|
|
EXCAVATION (ROADWAY)
|
CY
|
1,086.000
|
$20.000
|
$18.000
|
$32.500
|
$98.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
SY
|
42,198.000
|
$5.000
|
$7.000
|
$3.400
|
$5.000
|
|
|
BACKFILL (TY B)
|
STA
|
953.000
|
$250.000
|
$400.000
|
$130.000
|
$450.000
|
|
|
BLADING
|
STA
|
953.000
|
$250.000
|
$400.000
|
$30.500
|
$260.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
840,980.000
|
$0.200
|
$0.180
|
$0.170
|
$0.200
|
|
|
PROOF ROLLING
|
HR
|
100.000
|
$250.000
|
$100.000
|
$185.000
|
$220.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
41,552.000
|
$15.000
|
$13.000
|
$19.000
|
$21.000
|
|
|
REWORK BS MTL (TY B) (6") (DENS CONT)
|
SY
|
6,229.000
|
$5.000
|
$6.500
|
$15.500
|
$21.000
|
|
|
PRIME COAT (CSS-1H)
|
GAL
|
4,778.000
|
$5.000
|
$4.000
|
$4.300
|
$6.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
4,778.000
|
$6.000
|
$5.000
|
$5.900
|
$7.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
109,327.000
|
$4.000
|
$3.500
|
$3.550
|
$5.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
8,190.000
|
$6.000
|
$4.000
|
$3.850
|
$6.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
3,156.000
|
$60.000
|
$60.000
|
$78.500
|
$128.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
9,469.000
|
$30.000
|
$33.000
|
$41.500
|
$69.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 6")
|
SY
|
1,317.000
|
$5.000
|
$4.700
|
$8.000
|
$15.000
|
|
|
PLANE ASPH CONC PAV (8")
|
SY
|
19,327.000
|
$5.000
|
$6.400
|
$10.000
|
$18.000
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
107,535.000
|
$2.000
|
$1.700
|
$3.750
|
$3.500
|
|
|
CEM STABIL BKFL
|
CY
|
295.000
|
$300.000
|
$275.000
|
$255.000
|
$300.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
2,464.000
|
$450.000
|
$475.000
|
$440.000
|
$475.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
1,280.000
|
$150.000
|
$140.000
|
$130.000
|
$160.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
24.000
|
$4,000.000
|
$2,750.000
|
$2,600.000
|
$3,100.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
19.000
|
$2,500.000
|
$3,000.000
|
$1,000.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,196,000.000
|
$2,130,000.000
|
$1,900,000.000
|
$2,400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$15,000.000
|
$30,000.000
|
$30,500.000
|
$30,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 3)
|
SY
|
444.000
|
$50.000
|
$40.000
|
$35.500
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
$15.000
|
$5.000
|
$15.500
|
$5.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
40.000
|
$10.000
|
$12.000
|
$35.500
|
$38.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
120.000
|
$6.000
|
$7.000
|
$7.150
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
60.000
|
$2.000
|
$3.000
|
$3.050
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
5,510.000
|
$6.000
|
$5.000
|
$6.900
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,755.000
|
$1.000
|
$3.000
|
$1.000
|
$1.200
|
|
|
INTERSECTIONS (ACP)
|
SY
|
5,664.000
|
$70.000
|
$30.000
|
$38.000
|
$65.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
935.000
|
$100.000
|
$33.000
|
$49.500
|
$120.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
158,231.000
|
$0.300
|
$0.100
|
$0.110
|
$0.210
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
51,862.000
|
$13.000
|
$14.600
|
$15.500
|
$14.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
46.000
|
$2,500.000
|
$2,400.000
|
$2,200.000
|
$2,400.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
6.000
|
$300.000
|
$300.000
|
$280.000
|
$300.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$400.000
|
$330.000
|
$305.000
|
$340.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$500.000
|
$575.000
|
$535.000
|
$580.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
75.000
|
$900.000
|
$600.000
|
$560.000
|
$610.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
188.000
|
$1,100.000
|
$825.000
|
$765.000
|
$830.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
19.000
|
$1,100.000
|
$990.000
|
$920.000
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
283.000
|
$100.000
|
$55.000
|
$51.000
|
$60.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
75.000
|
$30.000
|
$22.000
|
$20.500
|
$23.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
146.000
|
$100.000
|
$88.000
|
$81.500
|
$90.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
28,975.000
|
$0.250
|
$0.270
|
$0.260
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
113,660.000
|
$0.250
|
$0.220
|
$0.200
|
$0.220
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
1,813.000
|
$0.750
|
$1.100
|
$1.000
|
$1.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
25,930.000
|
$0.600
|
$0.440
|
$0.410
|
$0.440
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
320.000
|
$2.250
|
$5.500
|
$5.100
|
$5.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
109,546.000
|
$0.250
|
$0.220
|
$0.200
|
$0.220
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,537.000
|
$2.000
|
$1.200
|
$1.450
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
1,995.000
|
$1.000
|
$2.200
|
$2.050
|
$2.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
26,994.000
|
$0.800
|
$1.100
|
$1.000
|
$1.100
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
28,975.000
|
$0.600
|
$0.770
|
$0.710
|
$0.770
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
113,660.000
|
$0.600
|
$0.680
|
$0.630
|
$0.680
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
109,514.000
|
$0.600
|
$0.680
|
$0.630
|
$0.680
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
360.000
|
$30.000
|
$14.300
|
$13.500
|
$15.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
125.000
|
$250.000
|
$236.000
|
$220.000
|
$240.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
6.000
|
$500.000
|
$550.000
|
$510.000
|
$560.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
792.000
|
$80.000
|
$55.000
|
$51.000
|
$55.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
4,481.000
|
$3.000
|
$4.400
|
$4.100
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
252,181.000
|
$0.500
|
$0.550
|
$0.510
|
$0.550
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
25,930.000
|
$1.000
|
$0.820
|
$0.770
|
$0.800
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$6,000.000
|
$4,200.000
|
$13,000.000
|
$15,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
3.000
|
$3,000.000
|
$2,100.000
|
$8,200.000
|
$12,000.000
|
|
|
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
|
SY
|
207,665.000
|
$6.500
|
$6.500
|
$5.900
|
$6.750
|
|
|
ASPH FOR REINF FAB (PG76-28)
|
GAL
|
31,150.000
|
$6.000
|
$5.500
|
$3.550
|
$5.500
|
|
|
TACK COAT
|
GAL
|
55,820.000
|
$4.000
|
$5.000
|
$3.000
|
$5.500
|
|
|
D-GR HMA TY-C SAC-B PG76-28
|
TON
|
7,145.000
|
$130.000
|
$138.000
|
$140.000
|
$186.000
|
|
|
D-GR HMA TY-F SAC-B PG76-28
|
TON
|
5,724.000
|
$150.000
|
$170.000
|
$165.000
|
$195.000
|
|
|
D-GR HMA TY-B SAC-B PG 76-28
|
TON
|
27,843.000
|
$130.000
|
$120.000
|
$160.000
|
$177.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
|
TON
|
43,481.000
|
$170.000
|
$138.000
|
$190.000
|
$212.000
|
|
|
TACK COAT
|
GAL
|
37,633.000
|
$4.000
|
$5.000
|
$3.000
|
$5.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,080.000
|
$60.000
|
$40.000
|
$61.500
|
$120.000
|
|
|
TMA (STATIONARY)
|
DAY
|
578.000
|
$200.000
|
$200.000
|
$205.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
54.000
|
$800.000
|
$750.000
|
$1,000.000
|
$200.000
|
|
|
TEMP SPEED MONITOR SYS
|
EA
|
2.000
|
$20,000.000
|
$12,000.000
|
$7,700.000
|
$8,500.000
|
|
Totals: |
$24,156,431.900
|
$22,784,906.890
|
$25,535,165.690
|
$30,381,197.600
|