Show Job Controls
Bid Cobra

TAYLOR IH0020 (6391-97-001)

Items: 44

County: TAYLOR
Length: N/A
Highway: IH0020
District: ABILENE
Control Number: 6391-97-001
DBE Goal: N/A
Project: RMC - 639197001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,117,695.00
Date: 05/05/2022 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
PAUL NORMAN
CHAD W CARTER
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$1,117,695.00
$1,158,325.00
Over/Under Est: 3.64% $40,630.00
$1,407,700.05
Over/Under Est: 25.95% $290,005.05
Amt Left: 21.53% $249,375.05

Bid Items & Bid Tabulations

44 Total 0 of 44
TAYLOR  |  IH0020  |  ABILENE  |  6391-97-001  |  05/05/2022  |  $1,117,695.00  |  RMC - 639197001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BK FIELD OPERATIONS LLC
HJC FARMS, INC.
STR STEEL (RAILS / POSTS / PLATES)
LB 100.000 $2.500 $10.000 $10.000
MOBILIZATION (CALLOUT)
EA 35.000 $10.000 $20.000 $10.000
MOBILIZATION (EMERGENCY)
EA 100.000 $10.000 $20.000 $10.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $100.000 $1,400.000 $1,235.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 10.000 $1,200.000 $250.000 $850.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $10.000 $800.000 $200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 20.000 $25.000 $10.000 $13.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $35.000 $10.000 $10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 10.000 $10.000 $10.000 $10.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 10.000 $25.000 $10.000 $13.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 10.000 $10.000 $10.000 $13.500
INSTL DEL ASSM (D-SR)SZ 1(BRF)GF2
EA 10.000 $10.000 $10.000 $10.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 10.000 $7.500 $10.000 $10.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 10.000 $10.000 $10.000 $10.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 17,000.000 $15.750 $18.000 $21.500
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 55.000 $35.000 $40.000 $30.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 50.000 $35.000 $30.000 $41.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 250.000 $18.000 $24.000 $25.500
RAISE RAIL ELEMENT
LF 25.000 $5.000 $20.000 $5.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 500.000 $40.000 $24.000 $46.750
REM / REPL TIMBER / STL POST W/CONC FND
EA 500.000 $50.000 $24.000 $56.750
REPAIR STEEL POST WITH BASE PLATE
EA 20.000 $100.000 $100.000 $150.000
REALIGN POSTS
EA 600.000 $15.000 $1.000 $15.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 600.000 $10.000 $10.000 $10.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,200.000 $25.000 $34.000 $38.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 200.000 $100.000 $50.000 $75.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 75.000 $2,500.000 $4,000.000 $3,450.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 30.000 $1,000.000 $1,050.000 $850.000
REM & RESET SGT IMPACT HEAD
EA 50.000 $100.000 $25.000 $300.000
REPLACE SGT OBJECT MARKER
EA 25.000 $1.000 $15.000 $30.000
REPLACE POSTS (TL-4)
EA 2,000.000 $200.000 $165.000 $220.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 20.000 $1.000 $10.000 $95.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 2.000 $10.000 $100.000 $5.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 30.000 $500.000 $1,500.000 $1,175.000
REPLACE CABLE (TL-4)
LF 200.000 $1.000 $0.100 $1.000
CHECK / RE-TENSION CABLE
EA 20.000 $50.000 $25.000 $100.000
REPAIR (CATCB - FRNT SECT)
EA 5.000 $1.000 $2,000.000 $0.010
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 10.000 $5.000 $10.000 $20.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 150.000 $10.000 $45.000 $25.000
BOX BEAM MEDIAN BARRIER REPAIR
LF 100.000 $1.000 $50.000 $1.000
BOX BEAM MEDIAN BARRIER POST
EA 20.000 $100.000 $100.000 $300.000
CONCRETE RAIL REPAIR (MISC)
LF 10.000 $100.000 $70.000 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $100.000 $0.100 $50.000
TMA (STATIONARY)
DAY 200.000 $300.000 $0.100 $400.000
Totals: $1,117,695.000 $1,158,325.000 $1,407,700.050