Show Job Controls
Bid Cobra

TOM GREEN SL 306 (0264-07-032)

Items: 65

County: TOM GREEN
Length: N/A
Highway: SL 306
District: SAN ANGELO
Control Number: 0264-07-032
DBE Goal: N/A
Project: STP 1802(195)
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $4,252,182.28
Date: 06/05/2018 (8 years ago)
Contract Number: N/A
Type: ACP OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$4,252,182.28
$4,500,317.86
Over/Under Est: 5.84% $248,135.58
$5,569,986.56
Over/Under Est: 30.99% $1,317,804.28
Amt Left: 23.77% $1,069,668.70

Bid Items & Bid Tabulations

65 Total 0 of 65
TOM GREEN  |  SL 306  |  SAN ANGELO  |  0264-07-032  |  06/05/2018  |  $4,252,182.28  |  STP 1802(195)  |  ACP OVERLAY  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REECE ALBERT, INC.
RK HALL, LLC
REMOVING CONCRETE(MOW STRIP)
LF 3,542.000 $12.000 $4.690 $13.200
BACKFILL (TY A OR B)
STA 307.400 $130.000 $96.880 $175.120
PROOF ROLLING
HR 49.100 $75.000 $63.100 $104.070
REWORK BS MTL (TY B) (6") (ORD COMP)
SY 2,951.000 $1.400 $13.120 $24.220
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 118,579.000 $0.520 $0.330 $0.950
PRIME COAT(MC-30 OR AE-P)
GAL 25,899.000 $3.250 $4.310 $4.710
EMULS ASPH (EROSN CONT)(MULTI)
GAL 4,588.000 $2.900 $4.940 $3.900
AGGR(TY-PD GR-4 SAC-B)
CY 2,254.000 $90.000 $110.200 $141.590
ASPH (AC-20-5TR OR AC-20XP)
GAL 99,112.000 $2.000 $3.590 $3.640
LRA PAV TY-I GR-D
TON 198.000 $120.000 $163.280 $212.670
HMCL ACP TY-C AC-1.5
TON 332.000 $85.000 $164.580 $186.680
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
TON 30,024.000 $73.000 $88.710 $96.960
PLANE ASPH CONC PAV(0" TO 2")
SY 9,573.000 $2.500 $2.830 $3.440
PLANE ASPH CONC PAV(0" TO 3")
SY 1,862.000 $2.000 $3.420 $3.460
PLANE ASPH CONC PAV (3")
SY 112,030.000 $2.500 $1.390 $1.600
PLANE ASPH CONC PAV (4")
SY 6,549.000 $7.500 $2.980 $3.600
RIPRAP (MOW STRIP)(4 IN)
CY 190.000 $550.000 $651.090 $715.000
CLEANING EXISTING JOINTS
LF 1,872.000 $10.000 $12.670 $13.750
MOBILIZATION
LS 1.000 $285,033.000 $69,025.000 $350,147.990
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $14,000.000 $6,637.170 $15,000.000
RUMBLE STRIPS (SHOULDER)
LF 57,017.000 $0.200 $0.180 $0.130
MTL W-BEAM GD FEN (STEEL POST)
LF 3,425.000 $25.000 $24.540 $26.950
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $2,200.000 $2,203.690 $2,420.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,000.000 $1,101.850 $1,210.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $800.000 $801.350 $880.000
REMOVE METAL BEAM GUARD FENCE
LF 3,400.000 $2.550 $3.260 $3.580
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $390.000 $325.550 $357.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 10.000 $210.000 $325.550 $357.500
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $2,450.000 $2,704.530 $2,970.000
GUARDRAIL END TREATMENT (REMOVE)
EA 14.000 $360.000 $325.550 $357.500
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
EA 106.000 $20.000 $20.030 $22.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
EA 125.000 $20.000 $20.030 $22.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 22,786.000 $1.200 $0.200 $0.990
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 11,400.000 $2.000 $0.200 $0.990
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 16,614.000 $0.980 $1.770 $1.930
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 400.000 $2.000 $1.810 $1.930
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 14,914.000 $0.400 $0.640 $0.700
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 354.000 $4.800 $5.070 $5.010
REFL PAV MRK TY I (Y)8"(SLD)(090MIL)
LF 597.000 $0.100 $0.710 $0.700
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
LF 42.000 $5.600 $8.110 $5.010
REFL PAV MRK TY II (W) 4" (BRK)
LF 35,010.000 $0.120 $0.100 $0.150
REFL PAV MRK TY II (W) 4" (SLD)
LF 108,653.000 $0.100 $0.100 $0.150
REFL PAV MRK TY II (W) 8" (SLD)
LF 32,439.000 $0.420 $0.370 $0.310
REFL PAV MRK TY II (W) 24" (SLD)
LF 1,062.000 $3.000 $2.360 $0.920
REFL PAV MRK TY II (Y) 4" (SLD)
LF 151,710.000 $0.240 $0.100 $0.150
REFL PAV MRK TY II (Y) 8" (SLD)
LF 1,791.000 $0.250 $0.370 $0.310
REFL PAV MRK TY II (Y) 24" (SLD)
LF 42.000 $3.000 $2.360 $0.920
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 15,280.000 $0.350 $0.270 $0.350
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 54,837.000 $0.300 $0.270 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 65,386.000 $0.300 $0.270 $0.350
PREFAB PAV MRK TY C (W) (ARROW)
EA 11.000 $200.000 $190.500 $467.500
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 2.000 $300.000 $452.950 $891.000
PREFAB PAV MRK TY C (W) (WORD)
EA 13.000 $300.000 $205.700 $671.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 82.000 $27.000 $33.440 $58.300
REFL PAV MRKR TY I-A
EA 8.000 $25.000 $8.110 $3.630
REFL PAV MRKR TY I-C
EA 343.000 $2.800 $3.040 $3.630
REFL PAV MRKR TY II-A-A
EA 621.000 $2.500 $3.040 $3.630
REFL PAV MRKR TY II-C-R
EA 1,783.000 $3.500 $3.040 $3.630
ELIM EXT PAV MRK & MRKS (4")
LF 50,680.000 $1.200 $0.280 $1.130
ELIM EXT PAV MRK & MRKS (8")
LF 9,760.000 $0.650 $0.850 $1.650
CLEANING / SWEEPING (SPOT)
MI 1.000 $200.000 $2,134.310 $21,458.150
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 180.000 $95.000 $45.450 $106.980
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 196.000 $65.000 $80.130 $88.000
TMA (STATIONARY)
DAY 120.000 $225.000 $255.590 $288.360
TMA (MOBILE OPERATION)
HR 360.000 $40.000 $39.520 $104.500
Totals: $4,252,182.280 $4,500,317.862 $5,569,986.575