Show Job Controls
Bid Cobra

TARRANT DUNCAN PERRY RD (0902-90-129)

Items: 115

County: TARRANT
Length: 0.1460 MILES (0.1060 MILES)
Highway: DUNCAN PERRY RD
District: FORT WORTH
Control Number: 0902-90-129
DBE Goal: 0.0%
Project: BR 2020(574)
Guaranty: $100,000.00
Time: 236 WORKING DAYS
Engineer's Estimate: $5,087,705.45
Date: 07/02/2026 1:00 PM CDT (16 days ago)
Contract Number: 7263206
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00064472
Contract Type: FEDERAL
Project Description: BRIDGE REPLACEMENT
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JUSTIN THOMEY
RAUL OROZCO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$5,087,705.45
$7,071,177.70
Over/Under Est: 38.99% $1,983,472.25
Over/Under Est: 62.98% $3,204,299.73
Amt Left: 17.26% $1,220,827.48
Over/Under Est: 95.92% $4,880,037.46
Amt Left: 40.96% $2,896,565.21
Delta: -20.21% -$1,675,737.73

Bid Items & Bid Tabulations

115 Total 0 of 115
TARRANT  |  DUNCAN PERRY RD  |  FORT WORTH  |  0902-90-129  |  07/02/2026 1:00 PM CDT  |  $5,087,705.45  |  BR 2020(574)  |  REHAB EXIST ROADWAY  |  236 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
CASTILLO ARANDA LLC
MCMAHON CONTRACTING AND CONSTRUCTION, LLC
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 7.700 $3,000.000 $92,000.000 $18,056.490 $100,000.000
REMOV CONC (RIPRAP)
SY 483.000 $20.000 $50.000 $21.260 $21.000
EXCAV (ROADWAY)
CY 1,485.000 $20.000 $20.000 $24.590 $15.750
EMBANK (FNL)(DC)(TY C2)
CY 1,423.000 $20.000 $30.000 $35.460 $63.000
EMBANK (FNL)(DC)(TY D)
CY 1,485.000 $20.000 $35.000 $8.030 $15.750
COMPOST MANUF TOPSOIL (4")
SY 15,556.000 $5.000 $5.000 $1.870 $7.030
HYDRO MULCH SEED (PERM_URBAN_CLAY)
SY 15,556.000 $3.000 $2.000 $0.940 $0.910
HYDRO MULCH SEED (TEMP_WARM)
SY 3,889.000 $3.000 $1.000 $1.030 $1.000
HYDRO MULCH SEED (TEMP_COOL)
SY 3,889.000 $3.000 $1.000 $1.030 $1.000
VEGETATIVE WATERING
TGL 544.500 $30.000 $55.000 $55.000 $53.250
SOIL RET BLKT(SL_STEEP_CLAY_SHORT)
SY 761.000 $4.000 $5.000 $3.410 $3.300
SOIL RET BLKT(SL_STEEP_CLAY_LONG)
SY 1,186.000 $4.000 $6.500 $6.990 $6.760
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 428.000 $60.000 $100.000 $113.210 $125.000
LIME (COM OR QK)(SLURRY)
TON 32.000 $350.000 $330.000 $348.810 $350.000
LIME TRT (EXIST MATL & NEW BASE)(8")
SY 1,927.000 $6.000 $12.000 $11.270 $10.000
SALV, HAUL & STKPL RCL APH PV (6 TO 8")
SY 1,850.000 $7.000 $12.000 $12.440 $10.630
PRIME COAT(MC-30 OR AE-P)
GAL 353.000 $10.000 $26.000 $11.330 $19.170
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 304.000 $180.000 $175.000 $227.150 $219.920
TACK COAT
GAL 381.000 $5.000 $25.000 $4.400 $4.260
SP MIXES SP-C SAC-A PG70-28
TON 199.000 $225.000 $235.000 $267.630 $259.110
CEM STABIL BKFL
CY 337.000 $220.000 $90.000 $126.110 $300.000
TRENCH EXCAVATION PROTECTION
LF 283.000 $11.000 $1.000 $1.450 $50.000
TEMPORARY SPL SHORING
SF 318.000 $35.000 $30.000 $44.000 $75.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 1,082.000 $30.000 $50.000 $92.490 $75.000
DRILL SHAFT (18 IN)
LF 142.000 $150.000 $270.000 $174.430 $170.000
DRILL SHAFT (36 IN)
LF 711.000 $220.000 $400.000 $300.610 $275.000
CL C CONC (ABUT)(HPC)
CY 74.400 $1,100.000 $1,300.000 $1,179.810 $1,500.000
CL C CONC (CAP)(HPC)
CY 52.200 $1,200.000 $1,450.000 $1,290.730 $1,600.000
CL C CONC (COLUMN)(HPC)
CY 13.500 $1,500.000 $1,200.000 $3,247.070 $2,500.000
CL C CONC (RAIL FOUNDATION)
CY 19.000 $1,000.000 $750.000 $1,202.910 $750.000
REINF CONC SLAB (HPC)
SF 12,482.000 $21.000 $25.000 $31.020 $30.000
APPROACH SLAB (HPC)
CY 98.200 $700.000 $650.000 $528.680 $1,000.000
PRESTR CONC GIRDER (TX46)
LF 1,754.640 $235.000 $280.000 $304.110 $300.000
RIPRAP (CONC)(4 IN)
CY 1.000 $750.000 $550.000 $1,012.420 $2,100.000
RIPRAP (MOW STRIP)(5 IN)
CY 20.000 $870.000 $550.000 $639.830 $800.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 1,611.000 $150.000 $320.000 $218.160 $275.000
STR STEEL (MISC NON-BRIDGE)
LB 455.000 $60.000 $30.000 $22.260 $30.000
RAIL (TY C223)(HPC)
LF 747.900 $230.000 $135.000 $182.340 $200.000
RAIL (TY PR11)
LF 592.100 $155.000 $155.000 $119.270 $150.000
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 117.000 $155.000 $150.000 $191.550 $200.000
CONC BOX CULV (6 FT X 4 FT)
LF 116.000 $650.000 $785.000 $669.490 $550.000
WINGWALL (FW - 0) (HW=9 FT)
EA 1.000 $25,000.000 $65,000.000 $18,209.150 $16,500.000
WINGWALL (SW - 0) (HW=6 FT)
EA 1.000 $12,000.000 $55,000.000 $13,829.940 $11,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $60,000.000 $25,000.000 $47,852.690 $100,000.000
MOBILIZATION
LS 1.000 $400,000.000 $700,000.000 $906,007.690 $950,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $7,000.000 $10,000.000 $6,156.120 $31,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $8,000.000 $5,000.000 $20,212.500 $20,000.000
TMA (STATIONARY)
DAY 234.000 $200.000 $250.000 $272.580 $10.000
TMA (MOBILE OPERATION)
DAY 4.000 $250.000 $450.000 $1,322.330 $1,100.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 10.000 $110.000 $50.000 $165.000 $159.750
ROCK FILTER DAMS (REMOVE)
LF 10.000 $15.000 $5.000 $60.500 $58.580
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 225.000 $25.000 $30.000 $54.290 $52.560
CONSTRUCTION EXITS (REMOVE)
SY 225.000 $10.000 $10.000 $24.200 $23.430
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,088.000 $5.000 $4.000 $3.410 $3.300
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,088.000 $1.500 $1.000 $1.490 $1.440
CONSTRUCTING DETOURS
SY 1,862.000 $100.000 $95.000 $77.770 $95.850
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 140.000 $80.000 $65.000 $118.520 $100.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $120.000 $65.000 $120.320 $200.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 140.000 $40.000 $20.000 $22.540 $50.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $15.000 $20.000 $23.640 $100.000
CONC SIDEWALKS (5")
SY 506.000 $100.000 $75.000 $64.300 $100.000
MTL W-BEAM GD FEN (TIM POST)
LF 150.000 $25.000 $30.000 $27.500 $26.630
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,300.000 $1,300.000 $1,320.000 $3,256.280
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,375.000 $1,300.000 $1,320.000 $1,278.000
REMOVE METAL BEAM GUARD FENCE
LF 609.000 $2.500 $10.000 $3.300 $3.200
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,300.000 $3,500.000 $3,300.000 $3,195.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $250.000 $300.000 $275.000 $266.250
WIRE FENCE (TY C)
LF 351.000 $30.000 $15.000 $15.590 $26.630
GATE (TY 1)
EA 1.000 $1,500.000 $2,500.000 $2,145.000 $2,662.500
WIRE FENCE (REMOVE)
LF 351.000 $3.000 $1.000 $3.030 $10.650
TEMP RD IL SETUP AND REMOVE
EA 2.000 $8,000.000 $15,000.000 $3,080.000 $16,000.000
TEMP RD IL MAINTAIN SYSTEM
MO 26.000 $400.000 $8,150.000 $1,045.000 $300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $825.000 $750.000 $819.500 $798.750
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 2.000 $600.000 $500.000 $753.500 $559.130
REMOVE SM RD SN SUP&AM
EA 1.000 $125.000 $350.000 $159.500 $159.750
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 10.000 $22.000 $30.000 $22.000 $21.300
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $27.500 $30.000 $27.500 $26.630
INSTL OM ASSM (OM-2Z)(WFLX)SRFLL(BI)
EA 2.000 $124.000 $100.000 $71.500 $69.230
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 1,415.000 $0.200 $2.000 $2.090 $1.500
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 1,400.000 $0.200 $2.000 $2.090 $1.500
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 298.000 $1.250 $5.000 $2.090 $6.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 323.000 $1.250 $5.000 $2.090 $6.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 200.000 $1.000 $20.000 $4.400 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 200.000 $1.000 $20.000 $4.400 $5.000
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 1,540.000 $1.000 $5.000 $1.430 $6.000
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 1,540.000 $1.000 $5.000 $1.430 $6.000
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 2,164.000 $2.000 $2.000 $2.590 $1.500
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 2,164.000 $2.000 $2.000 $2.590 $1.500
PAVEMENT SLER 6"
LF 4,328.000 $0.500 $1.000 $0.110 $0.550
REFL PAV MRKR TY II-A-A
EA 27.000 $12.000 $15.000 $9.900 $10.000
ELIM EXT PM & MRKS (4")
LF 1,724.000 $1.000 $2.000 $2.420 $1.100
ELIM EXT PM & MRKRS (PLOWABLE RPMS)
EA 46.000 $1.000 $6.000 $5.500 $3.250
PAV SURF PREP FOR MRK (6")
LF 4,328.000 $0.600 $1.000 $0.110 $0.450
PAV SURF PREP FOR MRK (RPM)
EA 27.000 $2.000 $1.000 $0.110 $1.100
TIP TESTING(DRILL SHAFT)
EA 4.000 $22,000.000 $15,000.000 $4,510.000 $4,500.000
INSTALL FTB
LF 44.000 $50.000 $200.000 $186.840 $200.000
REMOVE FTB
LF 44.000 $4.000 $10.000 $88.000 $75.000
54" FRP GRAVITY SEWER PIPE, OPEN CUT
LF 982.000 $675.000 $1,400.000 $1,507.000 $1,459.050
5' DIA. VENTED DROP FRP MANHOLE
EA 1.000 $45,000.000 $25,400.000 $99,000.000 $95,850.000
5' DIA. VENTED FRP MANHOLE
EA 1.000 $40,000.000 $35,000.000 $93,500.000 $90,525.000
5' DIA. T-BASE FRP MANHOLE
EA 1.000 $40,000.000 $30,000.000 $88,000.000 $85,200.000
POINT OF ENTRY CONNECTION
LS 1.000 $25,000.000 $25,000.000 $49,500.000 $47,925.000
TIE-IN CONNECTIONS
LS 1.000 $35,000.000 $10,500.000 $44,000.000 $42,600.000
DECOMMISSION MANHOLE
EA 6.000 $5,000.000 $1,500.000 $4,400.000 $4,260.000
DECOMMISSION PIPES
LF 1,001.000 $100.000 $50.000 $330.000 $319.500
DEWATRING AND GROUNDWATER CONTROL
LS 1.000 $35,000.000 $35,000.000 $82,500.000 $79,875.000
TEMPORARY COFFERDAM AND FLOW DIVERSION
LS 1.000 $150,000.000 $3,000.000 $137,500.000 $133,125.000
TRENCH SAFETY
LF 982.000 $25.000 $10.000 $22.000 $21.300
STORM WATER POLLUTION PREVENTION PLAN
LS 1.000 $10,000.000 $50,000.000 $19,800.000 $19,561.230
BANK STABILIZATION
CY 2,543.000 $100.000 $12.000 $279.400 $391.920
HYDROMULCH
AC 1.000 $6,000.000 $3,000.000 $4,620.000 $41,013.150
WATERLINE SUPPORT
EA 2.000 $20,000.000 $4,500.000 $5,500.000 $5,325.000
PAVEMENT RESTORATION
LF 90.000 $750.000 $200.000 $605.000 $585.750
1
TEMPORARY BYPASS PUMPING
LS 1.000 $60,000.000 $0.000 $621,500.000 $601,725.000
1A
FLOW ISOLATION AND BYPASS PUMPING
LS 1.000 $60,000.000 $65,000.000 $0.000 $0.000
Totals: $5,147,705.450 $7,071,177.700 $8,292,005.167 $9,967,742.905
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $30,000.00