PREPARING ROW
|
STA
|
8.020
|
$10,000.000
|
$4,916.770
|
$8,000.000
|
$21,000.000
|
$33,250.000
|
$20,000.000
|
$12,763.270
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
71.000
|
$15.000
|
$43.000
|
$33.000
|
$25.000
|
$25.000
|
$8.000
|
$17.610
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
135.000
|
$25.000
|
$20.000
|
$22.000
|
$25.000
|
$17.000
|
$24.000
|
$28.160
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
557.000
|
$20.000
|
$25.000
|
$22.000
|
$12.500
|
$13.000
|
$9.000
|
$13.020
|
|
|
REMOVING CONC (FLUME)
|
SY
|
22.000
|
$20.000
|
$30.000
|
$55.000
|
$50.000
|
$35.000
|
$59.000
|
$95.720
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
317.000
|
$17.000
|
$60.000
|
$120.000
|
$50.000
|
$84.000
|
$45.000
|
$31.910
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY D)
|
CY
|
317.000
|
$15.000
|
$40.000
|
$132.000
|
$50.000
|
$33.000
|
$35.000
|
$63.820
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
189.000
|
$25.000
|
$45.000
|
$132.000
|
$150.000
|
$60.000
|
$55.000
|
$63.820
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
3,405.000
|
$2.500
|
$3.500
|
$9.000
|
$2.500
|
$2.450
|
$8.000
|
$2.300
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
780.000
|
$1.000
|
$3.750
|
$4.000
|
$3.500
|
$3.550
|
$3.000
|
$1.600
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
2,625.000
|
$1.000
|
$1.200
|
$2.000
|
$1.000
|
$1.050
|
$1.100
|
$1.150
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
1,703.000
|
$1.000
|
$1.750
|
$2.000
|
$1.500
|
$1.600
|
$1.600
|
$0.980
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
1,703.000
|
$1.000
|
$1.750
|
$2.000
|
$1.500
|
$1.600
|
$1.600
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
34.000
|
$20.000
|
$52.000
|
$300.000
|
$200.000
|
$189.830
|
$300.000
|
$127.630
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
803.000
|
$5.000
|
$1.600
|
$5.000
|
$2.000
|
$1.500
|
$3.500
|
$2.010
|
|
|
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
|
CY
|
464.000
|
$70.000
|
$120.000
|
$143.000
|
$150.000
|
$93.000
|
$160.000
|
$133.520
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
18.000
|
$275.000
|
$400.000
|
$500.000
|
$400.000
|
$280.000
|
$288.000
|
$309.420
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
1,030.000
|
$12.000
|
$5.000
|
$17.000
|
$30.000
|
$16.000
|
$22.000
|
$5.750
|
|
|
SALV, HAUL & STKPL RCL APH PV (6 TO 8")
|
SY
|
2,384.000
|
$6.500
|
$11.000
|
$10.000
|
$14.000
|
$11.000
|
$11.000
|
$12.760
|
|
|
SALV, HAUL STKPL RCL ASPH PAV(0"TO 24")
|
SY
|
54.000
|
$20.000
|
$35.000
|
$10.000
|
$21.000
|
$50.000
|
$10.000
|
$63.820
|
|
|
PRIME COAT (MC-30 OR EC-30)
|
GAL
|
692.000
|
$15.000
|
$11.000
|
$11.000
|
$10.000
|
$9.500
|
$6.000
|
$3.860
|
|
|
CEM STABIL BKFL
|
CY
|
172.000
|
$175.000
|
$300.000
|
$280.000
|
$300.000
|
$130.000
|
$380.000
|
$144.020
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,240.000
|
$65.000
|
$45.000
|
$22.000
|
$1.000
|
$19.000
|
$5.000
|
$28.150
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
100.000
|
$125.000
|
$225.000
|
$200.000
|
$165.000
|
$175.000
|
$234.000
|
$357.370
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
1,536.000
|
$200.000
|
$235.000
|
$225.000
|
$210.000
|
$250.000
|
$265.000
|
$372.450
|
|
|
CL A CONC (FLUME)
|
CY
|
9.000
|
$1,000.000
|
$500.000
|
$1,400.000
|
$1,500.000
|
$660.000
|
$1,160.000
|
$1,297.210
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
52.000
|
$1,200.000
|
$1,100.000
|
$3,000.000
|
$3,000.000
|
$1,125.000
|
$2,600.000
|
$2,276.440
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
51.000
|
$1,200.000
|
$1,700.000
|
$3,000.000
|
$3,000.000
|
$2,100.000
|
$2,650.000
|
$1,880.730
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
28.800
|
$1,000.000
|
$1,500.000
|
$3,000.000
|
$3,000.000
|
$2,110.000
|
$2,200.000
|
$1,401.770
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
10,880.000
|
$25.000
|
$19.000
|
$21.000
|
$30.000
|
$23.500
|
$18.000
|
$61.770
|
|
|
APPROACH SLAB (HPC)
|
CY
|
108.000
|
$650.000
|
$800.000
|
$1,100.000
|
$850.000
|
$613.000
|
$1,100.000
|
$1,897.640
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
632.020
|
$280.000
|
$260.000
|
$275.000
|
$250.000
|
$237.000
|
$330.000
|
$414.380
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
1,580.060
|
$280.000
|
$270.000
|
$275.000
|
$250.000
|
$228.000
|
$340.000
|
$336.870
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
10.000
|
$500.000
|
$800.000
|
$1,700.000
|
$700.000
|
$790.000
|
$1,500.000
|
$537.840
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
435.000
|
$155.000
|
$208.000
|
$240.000
|
$175.000
|
$132.000
|
$235.000
|
$206.050
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
6.000
|
$675.000
|
$525.000
|
$1,100.000
|
$750.000
|
$828.000
|
$1,170.000
|
$543.370
|
|
|
RIPRAP (MOW STRIP)(6 IN)
|
CY
|
18.000
|
$1,040.000
|
$560.000
|
$1,100.000
|
$750.000
|
$690.000
|
$1,100.000
|
$655.310
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
462.000
|
$15.000
|
$25.000
|
$35.000
|
$25.000
|
$23.000
|
$30.000
|
$41.350
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
130.000
|
$185.000
|
$190.000
|
$160.000
|
$200.000
|
$179.000
|
$388.000
|
$168.510
|
|
|
RAIL (TY C221)(HPC)
|
LF
|
400.000
|
$120.000
|
$235.000
|
$220.000
|
$150.000
|
$140.000
|
$255.000
|
$186.110
|
|
|
RAIL (TY PR11)
|
LF
|
372.000
|
$150.000
|
$155.000
|
$150.000
|
$111.000
|
$120.000
|
$125.000
|
$303.770
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
195.000
|
$120.000
|
$120.000
|
$150.000
|
$150.000
|
$116.000
|
$140.000
|
$153.390
|
|
|
CONC BOX CULV (6 FT X 6 FT)
|
LF
|
136.000
|
$1,000.000
|
$890.000
|
$900.000
|
$800.000
|
$815.000
|
$1,050.000
|
$1,358.010
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
235.000
|
$250.000
|
$275.000
|
$200.000
|
$200.000
|
$140.000
|
$350.000
|
$280.790
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
1.000
|
$7,500.000
|
$6,900.000
|
$7,500.000
|
$11,500.000
|
$5,800.000
|
$10,800.000
|
$8,806.660
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
1.000
|
$8,000.000
|
$8,700.000
|
$8,000.000
|
$18,200.000
|
$6,200.000
|
$10,700.000
|
$10,670.090
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$20,000.000
|
$32,000.000
|
$42,000.000
|
$55,000.000
|
$49,000.000
|
$53,000.000
|
$64,979.210
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$6,500.000
|
$5,000.000
|
$5,000.000
|
$4,100.000
|
$4,300.000
|
$9,200.000
|
$5,756.230
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
1.000
|
$2,000.000
|
$1,500.000
|
$2,500.000
|
$2,500.000
|
$2,200.000
|
$5,300.000
|
$1,892.140
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$71,600.000
|
$15,000.000
|
$15,000.000
|
$25,000.000
|
$100,000.000
|
$38,000.000
|
$21,719.910
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,050.000
|
$2,000.000
|
$2,500.000
|
$1,500.000
|
$1,000.000
|
$3,000.000
|
$687.990
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$90,000.000
|
$77,000.000
|
$60,000.000
|
$125,000.000
|
$450,000.000
|
$190,000.000
|
$208,424.190
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$281,642.000
|
$380,000.000
|
$391,000.000
|
$348,000.000
|
$440,000.000
|
$328,400.000
|
$510,530.780
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$15,000.000
|
$15,000.000
|
$3,500.000
|
$9,000.000
|
$30,000.000
|
$15,000.000
|
$15,315.920
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
190.000
|
$50.000
|
$70.000
|
$45.000
|
$40.000
|
$36.000
|
$38.000
|
$53.370
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
190.000
|
$20.000
|
$30.000
|
$30.000
|
$20.000
|
$19.000
|
$27.000
|
$12.770
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
225.000
|
$25.000
|
$46.000
|
$50.000
|
$20.000
|
$25.000
|
$42.000
|
$30.680
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
225.000
|
$15.000
|
$12.000
|
$30.000
|
$10.000
|
$10.000
|
$27.000
|
$9.670
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
482.000
|
$3.000
|
$5.000
|
$8.000
|
$5.000
|
$1.900
|
$5.000
|
$3.920
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
482.000
|
$1.000
|
$2.000
|
$3.000
|
$1.000
|
$0.840
|
$1.350
|
$0.930
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
44.000
|
$7.000
|
$10.000
|
$25.000
|
$12.000
|
$3.750
|
$18.000
|
$5.810
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
44.000
|
$2.000
|
$2.000
|
$20.000
|
$2.000
|
$1.000
|
$12.000
|
$1.730
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
780.000
|
$45.000
|
$65.000
|
$75.000
|
$30.000
|
$60.000
|
$87.000
|
$95.530
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$65.000
|
$90.000
|
$75.000
|
$60.000
|
$60.000
|
$87.000
|
$95.530
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
440.000
|
$10.000
|
$11.000
|
$25.000
|
$10.000
|
$9.000
|
$20.000
|
$28.340
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$12.000
|
$14.000
|
$25.000
|
$20.000
|
$9.000
|
$20.000
|
$28.340
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
780.000
|
$10.000
|
$20.000
|
$30.000
|
$15.000
|
$11.000
|
$23.000
|
$17.700
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$12.000
|
$36.000
|
$30.000
|
$30.000
|
$11.000
|
$23.000
|
$17.700
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
560.000
|
$65.000
|
$29.000
|
$35.000
|
$75.000
|
$30.000
|
$40.000
|
$32.610
|
|
|
CONC SIDEWALKS (4")
|
SY
|
182.000
|
$75.000
|
$89.000
|
$95.000
|
$100.000
|
$66.000
|
$145.000
|
$65.830
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
200.000
|
$35.000
|
$27.000
|
$24.000
|
$21.000
|
$20.000
|
$22.000
|
$30.790
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
8.000
|
$1,900.000
|
$1,290.000
|
$1,100.000
|
$997.500
|
$950.000
|
$1,045.000
|
$1,581.300
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,925.000
|
$1,420.000
|
$1,300.000
|
$1,102.500
|
$1,050.000
|
$1,155.000
|
$1,675.460
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
446.000
|
$3.500
|
$4.000
|
$6.000
|
$3.150
|
$3.000
|
$3.300
|
$2.780
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$4,275.000
|
$3,800.000
|
$3,100.000
|
$2,940.000
|
$2,800.000
|
$3,080.000
|
$3,869.450
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$725.000
|
$1,050.000
|
$1,000.000
|
$945.000
|
$900.000
|
$550.000
|
$748.120
|
|
|
IN SM RD SN SUP&AM TYFRP(1)UA(P)
|
EA
|
1.000
|
$750.000
|
$815.000
|
$90.000
|
$1,575.000
|
$75.000
|
$715.000
|
$797.880
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$165.000
|
$69.000
|
$200.000
|
$78.750
|
$100.000
|
$150.000
|
$167.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
6.000
|
$40.000
|
$27.000
|
$90.000
|
$21.000
|
$20.000
|
$22.000
|
$38.670
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$40.000
|
$27.000
|
$90.000
|
$21.260
|
$20.250
|
$22.300
|
$29.450
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
4.000
|
$75.000
|
$6.000
|
$70.000
|
$5.250
|
$5.000
|
$5.500
|
$28.450
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
12.000
|
$40.000
|
$30.000
|
$90.000
|
$26.250
|
$25.000
|
$27.500
|
$32.880
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$40.000
|
$34.000
|
$90.000
|
$26.780
|
$25.500
|
$28.000
|
$39.400
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,938.000
|
$1.250
|
$1.000
|
$1.500
|
$1.020
|
$0.970
|
$1.400
|
$1.390
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
107.000
|
$10.000
|
$12.000
|
$13.000
|
$11.550
|
$11.000
|
$15.000
|
$5.110
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
4,110.000
|
$1.250
|
$1.000
|
$1.500
|
$1.020
|
$0.970
|
$1.400
|
$1.390
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
467.000
|
$1.500
|
$1.000
|
$1.500
|
$0.840
|
$0.800
|
$1.500
|
$0.660
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
539.000
|
$1.500
|
$1.000
|
$1.500
|
$0.840
|
$0.800
|
$1.600
|
$0.660
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
4,354.000
|
$1.500
|
$0.900
|
$1.000
|
$0.690
|
$0.660
|
$1.600
|
$0.640
|
|
|
PAVEMENT SEALER 4"
|
LF
|
5,360.000
|
$0.750
|
$0.400
|
$0.500
|
$0.370
|
$0.350
|
$0.060
|
$0.260
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
55.000
|
$5.000
|
$11.000
|
$12.000
|
$10.500
|
$10.000
|
$6.600
|
$5.620
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,311.000
|
$1.250
|
$1.000
|
$2.000
|
$1.050
|
$1.000
|
$1.100
|
$1.140
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
5,360.000
|
$0.750
|
$0.700
|
$1.000
|
$0.680
|
$0.650
|
$0.060
|
$0.320
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
55.000
|
$2.000
|
$0.500
|
$1.000
|
$0.530
|
$0.500
|
$0.550
|
$0.630
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
2.000
|
$10,000.000
|
$8,000.000
|
$10,000.000
|
$20,000.000
|
$10,000.000
|
$6,000.000
|
$6,895.970
|
|
|
TACK COAT
|
GAL
|
613.000
|
$5.000
|
$14.000
|
$11.000
|
$10.000
|
$9.800
|
$6.000
|
$4.240
|
|
|
D-GR HMA TY-C PG 70-28 (EXEMPT)
|
TON
|
1,189.000
|
$180.000
|
$244.000
|
$200.000
|
$200.000
|
$170.400
|
$175.000
|
$191.450
|
|
|
D-GR HMA TY-D PG70-22(LEVEL-UP)(EXEMPT)
|
TON
|
222.000
|
$150.000
|
$244.000
|
$200.000
|
$200.000
|
$170.400
|
$220.000
|
$223.360
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
765.000
|
$165.000
|
$102.000
|
$25.000
|
$75.000
|
$71.000
|
$75.000
|
$107.400
|
|
|
TMA (STATIONARY)
|
DAY
|
285.000
|
$200.000
|
$475.000
|
$50.000
|
$157.500
|
$292.000
|
$180.000
|
$200.980
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
3.000
|
$550.000
|
$1,155.000
|
$250.000
|
$750.000
|
$670.000
|
$300.000
|
$360.740
|
|
Totals: |
$3,578,676.650
|
$3,861,246.795
|
$3,918,306.000
|
$3,995,438.630
|
$4,417,963.720
|
$4,428,457.950
|
$5,279,025.861
|