TITUS US 271 (0221-05-090)

Items: 35

County: TITUS
Length: N/A
Highway: US 271
District: ATLANTA
Control Number: 0221-05-090
DBE Goal: N/A
Project: STP 2018(646)
Guaranty: N/A
Time: 64 WORKING DAYS
Engineer's Estimate: $2,616,224.44
Date: 03/06/2018 (8 years ago)
Contract Number: N/A
Type: PLANE ACP, ACP SURF, & PAV MARK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,616,224.44
1
$2,501,081.88
Over/Under Est: -4.4% -$115,142.56
Over/Under Est: 2.06% $53,886.42
Amt Left: 6.76% $169,028.98
Over/Under Est: 7.81% $204,304.40
Amt Left: 12.77% $319,446.96
Delta: -5.63% -$150,417.98

Bid Items & Bid Tabulations

35 Total 0 of 35
TITUS  |  US 271  |  ATLANTA  |  0221-05-090  |  03/06/2018  |  $2,616,224.44  |  STP 2018(646)  |  PLANE ACP, ACP SURF, & PAV MARK  |  64 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
EAST TEXAS BRIDGE, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
REMOVING CONCRETE(MOW STRIP)
LF 674.000 $8.000 $6.500 $10.000 $14.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 1,494.000 $1.000 $2.100 $2.000 $2.000
VEGETATIVE WATERING
MG 24.000 $12.000 $80.000 $20.000 $15.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 12,364.000 $130.000 $132.500 $135.000 $145.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 678.000 $80.000 $120.000 $70.000 $110.000
PLANE ASPH CONC PAV (2")
SY 17,905.000 $2.000 $2.100 $1.500 $1.600
PLANE ASPH CONC PAV (3")
SY 94,494.000 $2.500 $2.100 $1.750 $1.650
RIPRAP (MOW STRIP)(4 IN)
CY 203.200 $500.000 $500.000 $450.000 $515.000
MOBILIZATION
LS 1.000 $264,000.000 $50,000.000 $200,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $2,500.000 $2,000.000 $15,000.000 $3,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 500.000 $3.000 $9.000 $4.000 $3.850
TEMP SEDMT CONT FENCE (REMOVE)
LF 500.000 $1.000 $3.500 $1.000 $1.650
TURNOUTS (ACP)
SY 640.000 $60.000 $50.000 $85.000 $30.000
RUMBLE STRIPS (SHOULDER)
LF 61,409.000 $0.160 $0.150 $0.400 $0.120
RUMBLE STRIPS (CENTERLINE)
LF 29,172.000 $0.180 $0.200 $0.400 $0.220
MTL W-BEAM GD FEN (TIM POST)
LF 3,150.000 $18.500 $19.550 $22.000 $18.750
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $75.000 $83.950 $70.000 $80.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,650.000 $1,397.250 $1,500.000 $1,335.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 75.000 $30.000 $28.180 $35.000 $27.000
REMOVE METAL BEAM GUARD FENCE
LF 2,725.000 $2.500 $2.300 $3.000 $2.200
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $325.000 $172.500 $250.000 $165.000
GUARDRAIL END TREATMENT (REMOVE)
EA 24.000 $300.000 $172.500 $250.000 $165.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 24.000 $2,350.000 $2,587.500 $2,500.000 $2,475.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 21.000 $225.000 $334.950 $300.000 $320.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 7.000 $245.000 $352.510 $400.000 $335.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 3.000 $600.000 $697.490 $500.000 $670.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 56.000 $30.000 $27.600 $40.000 $88.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 29,199.000 $1.000 $1.400 $0.500 $0.440
REFL PAV MRKR TY II-A-A
EA 758.000 $3.500 $3.740 $4.000 $3.600
BONDING COURSESE
GAL 12,364.000 $2.000 $5.000 $4.000 $3.500
REFL PAV MRK AWT (W) 4" (SLD) (100MIL)
LF 64,922.000 $0.270 $0.440 $0.420 $0.420
REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)
LF 44,326.000 $0.300 $0.440 $0.420 $0.420
REFL PAV MRK AWT (Y) 4" (BRK) (100MIL)
LF 4,040.000 $0.370 $0.440 $0.420 $0.420
TMA (STATIONARY)
EA 4.000 $500.000 $620.000 $4,000.000 $20,000.000
TMA (MOBILE OPERATION)
HR 64.000 $15.000 $85.000 $100.000 $165.000
Totals: $2,616,224.440 $2,501,081.880 $2,670,110.860 $2,820,528.840