TERRY US 62 (0228-01-056)

Items: 78

County: TERRY
Length: N/A
Highway: US 62
District: LUBBOCK
Control Number: 0228-01-056
DBE Goal: N/A
Project: NH 2017(462)
Guaranty: N/A
Time: 289 WORKING DAYS
Engineer's Estimate: $24,156,431.90
Date: 09/07/2023 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEVE SISNEROS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$24,156,431.90
$22,784,906.89
Over/Under Est: -5.68% -$1,371,525.01
$25,535,165.69
Over/Under Est: 5.71% $1,378,733.79
Amt Left: 12.07% $2,750,258.80
$30,381,197.60
Over/Under Est: 25.77% $6,224,765.70
Amt Left: 33.34% $7,596,290.71
Delta: -18.98% -$4,846,031.91
Subcontractor Percentage Amount
ROADWAY SPECIALTIES, INC. 8.00% $1,849,721.14
INDUSTRIAL FABRICS, INC. 5.52% $1,276,307.59
TRP CONSTRUCTION GROUP, LLC 2.13% $492,488.25
NM AC & COMPANY LLC 2.05% $473,991.04
MURRAY CONSTRUCTION 0.99% $228,902.99
SQUARE ROOT SERVICES LLC 0.85% $196,532.87
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.63% $145,665.54
A BROTHERS MILLING, LLC 0.62% $143,353.39
BARRICADES UNLIMITED 0.38% $87,861.75
RILEY INDUSTRIAL SERVICES, INC. 0.13% $30,057.97
WEST TEXAS ROCK RESOURCES, LLC 0.07% $16,185.06
BERT WHITAKER 0.04% $9,248.61
Total: 21.41% $4,950,316.20

Bid Items & Bid Tabulations

78 Total 0 of 78
TERRY  |  US 62  |  LUBBOCK  |  0228-01-056  |  09/07/2023  |  $24,156,431.90  |  NH 2017(462)  |  SURF/ROADWAY RESTOR  |  289 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES HAMILTON CONSTRUCTION CO.
DUININCK, INC.
A. L. HELMCAMP, INC.
EXCAVATION (ROADWAY)
CY 1,086.000 $20.000 $18.000 $32.500 $98.000
SUBGRADE WIDENING (DENS CONT)
SY 42,198.000 $5.000 $7.000 $3.400 $5.000
BACKFILL (TY B)
STA 953.000 $250.000 $400.000 $130.000 $450.000
BLADING
STA 953.000 $250.000 $400.000 $30.500 $260.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 840,980.000 $0.200 $0.180 $0.170 $0.200
PROOF ROLLING
HR 100.000 $250.000 $100.000 $185.000 $220.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 41,552.000 $15.000 $13.000 $19.000 $21.000
REWORK BS MTL (TY B) (6") (DENS CONT)
SY 6,229.000 $5.000 $6.500 $15.500 $21.000
PRIME COAT (CSS-1H)
GAL 4,778.000 $5.000 $4.000 $4.300 $6.000
PRIME COAT (MC-30)
GAL 4,778.000 $6.000 $5.000 $5.900 $7.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 109,327.000 $4.000 $3.500 $3.550 $5.000
FOG SEAL (CSS-1H)
GAL 8,190.000 $6.000 $4.000 $3.850 $6.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 3,156.000 $60.000 $60.000 $78.500 $128.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 9,469.000 $30.000 $33.000 $41.500 $69.000
PLAN & TEXT ASPH CONC PAV(0" TO 6")
SY 1,317.000 $5.000 $4.700 $8.000 $15.000
PLANE ASPH CONC PAV (8")
SY 19,327.000 $5.000 $6.400 $10.000 $18.000
PLANE ASPH CONC PAV (2 1/2")
SY 107,535.000 $2.000 $1.700 $3.750 $3.500
CEM STABIL BKFL
CY 295.000 $300.000 $275.000 $255.000 $300.000
RIPRAP (MOW STRIP)(5 IN)
CY 2,464.000 $450.000 $475.000 $440.000 $475.000
RC PIPE (CL IV)(24 IN)
LF 1,280.000 $150.000 $140.000 $130.000 $160.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 24.000 $4,000.000 $2,750.000 $2,600.000 $3,100.000
CLEAN EXIST CULVERTS
EA 19.000 $2,500.000 $3,000.000 $1,000.000 $500.000
MOBILIZATION
LS 1.000 $2,196,000.000 $2,130,000.000 $1,900,000.000 $2,400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $15,000.000 $30,000.000 $30,500.000 $30,000.000
CONSTRUCTION EXITS (INSTALL) (TY 3)
SY 444.000 $50.000 $40.000 $35.500 $20.000
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $15.000 $5.000 $15.500 $5.000
SANDBAGS FOR EROSION CONTROL
EA 40.000 $10.000 $12.000 $35.500 $38.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 120.000 $6.000 $7.000 $7.150 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 60.000 $2.000 $3.000 $3.050 $3.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 5,510.000 $6.000 $5.000 $6.900 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,755.000 $1.000 $3.000 $1.000 $1.200
INTERSECTIONS (ACP)
SY 5,664.000 $70.000 $30.000 $38.000 $65.000
DRIVEWAYS (ACP)
SY 935.000 $100.000 $33.000 $49.500 $120.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 158,231.000 $0.300 $0.100 $0.110 $0.210
CABLE BARRIER SYSTEM (TL-4)
LF 51,862.000 $13.000 $14.600 $15.500 $14.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 46.000 $2,500.000 $2,400.000 $2,200.000 $2,400.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 6.000 $300.000 $300.000 $280.000 $300.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $400.000 $330.000 $305.000 $340.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $500.000 $575.000 $535.000 $580.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 75.000 $900.000 $600.000 $560.000 $610.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 188.000 $1,100.000 $825.000 $765.000 $830.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 19.000 $1,100.000 $990.000 $920.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 283.000 $100.000 $55.000 $51.000 $60.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 75.000 $30.000 $22.000 $20.500 $23.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 146.000 $100.000 $88.000 $81.500 $90.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 28,975.000 $0.250 $0.270 $0.260 $0.280
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 113,660.000 $0.250 $0.220 $0.200 $0.220
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 1,813.000 $0.750 $1.100 $1.000 $1.100
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 25,930.000 $0.600 $0.440 $0.410 $0.440
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 320.000 $2.250 $5.500 $5.100 $5.500
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 109,546.000 $0.250 $0.220 $0.200 $0.220
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,537.000 $2.000 $1.200 $1.450 $2.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 1,995.000 $1.000 $2.200 $2.050 $2.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 26,994.000 $0.800 $1.100 $1.000 $1.100
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 28,975.000 $0.600 $0.770 $0.710 $0.770
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 113,660.000 $0.600 $0.680 $0.630 $0.680
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 109,514.000 $0.600 $0.680 $0.630 $0.680
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 360.000 $30.000 $14.300 $13.500 $15.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 125.000 $250.000 $236.000 $220.000 $240.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 6.000 $500.000 $550.000 $510.000 $560.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 792.000 $80.000 $55.000 $51.000 $55.000
REFL PAV MRKR TY II-C-R
EA 4,481.000 $3.000 $4.400 $4.100 $4.500
ELIM EXT PAV MRK & MRKS (6")
LF 252,181.000 $0.500 $0.550 $0.510 $0.550
ELIM EXT PAV MRK & MRKS (8")
LF 25,930.000 $1.000 $0.820 $0.770 $0.800
FULL - WIDTH MOWING
CYC 3.000 $6,000.000 $4,200.000 $13,000.000 $15,000.000
LITTER REMOVAL
CYC 3.000 $3,000.000 $2,100.000 $8,200.000 $12,000.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 207,665.000 $6.500 $6.500 $5.900 $6.750
ASPH FOR REINF FAB (PG76-28)
GAL 31,150.000 $6.000 $5.500 $3.550 $5.500
TACK COAT
GAL 55,820.000 $4.000 $5.000 $3.000 $5.500
D-GR HMA TY-C SAC-B PG76-28
TON 7,145.000 $130.000 $138.000 $140.000 $186.000
D-GR HMA TY-F SAC-B PG76-28
TON 5,724.000 $150.000 $170.000 $165.000 $195.000
D-GR HMA TY-B SAC-B PG 76-28
TON 27,843.000 $130.000 $120.000 $160.000 $177.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 43,481.000 $170.000 $138.000 $190.000 $212.000
TACK COAT
GAL 37,633.000 $4.000 $5.000 $3.000 $5.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,080.000 $60.000 $40.000 $61.500 $120.000
TMA (STATIONARY)
DAY 578.000 $200.000 $200.000 $205.000 $200.000
TMA (MOBILE OPERATION)
DAY 54.000 $800.000 $750.000 $1,000.000 $200.000
TEMP SPEED MONITOR SYS
EA 2.000 $20,000.000 $12,000.000 $7,700.000 $8,500.000
Totals: $24,156,431.900 $22,784,906.890 $25,535,165.690 $30,381,197.600