Show Job Controls
Bid Cobra

TAYLOR IH0020 (6363-39-001)

Items: 65

County: TAYLOR
Length: N/A
Highway: IH0020
District: ABILENE
Control Number: 6363-39-001
DBE Goal: N/A
Project: RMC - 636339001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,602,224.00
Date: 05/07/2020 (6 years ago)
Contract Number: N/A
Type: CALL OUT MBGF REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,602,224.00
$1,365,822.29
Over/Under Est: -14.75% -$236,401.71
$1,476,780.00
Over/Under Est: -7.83% -$125,444.00
Amt Left: 8.12% $110,957.71
$2,525,384.00
Over/Under Est: 57.62% $923,160.00
Amt Left: 84.9% $1,159,561.71
Delta: -71.01% -$1,048,604.00

Bid Items & Bid Tabulations

65 Total 0 of 65
TAYLOR  |  IH0020  |  ABILENE  |  6363-39-001  |  05/07/2020  |  $1,602,224.00  |  RMC - 636339001  |  CALL OUT MBGF REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HJC FARMS, INC.
K-BAR SERVICES, INC.
JCW CONSTRUCTION, LLC
REMOVING CONC (MISC)
CY 40.000 $76.000 $10.000 $48.000 $350.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 200.000 $125.000 $70.000 $60.000 $200.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 500.000 $134.000 $27.500 $55.000 $100.000
CONC STR REPAIR (STANDARD)
SF 500.000 $117.000 $35.000 $55.000 $150.000
RIPRAP (CONC)(5 IN)
CY 40.000 $446.000 $150.000 $300.000 $750.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 100.000 $37.000 $25.000 $25.000 $200.000
STR STEEL (RAILS / POSTS / PLATES)
LB 100.000 $22.000 $2.500 $5.000 $5.000
HEADER TYPE EXPANSION JOINT
CF 50.000 $500.000 $200.000 $450.000 $500.000
JOINT SEALANT
LF 200.000 $22.000 $15.000 $15.000 $100.000
MOBILIZATION (CALLOUT)
EA 35.000 $200.000 $10.000 $50.000 $250.000
MOBILIZATION (EMERGENCY)
EA 100.000 $250.000 $10.000 $100.000 $500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,200.000 $100.000 $1,500.000 $1,800.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $142.000 $10.000 $50.000 $300.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 200.000 $24.000 $15.000 $18.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 25.000 $22.000 $0.010 $25.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 25.000 $26.000 $0.010 $25.000 $100.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 70.000 $20.000 $20.000 $25.000 $100.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 25.000 $25.000 $0.010 $25.000 $100.000
INSTL DEL ASSM (D-SR)SZ 1(BRF)GF2
EA 10.000 $25.000 $1.000 $25.000 $100.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 25.000 $6.000 $0.010 $25.000 $100.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 25.000 $5.000 $0.010 $25.000 $100.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 17,000.000 $18.000 $15.750 $20.000 $28.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 55.000 $27.000 $35.000 $50.000 $100.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 50.000 $27.000 $35.000 $50.000 $100.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 250.000 $34.000 $18.000 $20.000 $20.000
RAISE RAIL ELEMENT
LF 25.000 $5.000 $1.000 $8.000 $5.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 500.000 $30.000 $40.000 $65.000 $100.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 500.000 $50.000 $50.000 $65.000 $100.000
REPAIR STEEL POST WITH BASE PLATE
EA 20.000 $300.000 $100.000 $400.000 $750.000
REALIGN POSTS
EA 600.000 $18.000 $15.000 $15.000 $100.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 600.000 $10.000 $10.000 $40.000 $50.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,200.000 $23.000 $25.000 $25.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 200.000 $51.000 $100.000 $80.000 $100.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 2.000 $63.000 $0.010 $80.000 $1.000
REPLACE TERMINAL ANCHOR POSTS
EA 2.000 $89.000 $0.010 $80.000 $1.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 75.000 $3,000.000 $2,500.000 $3,500.000 $3,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 30.000 $1,000.000 $1,000.000 $900.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 50.000 $103.000 $100.000 $50.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 5.000 $74.000 $1.000 $1.000 $1.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $79.000 $1.000 $1.000 $1.000
REPLACE SGT STRUT
EA 5.000 $82.000 $1.000 $1.000 $1.000
REPLACE SGT OBJECT MARKER
EA 25.000 $30.000 $1.000 $10.000 $30.000
REPLACE POSTS (TL-4)
EA 3,000.000 $130.000 $200.000 $130.000 $200.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 20.000 $120.000 $1.000 $100.000 $1.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 2.000 $55.000 $10.000 $100.000 $10.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 30.000 $1,000.000 $500.000 $500.000 $500.000
REPLACE CABLE (TL-4)
LF 200.000 $3.000 $1.000 $4.000 $2.000
CHECK / RE-TENSION CABLE
EA 20.000 $150.000 $50.000 $80.000 $150.000
REMOVE AND REPLACE (TRACC)
EA 5.000 $4,000.000 $1.000 $250.000 $500.000
REMOVE AND REPLACE (WIDE TRACC)
EA 5.000 $2,000.000 $1.000 $250.000 $500.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 5.000 $3,000.000 $1.000 $500.000 $15,000.000
REPAIR (TRACC)
LF 50.000 $70.000 $1.000 $100.000 $50.000
REPAIR (WIDE TRACC)
EA 50.000 $1,000.000 $1.000 $100.000 $1,000.000
REPAIR (NARROW REACT 350)
LF 50.000 $250.000 $1.000 $100.000 $500.000
REMOVE AND REPLACE (FASTRACC)
EA 5.000 $4,000.000 $1.000 $500.000 $10,000.000
REPAIR (FASTRACC)
LF 50.000 $250.000 $1.000 $150.000 $500.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 10.000 $40.000 $5.000 $150.000 $30.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 150.000 $30.000 $10.000 $40.000 $50.000
BOX BEAM MEDIAN BARRIER REPAIR
LF 100.000 $125.000 $1.000 $5.000 $10.000
BOX BEAM MEDIAN BARRIER POST
EA 20.000 $200.000 $100.000 $350.000 $300.000
CONCRETE RAIL REPAIR (MISC)
LF 10.000 $200.000 $100.000 $350.000 $200.000
CONCRETE POST REPAIR
EA 5.000 $217.000 $1.000 $350.000 $100.000
CONCRETE POST REPLACEMENT
EA 5.000 $150.000 $1.000 $350.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $120.000 $0.010 $50.000 $500.000
TMA (STATIONARY)
DAY 200.000 $275.000 $300.000 $350.000 $1,000.000
Totals: $1,602,224.000 $1,365,822.290 $1,476,780.000 $2,525,384.000