Job Info for 0908-00-119

County: TAYLOR Highway: VA Date: 05/03/2024 (6 months ago) Engineer's Estimate: $1,355,398 Control Number: 0908-00-119
Project: C 908-00-119 District: ABILENE Time: 171 WORKING DAYS Type: BRIDGE MAINTENANCE
Bidder's List
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,355,398.00
DCC CONSTRUCTION AND SERVICES, L.L.C.   $1,269,224.00 1
-6.36% | -$86,174.00
SCR CIVIL CONSTRUCTION, LLC   $1,459,366.76 2
7.67% | $103,968.76
14.98% | $190,142.76
MB WESTERN INDUSTRIAL CONTRACTING CO.   $1,533,108.00 3
13.11% | $177,710.00
20.79% | $263,884.00
5.05% | $73,741.24
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC   $1,590,555.00 4
17.35% | $235,157.00
25.32% | $321,331.00
3.75% | $57,447.00
ICOS MANAGEMENT, LLC   $1,715,434.00 5
26.56% | $360,036.00
35.16% | $446,210.00
7.85% | $124,879.00
Subcontractor Percentage Amount
TAYLOR CONTRACTING LLC 48.62% $617,096.71
BARRICADES UNLIMITED 5.58% $70,822.70
S & S BRIDGE PAINTING, INC. 4.70% $59,653.53
Total: 58.90% $747,572.94

Bid Items

Items: 35, 0 filtered
TAYLOR VA  |  ABILENE  |  0908-00-119  |  05/03/2024  |  $1,355,398  |  C 908-00-119  |  BRIDGE MAINT  |  171 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate DCC CONSTRUCTION AND SERVICES, L.L.C. SCR CIVIL CONSTRUCTION, LLC MB WESTERN INDUSTRIAL CONTRACTING CO. BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC ICOS MANAGEMENT, LLC
104 6009 REMOVING CONC (RIPRAP) SY 45.000 $80.000 $150.000 $132.000 $35.000 $100.000 $120.000
401 6001 FLOWABLE BACKFILL CY 20.000 $500.000 $500.000 $500.000 $650.000 $100.000 $400.000
427 6007 EPOXY WATERPROOF FINISH (TY X) SF 3,197.000 $11.000 $7.000 $21.000 $15.000 $20.000 $30.000
429 6003 CONC STR REPAIR(DECK REP(PART DEPTH)) SF 20.000 $220.000 $1,000.000 $800.000 $175.000 $350.000 $600.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 1,758.000 $250.000 $150.000 $218.000 $224.000 $325.000 $260.000
432 6009 RIPRAP (CONC) (CL B) (4") CY 5.000 $1,200.000 $500.000 $2,180.000 $800.000 $1,000.000 $1,200.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 45.000 $600.000 $300.000 $585.000 $300.000 $250.000 $400.000
434 6003 ELASTOMERIC BEARING (SPECIAL) EA 8.000 $3,500.000 $11,000.000 $4,900.000 $13,500.000 $5,000.000 $10,000.000
438 6002 CLEANING AND SEALING EXIST JOINTS(CL3) LF 128.000 $50.000 $50.000 $45.000 $95.000 $80.000 $80.000
438 6008 CLEANING AND SEALING JOINTS (CL 7) LF 117.000 $50.000 $50.000 $30.000 $100.000 $80.000 $80.000
438 6016 CLEAN AND SEAL EXIST JTS (STRIP SEAL) LF 38.000 $50.000 $50.000 $45.000 $120.000 $85.000 $150.000
442 6011 STR STEEL (PEDESTAL) LB 1,390.000 $50.000 $40.000 $25.000 $37.000 $50.000 $50.000
446 6051 SPOT CLEAN & PAINT EXT STR(SPL PRT SYS) EA 1.000 $15,000.000 $19,200.000 $24,225.000 $23,500.000 $55,000.000 $80,000.000
495 6001 RAISING EXIST STRUCT LS 1.000 $50,000.000 $110,000.000 $82,500.000 $193,000.000 $200,000.000 $60,000.000
496 6043 REMOV STR (SMALL FENCE) LF 33.000 $12.000 $1.000 $20.000 $20.000 $15.000 $50.000
500 6001 MOBILIZATION LS 1.000 $140,000.000 $125,000.000 $145,800.000 $120,000.000 $150,000.000 $160,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 9.000 $12,000.000 $9,500.000 $15,050.000 $5,000.000 $4,500.000 $14,000.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 1,200.000 $10.000 $15.000 $9.000 $10.000 $10.000 $0.010
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 1,200.000 $3.000 $1.000 $1.150 $1.500 $2.000 $0.010
552 6001 WIRE FENCE (TY A) LF 33.000 $35.000 $20.000 $55.000 $20.000 $50.000 $100.000
636 6011 REPLACE EXISTING ALUMINUM SIGNS (TY O) EA 1.000 $200.000 $500.000 $500.000 $500.000 $150.000 $15,000.000
644 6064 IN BRIDGE MNT CLEARANCE SGN ASSM(TY N) EA 1.000 $2,500.000 $500.000 $8,000.000 $3,000.000 $2,500.000 $4,500.000
644 6077 REMOVE BRDG MNT CLEARANCE SIGN ASSM EA 1.000 $600.000 $500.000 $4,000.000 $750.000 $1,000.000 $3,500.000
662 6016 WK ZN PAV MRK NON-REMOV (W)24"(SLD) LF 288.000 $20.000 $2.000 $0.010 $7.000 $20.000 $40.000
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 288.000 $10.000 $2.000 $0.010 $5.000 $10.000 $20.000
738 6010 CLEANING / SWEEPING (SPOT) MI 0.200 $10,000.000 $1,000.000 $23,000.000 $2,500.000 $10,000.000 $10,000.000
784 6003 REP STL BRIDGE MEMBER (DIAPHRAGM) EA 2.000 $5,000.000 $3,000.000 $2,840.000 $5,600.000 $10,000.000 $10,000.000
784 6034 REP STL BRIDGE MEMBER(STRAIGHTEN MEMB) EA 1.000 $20,000.000 $65,000.000 $62,200.000 $76,160.000 $65,000.000 $18,000.000
785 6001 BRIDGE JOINT REPAIR (CONCRETE) LF 43.000 $350.000 $500.000 $880.000 $450.000 $500.000 $700.000
785 6011 BRIDGE JOINT REPLACEMENT (SEJ) LF 12.000 $675.000 $500.000 $1,880.000 $425.000 $650.000 $1,400.000
786 6001 CARBON FIBER REINF POLYMER PROTECTION SF 132.000 $145.000 $100.000 $100.000 $150.000 $175.000 $200.000
4002 6001 REPLACE ELASTOMERIC BEARING PADS EA 22.000 $8,500.000 $10,000.000 $9,975.000 $12,500.000 $5,000.000 $14,000.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $13,000.000 $5,000.000 $6,050.000 $5,000.000 $5,000.000 $8,000.000
6185 6002 TMA (STATIONARY) DAY 169.000 $300.000 $300.000 $225.000 $200.000 $250.000 $10.000
7309 6002 CLEANING STRUCTURE (ABUTMENT) EA 6.000 $2,000.000 $1,300.000 $2,000.000 $450.000 $1,200.000 $2,000.000
Totals: $1,355,398.00 $1,269,224.00 $1,459,366.76 $1,533,108.00 $1,590,555.00 $1,715,434.00