TERRY US0062 (6448-07-001)

Items: 39

County: TERRY
Length: N/A
Highway: US0062
District: LUBBOCK
Control Number: 6448-07-001
DBE Goal: N/A
Project: RMC - 644807001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $447,750.00
Date: 09/06/2023 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
MIKE STROOPE
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$447,750.00
$363,640.00
Over/Under Est: -18.79% -$84,110.00
$369,170.00
Over/Under Est: -17.55% -$78,580.00
Amt Left: 1.52% $5,530.00
Over/Under Est: -3.97% -$17,760.00
Amt Left: 18.25% $66,350.00
Delta: -16.47% -$60,820.00
Over/Under Est: 0.62% $2,770.00
Amt Left: 23.89% $86,880.00
Delta: -4.77% -$20,530.00

Bid Items & Bid Tabulations

39 Total 0 of 39
TERRY  |  US0062  |  LUBBOCK  |  6448-07-001  |  09/06/2023  |  $447,750.00  |  RMC - 644807001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROSS SA ENTERPRISE LLC
E.V.G. ENTERPRISE
BARRICADES UNLIMITED
ICOS MANAGEMENT, LLC
MOBILIZATION (CALLOUT)
EA 10.000 $100.000 $1.000 $1.000 $150.000 $98.000
MOBILIZATION (EMERGENCY)
EA 10.000 $100.000 $1.000 $1.000 $150.000 $1.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,500.000 $55.000 $30.000 $26.000 $30.000 $25.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,000.000 $1,500.000 $1,000.000 $100.000 $1,350.000
MTL BM GD FEN TRANS (31"-28")
EA 20.000 $500.000 $200.000 $100.000 $450.000 $562.500
REMOVE METAL BEAM GUARD FENCE
LF 2,500.000 $1.000 $1.000 $5.000 $0.500 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $250.000 $500.000 $500.000 $10.000 $127.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $250.000 $500.000 $10.000 $10.000 $59.000
GUARDRAIL END TREATMENT (INSTALL)
EA 15.000 $3,000.000 $4,500.000 $3,000.000 $3,500.000 $2,550.000
GUARDRAIL END TREATMENT (REMOVE)
EA 15.000 $500.000 $500.000 $1,000.000 $100.000 $240.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 100.000 $20.000 $1.000 $10.000 $40.000 $19.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 100.000 $20.000 $1.000 $10.000 $5.000 $13.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 100.000 $20.000 $1.000 $10.000 $5.000 $19.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 100.000 $20.000 $1.000 $10.000 $5.000 $30.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,000.000 $20.000 $40.000 $15.000 $25.000 $23.000
REM / REPL TIMBER POST W / O CONC FND
EA 250.000 $75.000 $100.000 $100.000 $55.000 $70.000
REM / REPL STEEL POST W / O CONC FND
EA 250.000 $75.000 $1.000 $80.000 $120.000 $45.000
REM / REPL TIMBER POST W / CONC FND
EA 250.000 $75.000 $1.000 $100.000 $1.000 $65.000
REM / REPL STEEL POST W / CONC FND
EA 250.000 $75.000 $1.000 $80.000 $1.000 $79.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $500.000 $100.000 $10.000 $1.000 $150.000
REALIGN POSTS
EA 100.000 $25.000 $20.000 $100.000 $50.000 $18.500
REMOVE & REPLACE BLOCKOUT
EA 100.000 $25.000 $255.000 $250.000 $0.250 $38.500
REM & RESET SGT IMPACT HEAD
EA 10.000 $500.000 $200.000 $100.000 $0.250 $95.000
REPLACE SGT OBJECT MARKER
EA 10.000 $200.000 $1.000 $10.000 $0.250 $33.500
REMOVE AND REPLACE DAT
EA 10.000 $1,250.000 $1,000.000 $20.000 $1,000.000 $1,200.000
REPLACE POSTS (TL-3)
EA 50.000 $200.000 $200.000 $200.000 $90.000 $89.000
REPLACE POSTS (TL-4)
EA 50.000 $200.000 $250.000 $200.000 $125.000 $143.500
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 5.000 $150.000 $100.000 $100.000 $10.000 $117.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $150.000 $100.000 $100.000 $10.000 $225.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 5.000 $300.000 $1.000 $100.000 $500.000 $62.500
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $300.000 $1.000 $100.000 $500.000 $40.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 5.000 $2,000.000 $1,150.000 $2,000.000 $2,500.000 $318.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 5.000 $2,000.000 $1,350.000 $2,000.000 $3,500.000 $608.000
REPLACE CABLE (TL-3)
LF 1,000.000 $2.500 $3.500 $1.000 $10.000 $2.000
REPLACE CABLE (TL-4)
LF 1,000.000 $2.500 $3.250 $1.000 $10.000 $3.000
CHECK / RE-TENSION CABLE
EA 25.000 $500.000 $100.000 $100.000 $10.000 $187.000
REPLACE POST HARDWARE (TL-4)
EA 25.000 $25.000 $50.000 $300.000 $125.000 $28.000
REPLACE POST HARDWARE (TL-3)
EA 25.000 $25.000 $50.000 $300.000 $125.000 $20.500
TMA (STATIONARY)
DAY 200.000 $100.000 $1.000 $1.000 $500.000 $750.000
Totals: $447,750.000 $363,640.000 $369,170.000 $429,990.000 $450,520.000