County: TOM GREEN Highway: GR Date: 08/01/2024 (3 months ago) Engineer's Estimate: $251,646 Control Number: 0907-24-056
Project: STP 2024(718)HESG District: SAN ANGELO Time: 51 WORKING DAYS Type: OFF SYSTEM SIGNAL SYSTEM UPGRADES
Bidder's List
Informational:

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $251,645.91
YUNEX LLC   $273,114.60 1
8.53% | $21,468.69
E-Z BEL CONSTRUCTION, LLC   $293,955.00 2
16.81% | $42,309.09
7.63% | $20,840.40
AMERICAN LIGHTING AND SIGNALIZATION, LLC   $380,231.85 3
51.1% | $128,585.94
39.22% | $107,117.25
29.35% | $86,276.85

Bid Items

Items: 37, 0 filtered
TOM GREEN GR  |  SAN ANGELO  |  0907-24-056  |  08/01/2024  |  $251,646  |  STP 2024(718)HESG  |  OFF SYSTEM SIGNAL SYSTEM UPGRADES  |  51 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate YUNEX LLC E-Z BEL CONSTRUCTION, LLC AMERICAN LIGHTING AND SIGNALIZATION, LLC
104 6013 REMOVING CONC (FOUNDATIONS) SY 2.000 $406.100 $1,250.000 $3,500.000 $464.400
500 6001 MOBILIZATION LS 1.000 $13,610.490 $32,762.500 $29,000.000 $93,878.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 $13,978.470 $17,635.000 $12,000.000 $5,885.000
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 40.000 $13.100 $6.100 $10.000 $8.420
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 40.000 $2.720 $2.400 $2.000 $4.020
529 6002 CONC CURB (TY II) LF 20.000 $59.150 $250.000 $250.000 $107.000
529 6008 CONC CURB & GUTTER (TY II) LF 11.000 $180.780 $250.000 $450.000 $171.850
531 6003 CONC SIDEWALKS (6") SY 27.000 $160.500 $375.000 $225.000 $321.000
531 6008 CURB RAMPS (TY 5) EA 1.000 $4,543.250 $8,750.000 $6,500.000 $5,617.500
531 6010 CURB RAMPS (TY 7) EA 4.000 $4,742.200 $7,500.000 $5,000.000 $4,815.000
618 6053 CONDT (PVC) (SCH 80) (3") LF 70.000 $32.750 $44.000 $85.000 $40.610
620 6009 ELEC CONDR (NO.6) BARE LF 70.000 $3.240 $3.700 $20.000 $4.040
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 1.000 $885.230 $1,185.900 $1,500.000 $1,623.600
666 6047 REFL PAV MRK TY I (W)24"(SLD)(090MIL) LF 405.000 $16.990 $16.300 $25.000 $16.050
666 6230 PAVEMENT SEALER 24" LF 405.000 $3.560 $8.800 $10.000 $5.350
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 60.000 $1.870 $3.800 $25.000 $2.680
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 30.000 $8.290 $8.800 $50.000 $8.560
678 6008 PAV SURF PREP FOR MRK (24") LF 405.000 $2.520 $8.800 $10.000 $3.210
680 6004 REMOVING TRAFFIC SIGNALS EA 1.000 $18,312.480 $5,477.100 $8,000.000 $23,238.000
680 6011 INSTALL HWY TRF SIG (UPGRADE) EA 2.000 $35,697.500 $20,521.300 $31,000.000 $59,736.000
682 6001 VEH SIG SEC (12")LED(GRN) EA 4.000 $378.030 $444.200 $875.000 $540.000
682 6002 VEH SIG SEC (12")LED(GRN ARW) EA 4.000 $531.120 $444.200 $875.000 $540.000
682 6003 VEH SIG SEC (12")LED(YEL) EA 4.000 $505.070 $444.200 $875.000 $540.000
682 6004 VEH SIG SEC (12")LED(YEL ARW) EA 8.000 $531.120 $444.200 $875.000 $540.000
682 6005 VEH SIG SEC (12")LED(RED) EA 4.000 $500.000 $444.200 $875.000 $540.000
682 6006 VEH SIG SEC (12")LED(RED ARW) EA 4.000 $531.130 $444.200 $875.000 $540.000
684 6031 TRF SIG CBL (TY A)(14 AWG)(5 CONDR) LF 175.000 $2.620 $4.400 $15.000 $7.920
684 6033 TRF SIG CBL (TY A)(14 AWG)(7 CONDR) LF 625.000 $4.000 $4.700 $5.000 $14.350
684 6036 TRF SIG CBL (TY A)(14 AWG)(10 CONDR) LF 425.000 $5.240 $6.700 $5.000 $16.420
684 6079 TRF SIG CBL (TY C)(12 AWG)(2 CONDR) LF 470.000 $3.930 $3.800 $5.000 $6.400
687 6001 PED POLE ASSEMBLY EA 1.000 $6,639.080 $3,769.600 $4,500.000 $8,000.000
687 6003 RELOCATE PED POLE ASSEMBLY EA 2.000 $4,585.000 $4,883.400 $3,000.000 $4,200.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 15.000 $107.040 $272.100 $300.000 $82.400
6027 6003 CONDUIT (PREPARE) LF 220.000 $5.720 $6.000 $10.000 $11.800
6027 6008 GROUND BOX (PREPARE) EA 4.000 $698.320 $410.000 $900.000 $787.800
6089 6002 CAT 5 ETHERNET CABLE LF 40.000 $12.000 $7.800 $40.000 $17.430
6185 6002 TMA (STATIONARY) DAY 13.000 $294.910 $262.500 $750.000 $494.400
Totals: $251,645.91 $273,114.60 $293,955.00 $380,231.85