Job Info for 6454-99-001

County: TAYLOR Highway: IH0020 Date: 12/05/2023 (11 months ago) Engineer's Estimate: $1,024,200 Control Number: 6454-99-001
Project: RMC - 645499001 District: ABILENE Time: 365 CALENDAR DAYS Type: CONCRETE STRUCTURE REPAIR
Bidder's List
Email All | Notice
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,024,200.00
DCC CONSTRUCTION AND SERVICES, L.L.C.   $855,754.00 1
-16.45% | -$168,446.00
STRUCTURAL INTEGRITY GROUP LLC   $1,017,750.00 2
-0.63% | -$6,450.00
18.93% | $161,996.00
GARRET SHIELDS INFRASTRUCTURE   $1,034,750.00 3
1.03% | $10,550.00
20.92% | $178,996.00
1.67% | $17,000.00
SCR CIVIL CONSTRUCTION, LLC   $1,251,540.00 4
22.2% | $227,340.00
46.25% | $395,786.00
20.95% | $216,790.00

Bid Items

Items: 14, 0 filtered
TAYLOR IH0020  |  ABILENE  |  6454-99-001  |  12/05/2023  |  $1,024,200  |  RMC - 645499001  |  CONC STRUCT REPAIR  |  365 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate DCC CONSTRUCTION AND SERVICES, L.L.C. STRUCTURAL INTEGRITY GROUP LLC GARRET SHIELDS INFRASTRUCTURE SCR CIVIL CONSTRUCTION, LLC
104 6009 REMOVING CONC (RIPRAP) SY 140.000 $27.500 $200.000 $115.000 $50.000 $240.000
104 6064 REMOVING CONC (MISC) CY 20.000 $30.000 $300.000 $750.000 $200.000 $100.000
401 6001 FLOWABLE BACKFILL CY 25.000 $380.000 $300.000 $650.000 $500.000 $1,400.000
429 6004 CONC STR REPAIR(RAPID DECK REP(PRT DPT) SF 400.000 $190.000 $175.000 $175.000 $250.000 $260.000
429 6006 CONC STR REPR(RAPID DECK REP(FULL DPT)) SF 300.000 $220.000 $300.000 $355.000 $400.000 $450.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 2,450.000 $250.000 $140.000 $205.000 $200.000 $220.000
429 6009 CONC STR REPAIR (STANDARD) SF 450.000 $230.000 $400.000 $250.000 $200.000 $215.000
432 6001 RIPRAP (CONC)(4 IN) CY 30.000 $750.000 $500.000 $1,110.000 $600.000 $1,800.000
438 6004 CLEANING AND SEALING EXIST JOINTS(CL7) LF 600.000 $55.000 $60.000 $42.000 $60.000 $65.000
454 6009 JOINT SEALANT LF 200.000 $50.000 $50.000 $57.000 $50.000 $65.000
500 6033 MOBILIZATION (CALLOUT) EA 4.000 $3,000.000 $1.000 $3,500.000 $5,000.000 $12,000.000
780 6002 CNC CRACK REPAIR (DISCRETE)(INJECT) LF 450.000 $70.000 $65.000 $80.000 $125.000 $120.000
788 6002 CONCRETE BEAM REPAIR (CFRP) EA 2.000 $12,000.000 $10,000.000 $21,750.000 $25,000.000 $31,000.000
6185 6002 TMA (STATIONARY) DAY 70.000 $275.000 $300.000 $225.000 $300.000 $517.000
Totals: $1,024,200.00 $855,754.00 $1,017,750.00 $1,034,750.00 $1,251,540.00