Show Job Controls
Bid Cobra

TOM GREEN GR (0907-24-056)

Items: 37

County: TOM GREEN
Length: N/A
Highway: GR
District: SAN ANGELO
Control Number: 0907-24-056
DBE Goal: 0.0%
Project: STP 2024(718)HESG
Guaranty: N/A
Time: 51 WORKING DAYS
Engineer's Estimate: $251,645.91
Date: 08/01/2024 (1 year ago)
Contract Number: N/A
Type: OFF SYSTEM SIGNAL SYSTEM UPGRADES
Mail/Deliver Bids To: N/A
CHUKWUMA OSEMEKE
JESSE MENDOZA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$251,645.91
1
Awarded
$273,114.60
Over/Under Est: 8.53% $21,468.69
Over/Under Est: 16.81% $42,309.09
Amt Left: 7.63% $20,840.40
Over/Under Est: 51.1% $128,585.94
Amt Left: 39.22% $107,117.25
Delta: -29.35% -$86,276.85
Subcontractor Percentage Amount
CONCRETE CONNECTION, LLC 19.15% $52,301.45
TRP CONSTRUCTION GROUP, LLC 4.39% $11,989.73
BARRICADES UNLIMITED 2.28% $6,227.01
Total: 25.82% $70,518.19

Bid Items & Bid Tabulations

37 Total 0 of 37
TOM GREEN  |  GR  |  SAN ANGELO  |  0907-24-056  |  08/01/2024  |  $251,645.91  |  STP 2024(718)HESG  |  OFF SYSTEM SIGNAL SYSTEM UPGRADES  |  51 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
YUNEX LLC
E-Z BEL CONSTRUCTION, LLC
AMERICAN LIGHTING AND SIGNALIZATION, LLC
REMOVING CONC (FOUNDATIONS)
SY 2.000 $406.100 $1,250.000 $3,500.000 $464.400
MOBILIZATION
LS 1.000 $13,610.490 $32,762.500 $29,000.000 $93,878.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $13,978.470 $17,635.000 $12,000.000 $5,885.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 40.000 $13.100 $6.100 $10.000 $8.420
BIODEG EROSN CONT LOGS (REMOVE)
LF 40.000 $2.720 $2.400 $2.000 $4.020
CONC CURB (TY II)
LF 20.000 $59.150 $250.000 $250.000 $107.000
CONC CURB & GUTTER (TY II)
LF 11.000 $180.780 $250.000 $450.000 $171.850
CONC SIDEWALKS (6")
SY 27.000 $160.500 $375.000 $225.000 $321.000
CURB RAMPS (TY 5)
EA 1.000 $4,543.250 $8,750.000 $6,500.000 $5,617.500
CURB RAMPS (TY 7)
EA 4.000 $4,742.200 $7,500.000 $5,000.000 $4,815.000
CONDT (PVC) (SCH 80) (3")
LF 70.000 $32.750 $44.000 $85.000 $40.610
ELEC CONDR (NO.6) BARE
LF 70.000 $3.240 $3.700 $20.000 $4.040
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $885.230 $1,185.900 $1,500.000 $1,623.600
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 405.000 $16.990 $16.300 $25.000 $16.050
PAVEMENT SEALER 24"
LF 405.000 $3.560 $8.800 $10.000 $5.350
ELIM EXT PAV MRK & MRKS (4")
LF 60.000 $1.870 $3.800 $25.000 $2.680
ELIM EXT PAV MRK & MRKS (24")
LF 30.000 $8.290 $8.800 $50.000 $8.560
PAV SURF PREP FOR MRK (24")
LF 405.000 $2.520 $8.800 $10.000 $3.210
REMOVING TRAFFIC SIGNALS
EA 1.000 $18,312.480 $5,477.100 $8,000.000 $23,238.000
INSTALL HWY TRF SIG (UPGRADE)
EA 2.000 $35,697.500 $20,521.300 $31,000.000 $59,736.000
VEH SIG SEC (12")LED(GRN)
EA 4.000 $378.030 $444.200 $875.000 $540.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $531.120 $444.200 $875.000 $540.000
VEH SIG SEC (12")LED(YEL)
EA 4.000 $505.070 $444.200 $875.000 $540.000
VEH SIG SEC (12")LED(YEL ARW)
EA 8.000 $531.120 $444.200 $875.000 $540.000
VEH SIG SEC (12")LED(RED)
EA 4.000 $500.000 $444.200 $875.000 $540.000
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $531.130 $444.200 $875.000 $540.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 175.000 $2.620 $4.400 $15.000 $7.920
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 625.000 $4.000 $4.700 $5.000 $14.350
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 425.000 $5.240 $6.700 $5.000 $16.420
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 470.000 $3.930 $3.800 $5.000 $6.400
PED POLE ASSEMBLY
EA 1.000 $6,639.080 $3,769.600 $4,500.000 $8,000.000
RELOCATE PED POLE ASSEMBLY
EA 2.000 $4,585.000 $4,883.400 $3,000.000 $4,200.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 15.000 $107.040 $272.100 $300.000 $82.400
CONDUIT (PREPARE)
LF 220.000 $5.720 $6.000 $10.000 $11.800
GROUND BOX (PREPARE)
EA 4.000 $698.320 $410.000 $900.000 $787.800
CAT 5 ETHERNET CABLE
LF 40.000 $12.000 $7.800 $40.000 $17.430
TMA (STATIONARY)
DAY 13.000 $294.910 $262.500 $750.000 $494.400
Totals: $251,645.910 $273,114.600 $293,955.000 $380,231.850