000 $4.000
VEH SIG SEC (12")LED(GRN)
EA 4.000 $240.000 $380.000 $390.000 $350.000
VEH SIG SEC (12")LED(GRN ARW)
EA 2.000 $240.000 $380.000 $390.000 $350.000
VEH SIG SEC (12")LED(YEL)
EA 4.000 $240.000 $380.000 $390.000 $350.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $240.000 $380.000 $390.000 $350.000
VEH SIG SEC (12")LED(RED)
EA 4.000 $240.000 $380.000 $390.000 $350.000
VEH SIG SEC (12")LED(RED ARW)
EA 2.000 $240.000 $380.000 $390.000 $350.000
BACK PLATE (12")(3 SEC)
EA 4.000 $85.000 $135.000 $130.000 $100.000
BACK PLATE (12")(5 SEC)
EA 2.000 $120.000 $145.000 $160.000 $150.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 665.000 $1.700 $2.300 $4.750 $4.500
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 440.000 $2.000 $2.500 $5.000 $5.500
REMOVAL OF SIGNAL HEAD ASSM
EA 3.000 $160.000 $330.000 $240.000 $135.000
REMOVAL OF SIGNAL RELATED SIGNS
EA 2.000 $50.000 $320.000 $160.000 $70.000
D-GR HMA TY-B PG64-22
TON 210.000 $65.000 $150.000 $140.000 $200.000
TACK COAT
GAL 40.000 $2.500 $11.000 $3.500 $2.550
UNDERSEAL COURSE
GAL 8,095.000 $3.500 $4.300 $3.800 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 48.000 $130.000 $82.000 $180.000 $135.000
RADAR COMMUNICATION CABLE
LF 600.000 $4.500 $7.000 $4.100 $4.250
TMA (STATIONARY)
DAY 48.000 $210.000 $480.000 $250.000 $275.000
TMA (MOBILE OPERATION)
DAY 25.000 $340.000 $815.000 $300.000 $750.000
RVDS(PRESENCE DETECTION ONLY)
EA 4.000 $6,000.000 $6,500.000 $6,950.000 $7,000.000
Totals: $704,942.960 $867,419.000 $1,012,865.500 $1,015,171.500