TARRANT IH0030 (6400-03-001)

Items: 48

County: TARRANT
Length: N/A
Highway: IH0030
District: FORT WORTH
Control Number: 6400-03-001
DBE Goal: N/A
Project: RMC - 640003001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $6,012,791.68
Date: 05/05/2022 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
DAVID NEELEY
RUSSELL POER
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$6,012,791.68
$5,297,740.00
Over/Under Est: -11.89% -$715,051.68
Over/Under Est: 9.15% $550,133.32
Amt Left: 23.88% $1,265,185.00
$6,999,106.00
Over/Under Est: 16.4% $986,314.32
Amt Left: 32.11% $1,701,366.00
Delta: -6.65% -$436,181.00
$7,780,675.00
Over/Under Est: 29.4% $1,767,883.32
Amt Left: 46.87% $2,482,935.00
Delta: -11.17% -$781,569.00

Bid Items & Bid Tabulations

48 Total 0 of 48
TARRANT  |  IH0030  |  FORT WORTH  |  6400-03-001  |  05/05/2022  |  $6,012,791.68  |  RMC - 640003001  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SHORT-LINE CORPORATION
FIREMAN EXCAVATING, INC.
DIGG COMMERCIAL, LLC
VANN/ELLI, INC.
MOBILIZATION
LS 1.000 $37,230.000 $1.000 $400,000.000 $1.000 $45,000.000
MOBILIZATION (EMERGENCY)
EA 2.000 $705.090 $5,000.000 $4,000.000 $25,000.000 $2,250.000
MTL W-BEAM GD FEN (TIM POST)
LF 11,000.000 $21.230 $1.000 $20.000 $15.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 50.000 $1,579.520 $3,000.000 $2,500.000 $1,205.000 $2,520.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 25.000 $8.500 $50.000 $200.000 $200.000 $30.000
SHORT RADIUS
LF 225.000 $24.260 $50.000 $35.000 $21.000 $63.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 100.000 $1,360.000 $1,000.000 $1,200.000 $945.000 $1,350.000
MTL BM GD FEN TRANS (31"-28")
EA 20.000 $450.000 $500.000 $1,000.000 $375.000 $810.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 20.000 $830.000 $500.000 $2,000.000 $600.000 $455.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $2.570 $100.000 $10.000 $1.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,700.000 $5,000.000 $6,000.000 $5,000.000 $4,500.000
CHAIN LINK FENCE (REPAIR) (4')
LF 5,000.000 $22.380 $10.000 $25.000 $18.000 $27.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 70,000.000 $19.380 $11.000 $20.000 $15.000 $20.000
REALIGN EXISTING RAIL
LF 13,000.000 $13.000 $0.010 $4.000 $4.000 $13.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 3,000.000 $45.000 $30.000 $28.000 $70.000 $45.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 500.000 $50.500 $1.000 $20.000 $70.000 $55.000
REALIGN POSTS
EA 5,800.000 $9.680 $100.000 $20.000 $15.000 $27.000
REMOVE & REPLACE BLOCKOUT
EA 1,900.000 $21.300 $1.000 $20.000 $10.000 $15.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 3,600.000 $24.480 $1.000 $20.000 $23.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 200.000 $65.940 $20.000 $50.000 $50.000 $100.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 500.000 $3,091.000 $2,900.000 $3,500.000 $2,355.000 $3,800.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 90.000 $882.230 $100.000 $800.000 $840.000 $720.000
REM & RESET SGT IMPACT HEAD
EA 60.000 $151.580 $100.000 $50.000 $1.000 $180.000
REPLACE SGT CABLE ASSEMBLY
EA 70.000 $62.580 $1.000 $50.000 $35.000 $100.000
REPLACE SGT STRUT
EA 15.000 $68.000 $1.000 $50.000 $68.000 $100.000
REPAIR STEEL POST WITH BASE PLATE
EA 500.000 $230.000 $200.000 $250.000 $78.000 $360.000
REPLACE POSTS (TL-3)
EA 1,600.000 $122.280 $250.000 $275.000 $220.000 $200.000
REPLACE POSTS (TL-4)
EA 1,600.000 $140.000 $150.000 $100.000 $167.000 $350.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 10.000 $166.620 $1.000 $500.000 $220.000 $300.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 2.000 $60.000 $1.000 $100.000 $300.000 $50.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 12.000 $77.450 $1.000 $100.000 $300.000 $50.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 10.000 $1,274.130 $2,500.000 $2,500.000 $5,000.000 $2,000.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,900.000 $2,500.000 $2,500.000 $5,000.000 $2,000.000
CHECK / RE-TENSION CABLE
EA 40.000 $500.000 $100.000 $500.000 $500.000 $90.000
REPLACE POST HARDWARE (TL-4)
EA 1,000.000 $15.000 $15.000 $70.000 $25.000 $45.000
REPLACE POST HARDWARE (TL-3)
EA 1,000.000 $0.300 $1.000 $5.000 $25.000 $45.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 600.000 $5.000 $10.000 $4.000 $2.000 $10.000
REPAIR (TRACC)
EA 20.000 $3,000.000 $5,000.000 $5,000.000 $2,500.000 $6,300.000
REPAIR (WIDE TRACC)
EA 10.000 $3,000.000 $5,000.000 $5,000.000 $2,800.000 $7,000.000
REPAIR (REACT)
EA 80.000 $3,500.000 $2,000.000 $1,500.000 $1,700.000 $1,800.000
REPAIR REACT (N) (MISC HARDWARE)
EA 20.000 $992.540 $1,000.000 $1,500.000 $1,200.000 $1,800.000
REPAIR REACT (N) (CYLINDERS)
EA 3.000 $2,500.000 $5,000.000 $10,000.000 $3,700.000 $5,000.000
REMOVE AND REPLACE (SMTC) (N)
EA 25.000 $22,385.560 $100.000 $5,000.000 $23,000.000 $30,000.000
REPAIR (SMTC) (N)
EA 35.000 $3,000.000 $7,500.000 $4,000.000 $2,700.000 $5,000.000
REMOVE AND REPLACE (SMTC) (W)
EA 5.000 $20,000.000 $20,000.000 $30,000.000 $35,000.000 $47,000.000
REPAIR (SMTC) (W)
EA 5.000 $2,495.160 $5,000.000 $4,000.000 $8,000.000 $9,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 130.000 $70.000 $100.000 $100.000 $100.000 $135.000
TMA (STATIONARY)
DAY 430.000 $150.830 $1,000.000 $500.000 $4,000.000 $180.000
Totals: $6,012,791.680 $5,297,740.000 $6,562,925.000 $6,999,106.000 $7,780,675.000