REMOVING CONCRETE(MOW STRIP)
|
LF
|
629.000
|
$20.000
|
$8.100
|
$60.000
|
$55.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,866.000
|
$20.000
|
$21.000
|
$12.000
|
$4.500
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
10.000
|
$50.000
|
$50.500
|
$200.000
|
$500.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
10,596.000
|
$25.000
|
$38.500
|
$40.000
|
$22.000
|
|
|
BACKFILL (TY A)
|
STA
|
17.000
|
$150.000
|
$445.000
|
$2,500.000
|
$1,500.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
64,013.000
|
$0.120
|
$0.120
|
$0.130
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
64,013.000
|
$0.120
|
$0.130
|
$0.140
|
$1.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
128,025.000
|
$0.140
|
$0.110
|
$0.120
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,088.000
|
$30.000
|
$29.000
|
$5.000
|
$550.000
|
|
|
CEMENT
|
TON
|
929.000
|
$220.000
|
$280.000
|
$275.000
|
$350.000
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
85,344.000
|
$4.000
|
$5.200
|
$4.000
|
$8.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
21,344.000
|
$4.500
|
$4.950
|
$12.000
|
$8.500
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
9,100.000
|
$4.500
|
$4.250
|
$4.000
|
$10.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
1,925.000
|
$50.000
|
$37.000
|
$45.000
|
$130.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
4,881.000
|
$4.000
|
$4.350
|
$6.000
|
$8.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
3.100
|
$1,500.000
|
$810.000
|
$840.000
|
$900.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
56.000
|
$660.000
|
$860.000
|
$892.500
|
$1,200.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
55.000
|
$95.000
|
$100.000
|
$105.000
|
$150.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
167.000
|
$99.000
|
$120.000
|
$126.000
|
$175.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
34.000
|
$107.000
|
$150.000
|
$157.500
|
$275.000
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
52.000
|
$131.000
|
$165.000
|
$173.250
|
$300.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$10,000.000
|
$30,500.000
|
$31,500.000
|
$4,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,400.000
|
$1,700.000
|
$1,732.500
|
$3,000.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (C)
|
EA
|
1.000
|
$3,370.000
|
$1,800.000
|
$1,890.000
|
$4,000.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
12.000
|
$1,850.000
|
$2,300.000
|
$2,362.500
|
$4,500.000
|
|
|
SET (TY II) (30 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$3,150.000
|
$3,500.000
|
$3,675.000
|
$4,800.000
|
|
|
SET (TY II) (36 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$7,500.000
|
$4,600.000
|
$4,725.000
|
$5,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
12.000
|
$4,000.000
|
$2,500.000
|
$2,887.500
|
$2,800.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$1,500.000
|
$1,000.000
|
$1,050.000
|
$6,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$2,500.000
|
$1,500.000
|
$1,575.000
|
$5,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
308.000
|
$32.000
|
$15.000
|
$15.750
|
$55.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$692,666.960
|
$780,000.000
|
$750,000.000
|
$500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$4,500.000
|
$20,000.000
|
$10,000.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
170.000
|
$32.000
|
$49.500
|
$30.000
|
$33.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
170.000
|
$11.000
|
$25.500
|
$20.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,220.000
|
$3.500
|
$3.800
|
$3.150
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,220.000
|
$1.250
|
$1.250
|
$1.050
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
7,410.000
|
$4.750
|
$4.200
|
$3.150
|
$9.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
7,410.000
|
$1.000
|
$1.000
|
$0.950
|
$4.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
783.000
|
$50.000
|
$42.000
|
$80.000
|
$50.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
585.000
|
$38.000
|
$50.000
|
$80.000
|
$50.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
4,582.000
|
$21.000
|
$18.500
|
$40.000
|
$20.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
74,828.000
|
$0.200
|
$0.100
|
$0.290
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
37,414.000
|
$0.400
|
$0.160
|
$0.420
|
$0.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
550.000
|
$25.000
|
$21.500
|
$22.050
|
$105.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$2,100.000
|
$1,884.750
|
$2,500.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$2,000.000
|
$1,200.000
|
$1,260.000
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
350.000
|
$4.000
|
$4.050
|
$4.200
|
$40.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$350.000
|
$405.000
|
$420.000
|
$1,200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,400.000
|
$2,900.000
|
$2,992.500
|
$2,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$322.000
|
$405.000
|
$420.000
|
$500.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
5.000
|
$450.000
|
$295.000
|
$300.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$500.000
|
$605.000
|
$630.000
|
$250.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$685.000
|
$660.000
|
$680.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
8.000
|
$785.000
|
$710.000
|
$750.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
11.000
|
$940.000
|
$760.000
|
$790.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$850.000
|
$910.000
|
$950.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
3.000
|
$685.000
|
$1,300.000
|
$1,300.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
2.000
|
$785.000
|
$1,300.000
|
$1,365.000
|
$1,800.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
38.000
|
$350.000
|
$505.000
|
$525.000
|
$1,800.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
5.000
|
$375.000
|
$535.000
|
$560.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
71.000
|
$100.000
|
$100.000
|
$105.000
|
$650.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
15.000
|
$47.000
|
$32.500
|
$34.000
|
$150.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
19.000
|
$200.000
|
$100.000
|
$105.000
|
$80.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
3,117.000
|
$2.000
|
$1.350
|
$1.000
|
$1.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
82,000.000
|
$0.500
|
$0.510
|
$0.530
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
8,335.000
|
$0.500
|
$0.510
|
$0.530
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
22,528.000
|
$0.500
|
$0.510
|
$0.530
|
$1.500
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
60.000
|
$20.000
|
$12.000
|
$12.600
|
$10.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
712.000
|
$4.000
|
$4.300
|
$4.460
|
$6.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
0.250
|
$20,000.000
|
$40,500.000
|
$21,000.000
|
$50,000.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
22,377.000
|
$100.000
|
$95.500
|
$110.000
|
$225.000
|
|
|
D-GR HMA TY-D SAC-B PG70-28
|
TON
|
20,210.000
|
$120.000
|
$106.500
|
$117.000
|
$225.000
|
|
|
D-GR HMA TY-D PG70-28 (LEVEL-UP)
|
TON
|
2,124.000
|
$115.000
|
$135.000
|
$135.000
|
$225.000
|
|
|
BONDING COURSE
|
GAL
|
22,457.000
|
$3.750
|
$3.800
|
$4.000
|
$12.000
|
|
|
TMA (STATIONARY)
|
DAY
|
400.000
|
$150.000
|
$200.000
|
$400.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$200.000
|
$1,000.000
|
$700.000
|
$1,500.000
|
|
Totals: |
$7,682,336.530
|
$7,963,304.670
|
$8,656,903.920
|
$14,909,725.400
|