Job Info for 0902-90-125

County: TARRANT Highway: CS Date: 01/06/2023 (1 year ago) Engineer's Estimate: $3,578,677 Control Number: 0902-90-125
Project: BR 2022(252) District: FORT WORTH Time: 217 WORKING DAYS Type: BRIDGE REPLACEMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,578,676.65
INDUS ROAD & BRIDGE, INC.   $3,861,246.79 1
7.9% | $282,570.14
IBCTX, LLC   $3,918,306.00 2
9.49% | $339,629.35
1.48% | $57,059.21
ED BELL CONSTRUCTION COMPANY   $3,995,438.63 3
11.65% | $416,761.98
3.48% | $134,191.84
1.97% | $77,132.63
RAGLE CONSTRUCTION, INC.   $4,417,963.72 4
23.45% | $839,287.07
14.42% | $556,716.93
10.58% | $422,525.09
REBCON, LLC   $4,428,457.95 5
23.75% | $849,781.30
14.69% | $567,211.16
0.24% | $10,494.23
ALTUS CONSTRUCTION LLC   $5,279,025.84 6
47.51% | $1,700,349.19
36.72% | $1,417,779.05
19.21% | $850,567.89
Subcontractor Percentage Amount
REYNOLDS ASPHALT & CONSTRUCTION COMPANY 6.55% $252,911.66
TEXAS SHAFTS, INC. 6.40% $247,119.79
HERMANOS STEEL, LLC 3.85% $148,658.00
FORTSON CONTRACTING, INC. 0.75% $28,959.35
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 0.62% $23,939.73
KING GEORGE TRAFFIC SOLUTIONS LLC 0.54% $20,850.73
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.51% $19,692.36
A BROTHERS MILLING, LLC 0.43% $16,603.36
TNT CRANE & RIGGING, INC. 0.31% $11,969.87
FC TRAFFIC CONTROL, INC. 0.25% $9,653.12
C. GREEN SCAPING, L.P. 0.21% $8,108.62
SOUTHEAST GRINDING AND GROOVING LLC 0.21% $8,108.62
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.01% $386.12
PROFESSIONAL SERVICE INDUSTRIES, INC. 0.00% $0.00
HILBASH INVESTMENT LLC 0.00% $0.00
DAVIS MOTOR CRANE SERVICE, INC. 0.00% $0.00
VISTA RIDGE CONCRETE PUMPING, INC. 0.00% $0.00
KING & GEORGE, LLC 0.00% $0.00
Total: 20.64% $796,961.33

Bid Items

Items: 101, 0 filtered
TARRANT CS  |  FORT WORTH  |  0902-90-125  |  01/06/2023  |  $3,578,677  |  BR 2022(252)  |  BRIDGE REPL  |  217 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate INDUS ROAD & BRIDGE, INC. IBCTX, LLC ED BELL CONSTRUCTION COMPANY RAGLE CONSTRUCTION, INC. REBCON, LLC ALTUS CONSTRUCTION LLC
100 6002 PREPARING ROW STA 8.020 $10,000.000 $4,916.770 $8,000.000 $21,000.000 $33,250.000 $20,000.000 $12,763.270
104 6009 REMOVING CONC (RIPRAP) SY 71.000 $15.000 $43.000 $33.000 $25.000 $25.000 $8.000 $17.610
104 6015 REMOVING CONC (SIDEWALKS) SY 135.000 $25.000 $20.000 $22.000 $25.000 $17.000 $24.000 $28.160
104 6022 REMOVING CONC (CURB AND GUTTER) LF 557.000 $20.000 $25.000 $22.000 $12.500 $13.000 $9.000 $13.020
104 6044 REMOVING CONC (FLUME) SY 22.000 $20.000 $30.000 $55.000 $50.000 $35.000 $59.000 $95.720
110 6001 EXCAVATION (ROADWAY) CY 317.000 $17.000 $60.000 $120.000 $50.000 $84.000 $45.000 $31.910
132 6008 EMBANKMENT (FINAL)(DENS CONT)(TY D) CY 317.000 $15.000 $40.000 $132.000 $50.000 $33.000 $35.000 $63.820
132 6026 EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY 189.000 $25.000 $45.000 $132.000 $150.000 $60.000 $55.000 $63.820
161 6017 COMPOST MANUF TOPSOIL (4") SY 3,405.000 $2.500 $3.500 $9.000 $2.500 $2.450 $8.000 $2.300
164 6023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 780.000 $1.000 $3.750 $4.000 $3.500 $3.550 $3.000 $1.600
164 6027 CELL FBR MLCH SEED(PERM)(URBAN)(CLAY) SY 2,625.000 $1.000 $1.200 $2.000 $1.000 $1.050 $1.100 $1.150
164 6029 CELL FBR MLCH SEED(TEMP)(WARM) SY 1,703.000 $1.000 $1.750 $2.000 $1.500 $1.600 $1.600 $0.980
164 6031 CELL FBR MLCH SEED(TEMP)(COOL) SY 1,703.000 $1.000 $1.750 $2.000 $1.500 $1.600 $1.600 $1.000
168 6001 VEGETATIVE WATERING MG 34.000 $20.000 $52.000 $300.000 $200.000 $189.830 $300.000 $127.630
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 803.000 $5.000 $1.600 $5.000 $2.000 $1.500 $3.500 $2.010
247 6236 FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS) CY 464.000 $70.000 $120.000 $143.000 $150.000 $93.000 $160.000 $133.520
260 6002 LIME (HYDRATED LIME (SLURRY)) TON 18.000 $275.000 $400.000 $500.000 $400.000 $280.000 $288.000 $309.420
260 6027 LIME TRT (EXST MATL)(8") SY 1,030.000 $12.000 $5.000 $17.000 $30.000 $16.000 $22.000 $5.750
305 6005 SALV, HAUL & STKPL RCL APH PV (6 TO 8") SY 2,384.000 $6.500 $11.000 $10.000 $14.000 $11.000 $11.000 $12.760
305 6020 SALV, HAUL STKPL RCL ASPH PAV(0"TO 24") SY 54.000 $20.000 $35.000 $10.000 $21.000 $50.000 $10.000 $63.820
310 6028 PRIME COAT (MC-30 OR EC-30) GAL 692.000 $15.000 $11.000 $11.000 $10.000 $9.500 $6.000 $3.860
400 6005 CEM STABIL BKFL CY 172.000 $175.000 $300.000 $280.000 $300.000 $130.000 $380.000 $144.020
403 6001 TEMPORARY SPL SHORING SF 1,240.000 $65.000 $45.000 $22.000 $1.000 $19.000 $5.000 $28.150
416 6001 DRILL SHAFT (18 IN) LF 100.000 $125.000 $225.000 $200.000 $165.000 $175.000 $234.000 $357.370
416 6002 DRILL SHAFT (24 IN) LF 1,536.000 $200.000 $235.000 $225.000 $210.000 $250.000 $265.000 $372.450
420 6007 CL A CONC (FLUME) CY 9.000 $1,000.000 $500.000 $1,400.000 $1,500.000 $660.000 $1,160.000 $1,297.210
420 6014 CL C CONC (ABUT)(HPC) CY 52.000 $1,200.000 $1,100.000 $3,000.000 $3,000.000 $1,125.000 $2,600.000 $2,276.440
420 6030 CL C CONC (CAP)(HPC) CY 51.000 $1,200.000 $1,700.000 $3,000.000 $3,000.000 $2,100.000 $2,650.000 $1,880.730
420 6038 CL C CONC (COLUMN)(HPC) CY 28.800 $1,000.000 $1,500.000 $3,000.000 $3,000.000 $2,110.000 $2,200.000 $1,401.770
422 6002 REINF CONC SLAB (HPC) SF 10,880.000 $25.000 $19.000 $21.000 $30.000 $23.500 $18.000 $61.770
422 6016 APPROACH SLAB (HPC) CY 108.000 $650.000 $800.000 $1,100.000 $850.000 $613.000 $1,100.000 $1,897.640
425 6011 PRESTR CONC SLAB BEAM (4SB15) LF 632.020 $280.000 $260.000 $275.000 $250.000 $237.000 $330.000 $414.380
425 6012 PRESTR CONC SLAB BEAM (5SB15) LF 1,580.060 $280.000 $270.000 $275.000 $250.000 $228.000 $340.000 $336.870
432 6008 RIPRAP (CONC)(CL B)(RR8&RR9) CY 10.000 $500.000 $800.000 $1,700.000 $700.000 $790.000 $1,500.000 $537.840
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 435.000 $155.000 $208.000 $240.000 $175.000 $132.000 $235.000 $206.050
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 6.000 $675.000 $525.000 $1,100.000 $750.000 $828.000 $1,170.000 $543.370
432 6047 RIPRAP (MOW STRIP)(6 IN) CY 18.000 $1,040.000 $560.000 $1,100.000 $750.000 $690.000 $1,100.000 $655.310
442 6007 STR STEEL (MISC NON - BRIDGE) LB 462.000 $15.000 $25.000 $35.000 $25.000 $23.000 $30.000 $41.350
450 6007 RAIL (TY T223)(HPC) LF 130.000 $185.000 $190.000 $160.000 $200.000 $179.000 $388.000 $168.510
450 6031 RAIL (TY C221)(HPC) LF 400.000 $120.000 $235.000 $220.000 $150.000 $140.000 $255.000 $186.110
450 6103 RAIL (TY PR11) LF 372.000 $150.000 $155.000 $150.000 $111.000 $120.000 $125.000 $303.770
454 6004 ARMOR JOINT (SEALED) LF 195.000 $120.000 $120.000 $150.000 $150.000 $116.000 $140.000 $153.390
462 6013 CONC BOX CULV (6 FT X 6 FT) LF 136.000 $1,000.000 $890.000 $900.000 $800.000 $815.000 $1,050.000 $1,358.010
464 6008 RC PIPE (CL III)(36 IN) LF 235.000 $250.000 $275.000 $200.000 $200.000 $140.000 $350.000 $280.790
465 6003 MANH (COMPL)(PRM)(60IN) EA 1.000 $7,500.000 $6,900.000 $7,500.000 $11,500.000 $5,800.000 $10,800.000 $8,806.660
465 6024 INLET (COMPL)(PCO)(5FT)(BOTH) EA 1.000 $8,000.000 $8,700.000 $8,000.000 $18,200.000 $6,200.000 $10,700.000 $10,670.090
466 6181 WINGWALL (PW - 1) (HW=6 FT) EA 2.000 $20,000.000 $32,000.000 $42,000.000 $55,000.000 $49,000.000 $53,000.000 $64,979.210
467 6451 SET (TY II) (36 IN) (RCP) (4: 1) (P) EA 1.000 $6,500.000 $5,000.000 $5,000.000 $4,100.000 $4,300.000 $9,200.000 $5,756.230
479 6004 ADJUSTING MANHOLES (SANITARY) EA 1.000 $2,000.000 $1,500.000 $2,500.000 $2,500.000 $2,200.000 $5,300.000 $1,892.140
496 6001 REMOV STR (BOX CULVERT) EA 1.000 $71,600.000 $15,000.000 $15,000.000 $25,000.000 $100,000.000 $38,000.000 $21,719.910
496 6002 REMOV STR (INLET) EA 1.000 $1,050.000 $2,000.000 $2,500.000 $1,500.000 $1,000.000 $3,000.000 $687.990
496 6010 REMOV STR (BRIDGE 100 - 499 FT LENGTH) EA 1.000 $90,000.000 $77,000.000 $60,000.000 $125,000.000 $450,000.000 $190,000.000 $208,424.190
500 6001 MOBILIZATION LS 1.000 $281,642.000 $380,000.000 $391,000.000 $348,000.000 $440,000.000 $328,400.000 $510,530.780
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 13.000 $15,000.000 $15,000.000 $3,500.000 $9,000.000 $30,000.000 $15,000.000 $15,315.920
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 190.000 $50.000 $70.000 $45.000 $40.000 $36.000 $38.000 $53.370
506 6011 ROCK FILTER DAMS (REMOVE) LF 190.000 $20.000 $30.000 $30.000 $20.000 $19.000 $27.000 $12.770
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 225.000 $25.000 $46.000 $50.000 $20.000 $25.000 $42.000 $30.680
506 6024 CONSTRUCTION EXITS (REMOVE) SY 225.000 $15.000 $12.000 $30.000 $10.000 $10.000 $27.000 $9.670
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 482.000 $3.000 $5.000 $8.000 $5.000 $1.900 $5.000 $3.920
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 482.000 $1.000 $2.000 $3.000 $1.000 $0.840 $1.350 $0.930
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 44.000 $7.000 $10.000 $25.000 $12.000 $3.750 $18.000 $5.810
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 44.000 $2.000 $2.000 $20.000 $2.000 $1.000 $12.000 $1.730
512 6009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 780.000 $45.000 $65.000 $75.000 $30.000 $60.000 $87.000 $95.530
512 6010 PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 80.000 $65.000 $90.000 $75.000 $60.000 $60.000 $87.000 $95.530
512 6033 PORT CTB (MOVE)(LOW PROF)(TY 1) LF 440.000 $10.000 $11.000 $25.000 $10.000 $9.000 $20.000 $28.340
512 6034 PORT CTB (MOVE)(LOW PROF)(TY 2) LF 80.000 $12.000 $14.000 $25.000 $20.000 $9.000 $20.000 $28.340
512 6057 PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 780.000 $10.000 $20.000 $30.000 $15.000 $11.000 $23.000 $17.700
512 6058 PORT CTB (REMOVE)(LOW PROF)(TY 2) LF 80.000 $12.000 $36.000 $30.000 $30.000 $11.000 $23.000 $17.700
529 6008 CONC CURB & GUTTER (TY II) LF 560.000 $65.000 $29.000 $35.000 $75.000 $30.000 $40.000 $32.610
531 6001 CONC SIDEWALKS (4") SY 182.000 $75.000 $89.000 $95.000 $100.000 $66.000 $145.000 $65.830
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 200.000 $35.000 $27.000 $24.000 $21.000 $20.000 $22.000 $30.790
540 6007 MTL BEAM GD FEN TRANS (TL2) EA 8.000 $1,900.000 $1,290.000 $1,100.000 $997.500 $950.000 $1,045.000 $1,581.300
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 4.000 $1,925.000 $1,420.000 $1,300.000 $1,102.500 $1,050.000 $1,155.000 $1,675.460
542 6001 REMOVE METAL BEAM GUARD FENCE LF 446.000 $3.500 $4.000 $6.000 $3.150 $3.000 $3.300 $2.780
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $4,275.000 $3,800.000 $3,100.000 $2,940.000 $2,800.000 $3,080.000 $3,869.450
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 1.000 $725.000 $1,050.000 $1,000.000 $945.000 $900.000 $550.000 $748.120
644 6023 IN SM RD SN SUP&AM TYFRP(1)UA(P) EA 1.000 $750.000 $815.000 $90.000 $1,575.000 $75.000 $715.000 $797.880
644 6076 REMOVE SM RD SN SUP&AM EA 4.000 $165.000 $69.000 $200.000 $78.750 $100.000 $150.000 $167.000
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 6.000 $40.000 $27.000 $90.000 $21.000 $20.000 $22.000 $38.670
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 6.000 $40.000 $27.000 $90.000 $21.260 $20.250 $22.300 $29.450
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 4.000 $75.000 $6.000 $70.000 $5.250 $5.000 $5.500 $28.450
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 12.000 $40.000 $30.000 $90.000 $26.250 $25.000 $27.500 $32.880
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 12.000 $40.000 $34.000 $90.000 $26.780 $25.500 $28.000 $39.400
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 3,938.000 $1.250 $1.000 $1.500 $1.020 $0.970 $1.400 $1.390
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 107.000 $10.000 $12.000 $13.000 $11.550 $11.000 $15.000 $5.110
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 4,110.000 $1.250 $1.000 $1.500 $1.020 $0.970 $1.400 $1.390
666 6167 REFL PAV MRK TY II (W) 4" (BRK) LF 467.000 $1.500 $1.000 $1.500 $0.840 $0.800 $1.500 $0.660
666 6170 REFL PAV MRK TY II (W) 4" (SLD) LF 539.000 $1.500 $1.000 $1.500 $0.840 $0.800 $1.600 $0.660
666 6207 REFL PAV MRK TY II (Y) 4" (SLD) LF 4,354.000 $1.500 $0.900 $1.000 $0.690 $0.660 $1.600 $0.640
666 6224 PAVEMENT SEALER 4" LF 5,360.000 $0.750 $0.400 $0.500 $0.370 $0.350 $0.060 $0.260
672 6009 REFL PAV MRKR TY II-A-A EA 55.000 $5.000 $11.000 $12.000 $10.500 $10.000 $6.600 $5.620
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 1,311.000 $1.250 $1.000 $2.000 $1.050 $1.000 $1.100 $1.140
678 6001 PAV SURF PREP FOR MRK (4") LF 5,360.000 $0.750 $0.700 $1.000 $0.680 $0.650 $0.060 $0.320
678 6033 PAV SURF PREP FOR MRK (RPM) EA 55.000 $2.000 $0.500 $1.000 $0.530 $0.500 $0.550 $0.630
680 6001 INSTALL HWY TRF SIG (FLASH BEACON) EA 2.000 $10,000.000 $8,000.000 $10,000.000 $20,000.000 $10,000.000 $6,000.000 $6,895.970
3076 6066 TACK COAT GAL 613.000 $5.000 $14.000 $11.000 $10.000 $9.800 $6.000 $4.240
3076 6073 D-GR HMA TY-C PG 70-28 (EXEMPT) TON 1,189.000 $180.000 $244.000 $200.000 $200.000 $170.400 $175.000 $191.450
3076 6082 D-GR HMA TY-D PG70-22(LEVEL-UP)(EXEMPT) TON 222.000 $150.000 $244.000 $200.000 $200.000 $170.400 $220.000 $223.360
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 765.000 $165.000 $102.000 $25.000 $75.000 $71.000 $75.000 $107.400
6185 6002 TMA (STATIONARY) DAY 285.000 $200.000 $475.000 $50.000 $157.500 $292.000 $180.000 $200.980
6185 6005 TMA (MOBILE OPERATION) DAY 3.000 $550.000 $1,155.000 $250.000 $750.000 $670.000 $300.000 $360.740
Totals: $3,578,676.65 $3,861,246.80 $3,918,306.00 $3,995,438.63 $4,417,963.72 $4,428,457.95 $5,279,025.86