Show Job Controls
Bid Cobra

TOM GREEN VA (0907-00-237)

Items: 37

County: TOM GREEN
Length: N/A
Highway: VA
District: SAN ANGELO
Control Number: 0907-00-237
DBE Goal: 0.0%
Project: F 2B24(368)
Guaranty: N/A
Time: 140 WORKING DAYS
Engineer's Estimate: $2,657,355.80
Date: 08/01/2024 (1 year ago)
Contract Number: N/A
Type: TRAFFIC SURVEILLANCE
Mail/Deliver Bids To: N/A
CHUKWUMA OSEMEKE
JESSE MENDOZA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,657,355.80
Over/Under Est: 5.62% $149,362.64
Over/Under Est: 57.51% $1,528,199.20
Amt Left: 49.13% $1,378,836.56
$5,608,347.25
Over/Under Est: 111.05% $2,950,991.45
Amt Left: 99.82% $2,801,628.81
Delta: -33.99% -$1,422,792.25
Subcontractor Percentage Amount
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 5.03% $146,391.54
RAYRAY UNDERGROUND LLC 2.05% $59,662.56
FC TRAFFIC CONTROL, INC. 0.24% $6,984.88
Total: 7.32% $213,038.98

Bid Items & Bid Tabulations

37 Total 0 of 37
TOM GREEN  |  VA  |  SAN ANGELO  |  0907-00-237  |  08/01/2024  |  $2,657,355.80  |  F 2B24(368)  |  TRAF SURVEILLANCE  |  140 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AMERICAN LIGHTING AND SIGNALIZATION, LLC
E-Z BEL CONSTRUCTION, LLC
MICA CORPORATION
PREPARING ROW
AC 1.300 $10,000.000 $6,972.690 $24,000.000 $53,600.000
DRILL SHAFT (48 IN)
LF 247.000 $704.000 $829.180 $925.000 $1,042.000
DRILL SHAFT (54 IN)
LF 40.000 $900.000 $829.500 $1,100.000 $1,173.000
RIPRAP (CONC)(CL B)
CY 58.000 $800.000 $883.840 $1,000.000 $6,595.000
RIPRAP (MOW STRIP)(4 IN)
CY 175.000 $705.000 $780.940 $650.000 $892.000
MOBILIZATION
LS 1.000 $241,577.800 $247,200.000 $418,000.000 $467,800.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $7,000.000 $5,500.000 $16,000.000 $61,365.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 920.000 $7.300 $6.250 $7.000 $36.100
BIODEG EROSN CONT LOGS (REMOVE)
LF 920.000 $1.700 $3.120 $2.000 $5.650
MTL W-BEAM GD FEN (STEEL POST)
LF 2,800.000 $32.000 $34.100 $32.000 $40.350
MTL BEAM GD FEN TRANS (T101)
EA 1.000 $1,750.000 $2,200.000 $2,500.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 9.000 $1,600.000 $1,870.000 $1,800.000 $2,120.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $500.000 $550.000 $750.000 $460.000
RM MTL BM GD FEN TRANS (T101)
EA 1.000 $300.000 $550.000 $750.000 $460.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $3,400.000 $4,070.000 $4,000.000 $4,900.000
CONDT (PVC) (SCH 80) (2")
LF 2,625.000 $24.000 $24.500 $35.000 $44.050
CONDT (PVC) (SCH 80) (2") (BORE)
LF 745.000 $32.000 $38.500 $125.000 $74.800
CONDT (PVC) (SCH 80) (2") (BORE)(ROCK)
LF 340.000 $40.000 $66.000 $265.000 $97.800
CONDT (PVC) (SCH 80) (2") (ROCK)
LF 3,210.000 $26.000 $34.680 $65.000 $53.900
CONDT (RM) (2")
LF 790.000 $54.000 $49.910 $50.000 $65.200
ELEC CONDR (NO.14) INSULATED
LF 3,325.000 $1.500 $2.840 $2.000 $2.600
ELEC CONDR (NO.6) BARE
LF 3,300.000 $2.250 $3.210 $2.000 $3.150
ELEC CONDR (NO.6) INSULATED
LF 6,600.000 $2.500 $3.820 $2.750 $3.350
GROUND BOX TY D (162922)W/APRON
EA 61.000 $1,500.000 $2,152.940 $2,100.000 $3,745.000
TIMBER POLE (CL 2) 30 FT
EA 18.000 $1,500.000 $1,921.670 $6,000.000 $4,180.000
TIMBER POLE (CL 2) 25 FT
EA 10.000 $1,250.000 $1,791.000 $6,000.000 $3,995.000
ELC SRV TY D 120/240 060(NS)GS(N)SP(O)
EA 15.000 $5,275.000 $9,724.800 $10,000.000 $10,355.000
INS OH SN SUP(30 FT BAL TEE)
EA 13.000 $51,000.000 $54,367.850 $65,000.000 $52,725.000
INS OH SN SUP(35 FT BAL TEE)
EA 2.000 $60,000.000 $61,992.000 $70,000.000 $59,150.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 40.000 $30.000 $33.000 $125.000 $44.300
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 28.000 $2,000.000 $1,362.340 $6,000.000 $6,520.000
CONDUIT (PREPARE)
LF 175.000 $4.500 $7.440 $12.000 $11.200
GROUND BOX (PREPARE)
EA 8.000 $450.000 $559.200 $250.000 $1,510.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 20.000 $17,500.000 $14,808.000 $34,000.000 $60,830.000
TMA (STATIONARY)
DAY 336.000 $250.000 $249.600 $325.000 $601.250
INST OF FIELD HARDENED ETHERNET SWITCH
EA 15.000 $2,500.000 $506.400 $1,800.000 $2,140.000
INSTALLATION OF CELLULAR MODEM
EA 15.000 $2,200.000 $627.600 $1,000.000 $2,375.000
Totals: $2,657,355.800 $2,806,718.447 $4,185,555.000 $5,608,347.250