Job Info for 0284-02-027

County: THROCKMORTON Highway: SH 79 Date: 01/04/2024 (10 months ago) Engineer's Estimate: $6,978,676 Control Number: 0284-02-027
Project: C 284-2-27 District: WICHITA FALLS Time: 178 WORKING DAYS Type: WIDEN ROAD - ADD SHOULDERS
Bidder's List
Informational:
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $6,978,676.15
A. L. HELMCAMP, INC.   $7,882,206.69 1
12.95% | $903,530.54
DUININCK, INC.   $8,012,951.19 2
14.82% | $1,034,275.04
1.66% | $130,744.50
ZACK BURKETT CO.   $9,036,989.11 3
29.49% | $2,058,312.96
14.65% | $1,154,782.42
12.78% | $1,024,037.92
Subcontractor Percentage Amount
W. S. CONSTRUCTION COMPANY 2.10% $165,526.34
HJC FARMS, INC. 1.33% $104,833.35
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.75% $59,116.55
FLAT LINE, INC. 0.73% $57,540.11
MARCOMS CONSTRUCTION LLC 0.41% $32,317.05
FC TRAFFIC CONTROL, INC. 0.22% $17,340.85
PROFESSIONAL TRAFFIC CONTROL LLC 0.17% $13,399.75
MOBILE ENTERPRISES, INC. 0.11% $8,670.43
Total: 5.82% $458,744.43

Bid Items

Items: 60, 0 filtered
THROCKMORTON SH 79  |  WICHITA FALLS  |  0284-02-027  |  01/04/2024  |  $6,978,676  |  C 284-2-27  |  WIDEN ROAD - ADD SHOULDERS  |  178 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate A. L. HELMCAMP, INC. DUININCK, INC. ZACK BURKETT CO.
110 6001 EXCAVATION (ROADWAY) CY 6,392.000 $20.000 $30.000 $26.000 $28.700
110 6002 EXCAVATION (CHANNEL) CY 36.000 $50.000 $100.000 $54.500 $250.000
132 6004 EMBANKMENT (FINAL)(DENS CONT)(TY B) CY 6,491.000 $38.000 $65.000 $51.000 $62.700
134 6004 BACKFILL (TY A OR B) STA 10.000 $445.000 $550.000 $485.000 $750.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 57,501.000 $0.120 $0.120 $0.130 $0.140
164 6011 BROADCAST SEED (TEMP) (COOL) SY 57,501.000 $0.120 $0.120 $0.140 $0.150
164 6033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY 115,000.000 $0.140 $0.110 $0.120 $0.130
168 6001 VEGETATIVE WATERING MG 924.000 $30.000 $20.000 $27.000 $35.000
275 6001 CEMENT TON 831.000 $277.500 $290.000 $315.000 $354.000
275 6019 CEMENT TREAT (SUBGRADE)(6") SY 76,467.000 $5.000 $3.400 $5.400 $9.860
310 6009 PRIME COAT (MC-30) GAL 18,080.000 $5.000 $6.000 $5.150 $6.600
314 6010 EMULS ASPH (EROSN CONT)(SS-1) GAL 23,000.000 $4.500 $4.500 $4.050 $4.000
351 6004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 5,000.000 $80.000 $75.000 $83.000 $80.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 3,361.000 $5.000 $7.000 $8.850 $7.500
354 6030 PLANE ASPH CONC PAV(0" TO 8") SY 1,493.000 $8.000 $10.000 $13.500 $12.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 64.000 $700.000 $800.000 $925.000 $1,053.000
438 6006 CLEANING AND SEALING JOINTS (CL 3) LF 200.000 $54.000 $76.000 $48.000 $120.500
451 6019 RETROFIT RAIL (TY T631) LF 212.000 $120.000 $152.000 $160.000 $169.650
460 6002 CMP (GAL STL 18 IN) LF 552.000 $100.000 $94.000 $110.000 $87.750
467 6348 SET (TY II) (18 IN) (CMP) (6: 1) (P) EA 32.000 $1,700.000 $1,250.000 $1,600.000 $1,872.000
480 6001 CLEAN EXIST CULVERTS EA 6.000 $2,500.000 $1,650.000 $2,700.000 $5,000.000
496 6004 REMOV STR (SET) EA 4.000 $1,000.000 $650.000 $1,100.000 $351.000
496 6007 REMOV STR (PIPE) LF 552.000 $15.000 $30.000 $13.000 $15.250
500 6001 MOBILIZATION LS 1.000 $629,949.880 $590,000.000 $775,000.000 $705,335.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 11.000 $4,500.000 $10,500.000 $28,500.000 $24,979.500
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 3,100.000 $3.500 $3.100 $3.250 $3.510
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 3,100.000 $1.250 $0.920 $0.980 $1.050
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 5,400.000 $4.750 $3.100 $3.250 $3.510
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 5,400.000 $1.000 $0.820 $0.870 $1.000
530 6005 DRIVEWAYS (ACP) SY 957.000 $50.000 $69.000 $42.500 $94.150
530 6016 DRIVEWAYS (BASE) SY 2,526.000 $25.000 $25.000 $23.000 $40.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 69,400.000 $0.150 $0.210 $0.100 $0.270
533 6002 RUMBLE STRIPS (CENTERLINE) LF 34,700.000 $0.300 $0.320 $0.140 $0.270
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 462.500 $25.000 $29.000 $30.500 $32.760
540 6014 SHORT RADIUS LF 25.000 $55.330 $38.000 $38.500 $41.540
540 6015 DRIVEWAY TERMINAL ANCHOR SECTION EA 1.000 $1,093.670 $1,400.000 $1,400.000 $1,521.000
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 100.000 $101.000 $75.000 $76.000 $81.900
540 6033 MTL BM GD FEN (LONG SPAN SYSTEM) EA 2.000 $1,200.000 $1,800.000 $1,800.000 $1,959.750
542 6001 REMOVE METAL BEAM GUARD FENCE LF 411.000 $5.000 $3.200 $3.250 $3.510
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 6.000 $261.200 $320.000 $325.000 $351.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 11.000 $3,100.000 $3,500.000 $3,600.000 $3,890.250
560 6004 MAILBOX INSTALL-S (TWG-POST) TY 2 EA 1.000 $450.000 $290.000 $300.000 $409.500
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 4.000 $500.000 $690.000 $705.000 $965.250
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 3.000 $685.000 $750.000 $780.000 $1,140.750
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 6.000 $785.000 $890.000 $925.000 $1,316.250
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 36.000 $350.000 $520.000 $535.000 $760.500
644 6076 REMOVE SM RD SN SUP&AM EA 49.000 $183.000 $110.000 $110.000 $117.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 27.000 $50.830 $39.000 $40.500 $43.290
662 6110 WK ZN PAV MRK SHT TERM (TAB)TY Y EA 1,726.000 $2.000 $1.900 $1.550 $1.200
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 71,112.000 $0.500 $0.550 $0.570 $0.810
666 6318 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 7,790.000 $0.500 $0.550 $0.570 $0.810
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 23,439.000 $0.500 $0.550 $0.570 $0.810
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 84.000 $20.000 $21.000 $22.000 $23.400
672 6009 REFL PAV MRKR TY II-A-A EA 668.000 $4.000 $5.250 $5.450 $5.850
3076 6001 D-GR HMA TY-B PG64-22 TON 19,985.000 $100.000 $120.000 $109.200 $120.000
3076 6046 D-GR HMA TY-D SAC-B PG70-28 TON 17,447.000 $108.000 $125.000 $120.000 $130.000
3076 6047 D-GR HMA TY-D PG70-28 (LEVEL-UP) TON 250.000 $135.000 $210.000 $210.000 $178.500
3084 6001 BONDING COURSE GAL 18,380.000 $4.000 $4.500 $1.000 $5.500
6185 6002 TMA (STATIONARY) DAY 330.000 $204.000 $260.000 $325.000 $367.000
6185 6005 TMA (MOBILE OPERATION) DAY 20.000 $850.000 $260.000 $1,200.000 $1.000
Totals: $6,978,676.15 $7,882,206.69 $8,012,951.19 $9,036,989.11