TAYLOR IH 20 (0006-04-080)

Items: 41

County: TAYLOR
Length: N/A
Highway: IH 20
District: ABILENE
Control Number: 0006-04-080
DBE Goal: N/A
Project: F 2024(063)
Guaranty: N/A
Time: 142 WORKING DAYS
Engineer's Estimate: $14,104,194.75
Date: 09/07/2023 (2 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
BRYCE TURENTINE
CHAD W CARTER
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$14,104,194.75
$12,105,731.79
Over/Under Est: -14.17% -$1,998,462.96
$13,824,448.80
Over/Under Est: -1.98% -$279,745.95
Amt Left: 14.2% $1,718,717.01
$14,084,161.28
Over/Under Est: -0.14% -$20,033.47
Amt Left: 16.34% $1,978,429.49
Delta: -1.88% -$259,712.48
Subcontractor Percentage Amount
MAR-ZAP CONSTRUCTION, LLC 3.76% $455,174.58
STRAIGHT LINE SAWING & SEALING, INC. 0.70% $84,739.95
MURRAY CONSTRUCTION 0.44% $53,265.11
KING GEORGE TRAFFIC SOLUTIONS LLC 0.14% $16,947.99
LINEAR TRAFFIC MARKINGS LLC 0.13% $15,737.42
WEST TEXAS ROCK RESOURCES, LLC 0.13% $15,737.42
Total: 5.30% $641,602.47

Bid Items & Bid Tabulations

41 Total 0 of 41
TAYLOR  |  IH 20  |  ABILENE  |  0006-04-080  |  09/07/2023  |  $14,104,194.75  |  F 2024(063)  |  PREVENT MAINT  |  142 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOUTSCO PAVING COMPANY, LLC
RK HALL, LLC
DUININCK, INC.
BACKFILL (TY B)
STA 1,412.200 $110.000 $50.000 $170.090 $125.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 29,809.000 $40.000 $35.000 $43.520 $40.000
PLANE ASPH CONC PAV(0" TO 4")
SY 6,770.000 $3.000 $3.000 $11.800 $7.400
PLANE ASPH CONC PAV (1")
SY 415,443.000 $3.000 $0.500 $1.570 $1.950
CLEANING AND SEALING EXISTING JOINTS
LF 3,042.000 $40.000 $32.000 $35.760 $34.500
MOBILIZATION
LS 1.000 $1,245,781.750 $1,200,000.000 $667,046.010 $880,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $12,225.000 $50,000.000 $34,687.070 $30,500.000
RUMBLE STRIPS (SHOULDER)
LF 191,398.000 $0.250 $0.150 $0.160 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 28,675.000 $25.000 $23.000 $25.480 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 34.000 $1,850.000 $2,000.000 $3,269.910 $2,400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 19.000 $1,300.000 $1,500.000 $1,456.000 $1,900.000
MTL BM GD FEN TRANS (NON - SYM)
EA 19.000 $1,000.000 $950.000 $1,036.000 $1,250.000
CONNECTOR PLATE FOR THRIE BEAM
EA 19.000 $875.000 $450.000 $728.000 $800.000
REMOVE METAL BEAM GUARD FENCE
LF 28,675.000 $3.250 $1.500 $1.400 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 17.000 $240.000 $150.000 $224.000 $400.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $300.000 $200.000 $112.000 $375.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 34.000 $250.000 $200.000 $224.000 $400.000
GUARDRAIL END TREATMENT (INSTALL)
EA 36.000 $2,750.000 $2,800.000 $4,392.900 $3,225.000
GUARDRAIL END TREATMENT (REMOVE)
EA 36.000 $300.000 $200.000 $224.000 $375.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 211.000 $55.000 $52.000 $51.620 $45.500
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 89.000 $30.000 $45.000 $64.400 $62.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 89.000 $30.000 $45.000 $64.400 $62.000
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
EA 319.000 $60.000 $55.000 $52.850 $46.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 308.000 $40.000 $45.000 $33.600 $67.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 76.000 $40.000 $45.000 $33.600 $67.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 15,284.000 $2.000 $1.000 $4.860 $1.550
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 10,634.000 $2.000 $1.000 $4.860 $1.550
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 6,525.000 $1.750 $0.570 $1.120 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 8,032.000 $1.250 $0.770 $1.120 $1.100
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 5,725.000 $3.500 $2.000 $1.960 $1.900
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 35,320.000 $1.500 $0.600 $0.780 $0.760
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 135,948.000 $1.500 $0.550 $0.750 $0.720
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 141,216.000 $1.500 $0.550 $0.750 $0.720
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 359.000 $3.500 $2.500 $3.360 $3.250
REFL PAV MRKR TY II-C-R
EA 5,156.000 $4.250 $3.500 $5.040 $4.850
D-GR HMA TY-D SAC-B PG70-22
TON 13,563.000 $150.000 $117.000 $129.980 $140.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 36,246.000 $160.000 $171.150 $183.970 $190.000
TACK COAT
GAL 61,606.000 $6.000 $0.100 $5.420 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $2,000.000 $21,556.660 $16,000.000
TMA (STATIONARY)
DAY 72.000 $225.000 $1.000 $413.220 $325.000
TMA (MOBILE OPERATION)
DAY 73.000 $550.000 $1.000 $600.000 $1,100.000
Totals: $14,104,194.750 $12,105,731.790 $13,824,448.808 $14,084,161.280