Show Job Controls
Bid Cobra

TOM GREEN SH0208 (6437-35-001)

Items: 56

County: TOM GREEN
Length: N/A
Highway: SH0208
District: SAN ANGELO
Control Number: 6437-35-001
DBE Goal: N/A
Project: RMC - 643735001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $749,311.00
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$749,311.00
$661,351.45
Over/Under Est: -11.74% -$87,959.55
$664,837.50
Over/Under Est: -11.27% -$84,473.50
Amt Left: 0.53% $3,486.05
$729,732.50
Over/Under Est: -2.61% -$19,578.50
Amt Left: 10.34% $68,381.05
Delta: -9.76% -$64,895.00

Bid Items & Bid Tabulations

56 Total 0 of 56
TOM GREEN  |  SH0208  |  SAN ANGELO  |  6437-35-001  |  04/05/2023  |  $749,311.00  |  RMC - 643735001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HJC FARMS, INC.
NIXON ENGINEERING
E.V.G. ENTERPRISE
REMOVING CONC (RIPRAP)
SY 60.000 $50.000 $1.000 $50.000 $10.000
RIPRAP (CONC)(4 IN)
CY 20.000 $600.000 $250.000 $100.000 $600.000
MOBILIZATION (CALLOUT)
EA 12.000 $1,500.000 $300.000 $1.000 $2,000.000
MTL W-BEAM GD FEN (STEEL POST)
LF 400.000 $120.000 $30.000 $33.000 $50.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,500.000 $1.000 $500.000 $1,500.000
MTL BM GD FEN TRANS (31"-28")
EA 24.000 $820.000 $1,100.000 $250.000 $70.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $5.000 $0.500 $5.000 $15.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $650.000 $1.000 $100.000 $5,000.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 2.000 $2,850.000 $1.000 $100.000 $5,000.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 3,600.000 $28.000 $26.750 $30.000 $25.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $38.000 $32.750 $10.000 $20.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $48.000 $35.250 $10.000 $20.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 125.000 $34.000 $32.750 $1.000 $20.000
REM / REPL TIMBER POST W / O CONC FND
EA 60.000 $230.000 $75.000 $90.000 $20.000
REM / REPL STEEL POST W / O CONC FND
EA 320.000 $76.000 $125.000 $40.000 $90.000
REM / REPL TIMBER POST W / CONC FND
EA 10.000 $140.000 $30.000 $100.000 $20.000
REM / REPL STEEL POST W / CONC FND
EA 60.000 $106.000 $100.000 $50.000 $80.000
REPAIR STEEL POST WITH BASE PLATE
EA 2.000 $180.000 $200.000 $100.000 $200.000
REALIGN POSTS
EA 180.000 $30.000 $20.000 $20.000 $40.000
REMOVE & REPLACE BLOCKOUT
EA 440.000 $66.000 $20.000 $1.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 200.000 $36.000 $32.250 $30.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 4.000 $86.000 $300.000 $100.000 $100.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 4.000 $42.000 $1.000 $100.000 $100.000
REPLACE TERMINAL ANCHOR POSTS
EA 8.000 $132.000 $1.000 $100.000 $135.000
REPLACE HINGED TOP SGT STEEL POST
EA 16.000 $296.000 $60.000 $10.000 $60.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 60.000 $3,800.000 $4,775.000 $4,500.000 $3,750.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 8.000 $1,030.000 $1,100.000 $1,000.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 16.000 $154.000 $500.000 $500.000 $500.000
REPLACE SGT CABLE ASSEMBLY
EA 8.000 $64.000 $50.000 $1.000 $80.000
REPLACE SGT CABLE ANCHOR
EA 4.000 $60.000 $50.000 $1.000 $70.000
REPLACE SGT STRUT
EA 2.000 $62.000 $50.000 $1.000 $70.000
REPLACE SGT OBJECT MARKER
EA 4.000 $30.000 $50.000 $1.000 $25.000
REMOVE AND REPLACE LONG SPAN CRT POST
EA 2.000 $50.000 $1.000 $55.000 $120.000
REPAIR MTL BM GD FEN(LONG SPAN SYS)
LF 100.000 $24.000 $1.000 $15.000 $22.000
REPLACE POSTS (TL-4)
EA 320.000 $176.000 $237.210 $188.000 $185.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 4.000 $260.000 $1.000 $100.000 $100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 8.000 $1,220.000 $1.000 $1.000 $2,500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 8.000 $1,560.000 $250.000 $250.000 $2,500.000
REPLACE CABLE (TL-3)
LF 200.000 $8.500 $1.000 $1.000 $1.000
REPLACE CABLE (TL-4)
LF 80.000 $24.000 $1.000 $15.000 $1.000
CHECK / RE-TENSION CABLE
EA 200.000 $220.000 $100.000 $1.000 $10.000
REPLACE POST HARDWARE (TL-4)
EA 240.000 $28.000 $50.000 $40.000 $80.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 400.000 $20.000 $1.000 $15.000 $100.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 4.000 $66.000 $1.000 $50.000 $40.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 4.000 $160.000 $1.000 $50.000 $75.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 800.000 $8.750 $1.000 $2.000 $20.000
REPAIR (TRACC)
LF 21.250 $200.000 $1.000 $1.000 $100.000
REPAIR (WIDE TRACC)
LF 21.250 $100.000 $1.000 $1.000 $150.000
REPAIR (QUAD) (N) (BAY)
EA 4.000 $1,460.000 $1,000.000 $1,000.000 $1,800.000
REPAIR (QUAD) (W) (BAY)
EA 4.000 $1,460.000 $1.000 $100.000 $1,800.000
REPAIR (GREAT SYS) (BAY)
EA 4.000 $100.000 $1.000 $1.000 $1,450.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 25.000 $32.000 $1.000 $1.000 $100.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 25.000 $32.000 $1.000 $1.000 $100.000
REP METAL POST W/ BASE PLATE(T101 RAIL)
EA 4.000 $66.000 $1.000 $1.000 $220.000
REP METAL POST W/ BASE PLATE (T6 RAIL)
EA 4.000 $96.000 $1.000 $1.000 $220.000
TMA (STATIONARY)
DAY 80.000 $250.000 $250.000 $1,500.000 $300.000
Totals: $749,311.000 $661,351.450 $664,837.500 $729,732.500