Show Job Controls
Bid Cobra

TERRY US0062 (6368-23-001)

Items: 40

County: TERRY
Length: N/A
Highway: US0062
District: LUBBOCK
Control Number: 6368-23-001
DBE Goal: N/A
Project: RMC - 636823001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $253,655.00
Date: 10/02/2020 (5 years ago)
Contract Number: N/A
Type: CAL-OUT MBGF REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$253,655.00
$217,955.00
Over/Under Est: -14.07% -$35,700.00
Over/Under Est: -8.77% -$22,235.00
Amt Left: 6.18% $13,465.00
Over/Under Est: -7.52% -$19,065.00
Amt Left: 7.63% $16,635.00
Delta: -1.37% -$3,170.00
Over/Under Est: 33.05% $83,831.00
Amt Left: 54.84% $119,531.00
Delta: -43.86% -$102,896.00

Bid Items & Bid Tabulations

40 Total 0 of 40
TERRY  |  US0062  |  LUBBOCK  |  6368-23-001  |  10/02/2020  |  $253,655.00  |  RMC - 636823001  |  CAL-OUT MBGF REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T&L CLEANING SERVICES LLC
BK FIELD OPERATIONS LLC
BARRICADES UNLIMITED
BT CONSTRUCTORS, LLC
REMOVING CONC (MISC)
SY 100.000 $75.000 $75.000 $50.000 $40.000 $28.000
RIPRAP (CONC)(4 IN)
CY 16.000 $650.000 $200.000 $400.000 $400.000 $500.000
MOBILIZATION (CALLOUT)
EA 10.000 $2,100.000 $100.000 $1.000 $2,100.000 $1,000.000
MOBILIZATION (EMERGENCY)
EA 20.000 $1,500.000 $100.000 $1.000 $1,500.000 $1,700.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,000.000 $18.000 $25.000 $25.000 $16.000 $35.000
MTL THRIE-BEAM GD FEN (STEEL POST)
LF 150.000 $22.000 $22.000 $60.000 $16.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $22.000 $22.000 $150.000 $16.000 $1,200.000
MTL BEAM GD FEN TRANS (TL2)
EA 2.000 $100.000 $100.000 $100.000 $100.000 $650.000
MTL BEAM GD FEN TRANS (T101)
EA 2.000 $100.000 $100.000 $500.000 $100.000 $600.000
MTL BEAM GD FEN TRANS (T6)
EA 2.000 $100.000 $100.000 $350.000 $100.000 $300.000
SHORT RADIUS
LF 150.000 $20.000 $20.000 $25.000 $7.600 $40.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,000.000 $1,000.000 $1,100.000 $1,000.000 $1,200.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $10.000 $10.000 $18.000 $10.000 $15.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 100.000 $15.000 $15.000 $80.000 $15.000 $45.000
MTL BEAM GD FEN TRANS(THRIE BEAM)28"
EA 5.000 $500.000 $500.000 $150.000 $100.000 $1,200.000
MTL BEAM GD FEN TRANS (TL2) 28"
EA 5.000 $600.000 $600.000 $500.000 $100.000 $450.000
MTL BM GD FEN TRANS (31"-28")
EA 20.000 $500.000 $150.000 $650.000 $400.000 $425.000
REMOVE METAL BEAM GUARD FENCE
LF 2,500.000 $0.010 $0.010 $1.000 $1.500 $3.500
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $1.000 $1.000 $1.000 $1.000 $150.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $1.000 $1.000 $1.000 $1.000 $175.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 5.000 $1.000 $1.000 $1.000 $1.000 $1.000
RM MTL BM GD FEN TRANS (T101)
EA 5.000 $1.000 $1.000 $1.000 $1.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,500.000 $4,200.000 $3,500.000 $2,900.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $100.000 $100.000 $1.000 $100.000 $400.000
GUARDRAIL END TRTMNT(RETRO)(STEEL POST)
EA 2.000 $1,700.000 $1,700.000 $2,800.000 $100.000 $1,200.000
GUARDRAIL END TRTMNT(RETRO)(WOOD POST)
EA 2.000 $1,700.000 $1,700.000 $2,800.000 $100.000 $850.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 100.000 $5.000 $5.000 $5.000 $5.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 100.000 $5.000 $5.000 $5.000 $5.000 $22.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 100.000 $5.000 $5.000 $5.000 $5.000 $25.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 100.000 $5.000 $5.000 $5.000 $5.000 $0.010
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,500.000 $18.000 $26.000 $24.000 $23.000 $25.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $22.000 $22.000 $30.000 $10.000 $50.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 100.000 $22.000 $22.000 $25.000 $10.000 $35.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $20.000 $20.000 $35.000 $10.000 $35.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 250.000 $100.000 $20.000 $70.000 $100.000 $32.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 250.000 $50.000 $20.000 $40.000 $50.000 $55.000
REALIGN POSTS
EA 100.000 $10.000 $10.000 $1.000 $10.000 $18.000
REMOVE & REPLACE BLOCKOUT
EA 100.000 $10.000 $10.000 $5.000 $10.000 $12.500
REM & RESET SGT IMPACT HEAD
EA 10.000 $100.000 $100.000 $1.000 $10.000 $60.000
TMA (STATIONARY)
DAY 200.000 $50.000 $100.000 $1.000 $1.000 $200.000
Totals: $253,655.000 $217,955.000 $231,420.000 $234,590.000 $337,486.000