TOM GREEN VA (0907-00-170)

Items: 102

County: TOM GREEN
Length: N/A
Highway: VA
District: SAN ANGELO
Control Number: 0907-00-170
DBE Goal: N/A
Project: STP 1802(384)
Guaranty: N/A
Time: 412 WORKING DAYS
Engineer's Estimate: $8,633,138.74
Date: 07/11/2018 (7 years ago)
Contract Number: N/A
Type: BRIDGE SAFETY IMPROVEMENTS AND MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$8,633,138.74
1
$6,779,028.06
Over/Under Est: -21.48% -$1,854,110.68
$9,531,220.75
Over/Under Est: 10.4% $898,082.01
Amt Left: 40.6% $2,752,192.69
Over/Under Est: 14.48% $1,250,435.91
Amt Left: 45.8% $3,104,546.59
Delta: -3.70% -$352,353.90

Bid Items & Bid Tabulations

102 Total 0 of 102
TOM GREEN  |  VA  |  SAN ANGELO  |  0907-00-170  |  07/11/2018  |  $8,633,138.74  |  STP 1802(384)  |  BRIDGE SAFETY IMPRVS AND MAINT  |  412 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
GILVIN-TERRILL, LTD.
SCR CIVIL CONSTRUCTION, LLC
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 6.000 $225.000 $500.000 $1,000.000 $800.000
REMOVING CONC (CURB)
LF 18.000 $1.000 $25.000 $50.000 $100.000
REMOVING CONC (MISC)
SY 8.000 $1.000 $25.000 $310.000 $600.000
REMOVING CONCRETE(MOW STRIP)
LF 200.000 $10.000 $10.750 $15.000 $40.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 130.000 $18.180 $30.000 $70.000 $71.000
FURNISHING AND PLACING TOPSOIL (3")
SY 379.300 $1.250 $5.000 $5.000 $5.500
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 379.300 $0.200 $5.000 $5.000 $1.350
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
TON 3,369.000 $111.000 $125.000 $110.000 $365.000
PLAN & TEXT ASPH CONC PAV(0" TO 3")
SY 19,064.000 $2.500 $12.000 $7.000 $9.200
FLOWABLE BACKFILL
CY 3.000 $300.000 $800.000 $1,000.000 $2,100.000
TEMPORARY SPL SHORING
SF 586.000 $30.000 $40.000 $260.000 $295.000
CL A CONC (FLUME)
CY 3.000 $750.000 $1,235.000 $1,200.000 $1,700.000
CL C CONC (CRASHWALL)
CY 384.800 $1,200.000 $735.800 $1,700.000 $1,100.000
CL C CONC (COLLAR)
EA 4.000 $800.000 $1,417.000 $1,200.000 $1,500.000
CL C CONC (VEH DEFL WALL)
CY 899.900 $1,460.000 $967.480 $1,700.000 $1,400.000
SILICONE RESIN PAINT FINISH
SF 300.000 $6.000 $13.730 $20.000 $15.000
EPOXY WATERPROOF FINISH
SF 1,760.000 $5.000 $13.720 $15.000 $15.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 39.000 $13.000 $40.000 $50.000 $42.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 765.000 $200.000 $25.000 $200.000 $60.000
CONC STR REPAIR (EPOXY MORTAR)
SF 35.000 $180.000 $25.000 $200.000 $120.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 15.000 $125.000 $200.000 $200.000 $400.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 258.000 $150.000 $200.000 $200.000 $230.000
CONC STR REPAIR (STANDARD)
SF 7.000 $150.000 $300.000 $200.000 $500.000
RIPRAP (CONC)(5 IN)
CY 14.400 $700.000 $600.000 $1,200.000 $1,200.000
RIPRAP (MOW STRIP)(4 IN)
CY 16.800 $1,500.000 $600.000 $1,200.000 $2,000.000
CLEANING AND SEALING EXISTING JOINTS
LF 1,520.000 $24.000 $71.500 $50.000 $32.000
CLEANING AND SEALING EXIST JOINTS(CL5)
LF 319.000 $25.000 $37.400 $50.000 $43.000
CLEAN AND PAINT EXIST STR (REF NO. 1)
EA 1.000 $100,000.000 $73,860.020 $100,000.000 $76,750.000
CLEAN AND PAINT EXIST STR (REF NO. 2)
EA 1.000 $100,000.000 $73,860.020 $100,000.000 $76,750.000
CLEAN AND PAINT EXIST STR (REF NO. 3)
EA 1.000 $100,000.000 $101,186.520 $150,000.000 $105,200.000
CLEAN AND PAINT EXIST STR (REF NO. 4)
EA 1.000 $100,000.000 $169,180.270 $200,000.000 $175,800.000
CLEAN AND PAINT EXIST STR (REF NO. 5)
EA 1.000 $100,000.000 $40,120.070 $75,000.000 $41,700.000
RAIL (HANDRAIL)(TY E)
LF 25.000 $95.000 $205.000 $150.000 $355.000
RETROFIT RAIL (TY T221)
LF 8,052.000 $230.000 $115.000 $185.000 $188.000
RETROFIT RAIL (TY SSTR)
LF 963.640 $230.000 $115.000 $185.000 $270.000
CMP AR (GAL STL DES 7)
LF 97.000 $350.000 $131.820 $200.000 $270.000
SET (REPLACE PIPE RUNNER ASSEMBLY)
EA 1.000 $2,000.000 $3,844.100 $2,000.000 $1,500.000
SET (REPLACE PIPE RUNNER)
EA 11.000 $1,000.000 $754.000 $1,000.000 $1,800.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(3:1) (C)
EA 8.000 $4,200.000 $5,358.600 $5,000.000 $10,900.000
SET (TY II) (DES 7) (CMP) (6: 1) (P)
EA 4.000 $4,567.890 $6,526.000 $5,000.000 $5,000.000
CLEAN EXIST CULVERTS
EA 1.000 $2,400.000 $6,000.000 $10,000.000 $6,000.000
MOBILIZATION
LS 1.000 $783,000.000 $585,000.000 $950,000.000 $850,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $4,500.000 $12,500.000 $12,500.000 $17,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 128.000 $15.000 $20.000 $10.000 $17.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 128.000 $15.000 $10.000 $5.000 $6.000
PTB (FUR & INST)(STEEL)
LF 1,020.000 $200.000 $185.000 $150.000 $200.000
PTB (MOVE)(STEEL)
LF 6,990.000 $25.000 $15.000 $15.000 $30.000
PTB (STKPL)(STEEL)
LF 1,020.000 $25.000 $15.000 $15.000 $60.000
MTL W-BEAM GD FEN (STEEL POST)
LF 9,900.000 $25.000 $23.110 $23.250 $24.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 60.000 $2,200.000 $1,666.250 $1,900.000 $2,100.000
TRANSITION ADJUSTMENT
EA 3.000 $500.000 $806.250 $1,250.000 $840.000
SHORT RADIUS
LF 75.000 $30.000 $24.720 $25.250 $26.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 16.000 $1,000.000 $1,064.250 $1,440.000 $1,110.000
MTL BM GD FEN TRANS (NON - SYM)
EA 9.000 $850.000 $623.500 $1,030.000 $650.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $1,160.000 $1,128.750 $1,450.000 $1,175.000
REMOVE METAL BEAM GUARD FENCE
LF 13,925.000 $2.500 $1.880 $2.250 $2.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $270.000 $188.120 $475.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 71.000 $2,400.000 $2,633.750 $2,700.000 $2,750.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 40.000 $2,000.000 $1,500.000 $1,500.000 $800.000
CRASH CUSH ATTEN (STKPL)
EA 6.000 $800.000 $1,500.000 $1,500.000 $2,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 15.000 $23,000.000 $26,000.000 $17,500.000 $27,600.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 2.000 $30,000.000 $26,000.000 $30,000.000 $34,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $11,000.000 $8,500.000 $8,000.000 $9,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $555.000 $1,075.000 $1,000.000 $1,500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 9.000 $30.000 $19.350 $25.000 $22.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 392.000 $30.000 $20.420 $25.000 $22.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 328.000 $30.000 $20.420 $25.000 $22.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
EA 66.000 $30.000 $21.500 $25.000 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 9.000 $30.000 $19.350 $25.000 $22.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
EA 35.000 $30.000 $21.500 $25.000 $25.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 16.000 $93.580 $59.120 $70.000 $80.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 33,800.000 $0.870 $0.960 $0.900 $1.050
WK ZN PAV MRK REMOV (W)4"(SLD W/MRKR)
LF 99,680.000 $0.870 $0.960 $0.900 $1.050
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 368.000 $40.000 $26.870 $25.000 $28.000
WK ZN PAV MRK REMOV (Y)4"(SLD W/MRKR)
LF 46,312.000 $1.000 $0.960 $0.900 $1.050
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 689.000 $1.000 $4.300 $1.500 $2.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 434.000 $9.000 $5.640 $5.250 $6.000
REFL PAV MRK TY II (W) 4" (BRK)
LF 20,820.000 $1.000 $0.210 $0.200 $0.250
REFL PAV MRK TY II (W) 4" (SLD)
LF 69,215.000 $1.000 $0.210 $0.200 $0.250
REFL PAV MRK TY II (W) 24" (SLD)
LF 434.000 $1.000 $0.210 $0.200 $0.250
REFL PAV MRK TY II (Y) 4" (BRK)
LF 1,440.000 $1.000 $0.210 $0.200 $0.250
REFL PAV MRK TY II (Y) 4" (SLD)
LF 34,620.000 $1.000 $0.210 $0.200 $0.250
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 10,800.000 $1.000 $0.340 $0.320 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 68,915.000 $1.000 $0.340 $0.320 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 1,440.000 $1.100 $0.340 $0.320 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 40,730.000 $1.000 $0.340 $0.320 $0.400
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 23.000 $31.000 $64.760 $60.250 $68.000
REFL PAV MRKR TY II-A-A
EA 357.000 $5.000 $4.080 $3.800 $4.250
REFL PAV MRKR TY II-C-R
EA 1,069.000 $5.000 $4.080 $3.800 $4.250
ELIM EXT PAV MRK & MRKS (4")
LF 31,560.000 $0.530 $1.120 $1.050 $1.200
JT / CRCK SEAL (HOT - POURED RUBBER)
LF 108.000 $3.050 $13.430 $50.000 $10.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 5.000 $16.000 $537.500 $200.000 $670.000
REP METAL POST W/ BASE PLATE(C201 RAIL)
EA 1.000 $1,400.000 $2,500.000 $1,000.000 $4,000.000
REPAIR (EXISTING METAL PED. RAIL)
LF 5.000 $44.440 $300.000 $150.000 $1,000.000
CONCRETE RAIL REPLACEMENT (TYPE 501)
LF 9.500 $1,000.000 $200.000 $450.000 $1,360.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 50.000 $34.560 $100.000 $30.000 $93.000
CARBON FIBER REINF POLYMER PROTECTION
SF 231.000 $28.220 $25.000 $300.000 $76.000
REPLACE ELASTOMERIC BEARING PADS
EA 22.000 $700.000 $800.000 $1,000.000 $3,300.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 12.000 $100.000 $300.000 $125.000 $350.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $10,360.000 $16,000.000 $15,000.000 $29,500.000
TMA (STATIONARY)
DAY 2,599.000 $140.000 $100.000 $300.000 $90.000
TMA (MOBILE OPERATION)
HR 140.000 $40.000 $100.000 $37.500 $107.000
Totals: $8,633,138.745 $6,779,028.062 $9,531,220.750 $9,883,574.655