CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
1,000.000
|
$0.290
|
$1.610
|
$3.500
|
$5.990
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
1,000.000
|
$0.330
|
$1.610
|
$3.500
|
$5.990
|
|
|
VEGETATIVE WATERING
|
MG
|
300.000
|
$16.000
|
$13.830
|
$102.250
|
$25.990
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
40.000
|
$160.000
|
$402.260
|
$308.000
|
$271.750
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
30.000
|
$215.000
|
$436.010
|
$376.000
|
$399.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
300.000
|
$335.000
|
$484.120
|
$355.000
|
$505.550
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
75.000
|
$420.000
|
$604.330
|
$474.000
|
$571.480
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
60.000
|
$875.000
|
$727.190
|
$498.000
|
$651.200
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
24.000
|
$280.000
|
$320.070
|
$210.000
|
$308.580
|
|
|
RIPRAP (CONC) (CL A )
|
CY
|
8.750
|
$495.480
|
$660.000
|
$1,910.000
|
$1,013.750
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
10.000
|
$480.000
|
$690.000
|
$1,970.000
|
$1,420.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$200,000.000
|
$340,608.000
|
$479,730.000
|
$530,065.320
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
36.000
|
$8,000.000
|
$2,542.000
|
$13,295.000
|
$10,252.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
250.000
|
$2.600
|
$3.750
|
$13.600
|
$5.260
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
250.000
|
$1.000
|
$1.110
|
$6.600
|
$2.090
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
250.000
|
$5.900
|
$3.750
|
$7.650
|
$9.110
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
250.000
|
$1.770
|
$1.300
|
$5.000
|
$2.380
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$20.000
|
$30.800
|
$26.200
|
$70.240
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$2,000.000
|
$3,300.000
|
$1,835.000
|
$2,203.750
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,100.000
|
$1,650.000
|
$1,110.000
|
$1,646.000
|
|
|
MTL W-BEAM GD FEN (NESTED)(TIM POST)
|
LF
|
25.000
|
$50.000
|
$30.800
|
$37.100
|
$67.460
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,700.000
|
$2,750.000
|
$3,000.000
|
$3,773.500
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
2.000
|
$31,000.000
|
$46,166.280
|
$34,875.000
|
$39,504.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
50.000
|
$8.400
|
$29.350
|
$15.000
|
$32.230
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
50.000
|
$24.730
|
$29.730
|
$35.000
|
$41.430
|
|
|
CONDT (PVC) (SCH 40) (2") (CONC ENCSE)
|
LF
|
50.000
|
$11.050
|
$30.140
|
$27.000
|
$33.960
|
|
|
CONDT (PVC) (SCH 40) (2") (STL ENCSE)
|
LF
|
25.000
|
$45.890
|
$33.670
|
$91.000
|
$89.660
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
1,000.000
|
$13.920
|
$28.690
|
$18.500
|
$35.630
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
100.000
|
$40.360
|
$31.130
|
$44.000
|
$46.790
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
50.000
|
$16.000
|
$37.750
|
$24.000
|
$38.140
|
|
|
CONDT (PVC) (SCH 40) (3") (STL ENCSE)
|
LF
|
25.000
|
$100.420
|
$44.240
|
$81.000
|
$92.350
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
50.000
|
$20.140
|
$28.810
|
$22.000
|
$44.030
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
50.000
|
$24.980
|
$37.130
|
$47.000
|
$57.830
|
|
|
CONDT (PVC) (SCH 40) (4") (CONC ENCSE)
|
LF
|
50.000
|
$27.000
|
$40.150
|
$33.000
|
$46.330
|
|
|
CONDT (PVC) (SCH 40) (4") (STL ENCSE)
|
LF
|
50.000
|
$70.140
|
$52.810
|
$111.000
|
$98.160
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
50.000
|
$7.650
|
$30.550
|
$17.000
|
$34.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
50.000
|
$20.430
|
$28.730
|
$43.000
|
$45.500
|
|
|
CONDT (PVC) (SCH 80) (2") (CONC ENCSE)
|
LF
|
50.000
|
$13.650
|
$31.060
|
$23.000
|
$36.300
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
50.000
|
$14.610
|
$30.010
|
$26.000
|
$41.470
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
100.000
|
$34.990
|
$36.950
|
$48.000
|
$55.870
|
|
|
CONDT (PVC) (SCH 80) (3") (CONC ENCSE)
|
LF
|
50.000
|
$15.290
|
$41.350
|
$28.000
|
$46.070
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
50.000
|
$17.810
|
$32.210
|
$32.000
|
$57.210
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
50.000
|
$31.720
|
$41.180
|
$55.000
|
$73.310
|
|
|
CONDT (RM) (2")
|
LF
|
50.000
|
$31.250
|
$38.790
|
$39.000
|
$52.220
|
|
|
CONDT (RM) (2") (BORE)
|
LF
|
50.000
|
$33.930
|
$35.930
|
$53.000
|
$68.320
|
|
|
CONDT (RM) (3")
|
LF
|
50.000
|
$40.690
|
$49.360
|
$102.000
|
$116.520
|
|
|
CONDT (RM) (3") (BORE)
|
LF
|
50.000
|
$32.650
|
$45.170
|
$71.000
|
$91.790
|
|
|
CONDT (RM) (4")
|
LF
|
50.000
|
$96.500
|
$65.280
|
$107.000
|
$95.070
|
|
|
CONDT (RM) (4") (BORE)
|
LF
|
50.000
|
$50.000
|
$68.170
|
$85.000
|
$115.770
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,000.000
|
$1.300
|
$3.590
|
$1.850
|
$2.250
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
300.000
|
$1.350
|
$3.610
|
$1.950
|
$2.320
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
100.000
|
$1.350
|
$4.310
|
$2.300
|
$2.750
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
300.000
|
$1.500
|
$4.460
|
$2.350
|
$2.820
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
100.000
|
$1.950
|
$4.860
|
$3.000
|
$3.550
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
300.000
|
$2.000
|
$5.200
|
$3.000
|
$3.560
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
100.000
|
$2.700
|
$5.560
|
$4.600
|
$4.630
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
300.000
|
$2.900
|
$5.820
|
$4.600
|
$4.600
|
|
|
ELEC CONDR (NO.1) BARE
|
LF
|
100.000
|
$2.950
|
$5.980
|
$5.250
|
$5.470
|
|
|
ELEC CONDR (NO.1) INSULATED
|
LF
|
300.000
|
$3.000
|
$6.240
|
$5.250
|
$5.470
|
|
|
ELEC CONDR (NO.1/0) BARE
|
LF
|
100.000
|
$3.600
|
$6.600
|
$6.250
|
$7.510
|
|
|
ELEC CONDR (NO.1/0) INSULATED
|
LF
|
300.000
|
$3.900
|
$6.910
|
$6.500
|
$7.770
|
|
|
ELEC CONDR (NO.2/0) BARE
|
LF
|
100.000
|
$5.950
|
$7.230
|
$7.250
|
$8.780
|
|
|
ELEC CONDR (NO.2/0) INSULATED
|
LF
|
300.000
|
$6.350
|
$7.540
|
$7.500
|
$9.070
|
|
|
ELEC CONDR (NO.3/0) BARE
|
LF
|
100.000
|
$4.900
|
$7.850
|
$8.550
|
$9.440
|
|
|
ELEC CONDR (NO.3/0) INSULATED
|
LF
|
300.000
|
$5.500
|
$8.160
|
$9.300
|
$10.330
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
10.000
|
$1,025.890
|
$1,383.950
|
$1,730.000
|
$1,526.200
|
|
|
REMOVE GROUND BOX
|
EA
|
10.000
|
$295.780
|
$554.490
|
$530.000
|
$812.500
|
|
|
ZINC-COAT STL WIRE STRAND (3/8")
|
LF
|
1,000.000
|
$4.410
|
$5.120
|
$6.000
|
$6.360
|
|
|
TIMBER POLE (CL 2) 40 FT
|
EA
|
10.000
|
$1,441.740
|
$910.800
|
$1,735.000
|
$1,751.250
|
|
|
TIMBER POLE (CL 2) 50 FT
|
EA
|
5.000
|
$1,792.930
|
$1,060.800
|
$2,240.000
|
$2,138.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$500.000
|
$802.800
|
$700.000
|
$1,855.000
|
|
|
ELC SRV TY D 120/240 070(NS)SS(N)SP(O)
|
EA
|
12.000
|
$6,100.000
|
$6,460.560
|
$6,975.000
|
$6,012.750
|
|
|
ELC SRV TY D 120/240 070(NS)SS(N)SP(U)
|
EA
|
2.000
|
$6,625.000
|
$5,791.160
|
$7,525.000
|
$5,437.750
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
1.000
|
$6,100.000
|
$6,460.560
|
$7,050.000
|
$6,053.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(U)
|
EA
|
1.000
|
$6,710.000
|
$5,724.940
|
$7,575.000
|
$5,478.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$100.000
|
$212.960
|
$400.000
|
$487.500
|
|
|
INS OH SN SUP(35 FT BAL TEE)
|
EA
|
3.000
|
$29,000.000
|
$39,446.400
|
$45,900.000
|
$35,670.500
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$4,000.000
|
$6,004.800
|
$6,500.000
|
$3,357.500
|
|
|
SIGN WALKWAY (48 IN) WITH HNDRL
|
LF
|
138.000
|
$345.000
|
$325.950
|
$180.000
|
$340.310
|
|
|
REMOVE SIGN WALKWAY
|
EA
|
1.000
|
$1,400.000
|
$5,784.860
|
$910.000
|
$650.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
6.000
|
$60.000
|
$55.000
|
$40.000
|
$74.550
|
|
REFL PAV MRKR TY I-R
|
EA
|
56.000
|
$10.000
|
$11.500
|
$16.000
|
$36.880
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
4.000
|
$100.000
|
$115.000
|
$80.000
|
$368.750
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
56.000
|
$1.000
|
$2.300
|
$1.000
|
$36.880
|
|
|
REMOVAL OF TIMBER POLES
|
EA
|
10.000
|
$500.000
|
$691.840
|
$800.000
|
$812.500
|
|
|
INSTALL CIRCUIT BREAKER
|
EA
|
1.000
|
$600.000
|
$690.600
|
$825.000
|
$325.000
|
|
|
REPLACE CIRCUIT BREAKER
|
EA
|
1.000
|
$500.000
|
$690.600
|
$910.000
|
$1,387.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
100.000
|
$188.980
|
$77.630
|
$177.000
|
$225.750
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
1,000.000
|
$3.800
|
$2.950
|
$7.250
|
$8.590
|
|
|
FO CBL (6 SMF)
|
LF
|
50.000
|
$2.300
|
$6.160
|
$46.950
|
$5.160
|
|
|
FO CBL (6 SMF)(AERIAL)
|
LF
|
50.000
|
$5.950
|
$14.830
|
$57.000
|
$14.610
|
|
|
FO CBL (6 SMF)(PIGTAIL)
|
LF
|
50.000
|
$13.610
|
$12.630
|
$48.000
|
$11.280
|
|
|
FO CBL (12 SMF)
|
LF
|
50.000
|
$6.000
|
$6.510
|
$51.000
|
$5.440
|
|
|
FO CBL (12 SMF)(AERIAL)
|
LF
|
50.000
|
$4.950
|
$16.270
|
$60.000
|
$15.760
|
|
|
FO CBL (12 SMF)(PIGTAIL)
|
LF
|
2,000.000
|
$12.510
|
$4.720
|
$4.500
|
$5.440
|
|
|
FO CBL (24 SMF)
|
LF
|
200.000
|
$2.780
|
$6.160
|
$17.500
|
$6.820
|
|
|
FO CBL (24 SMF)(AERIAL)
|
LF
|
100.000
|
$4.950
|
$14.520
|
$38.000
|
$15.760
|
|
|
FO CBL (36 SMF)
|
LF
|
35,000.000
|
$2.440
|
$4.470
|
$2.510
|
$4.670
|
|
|
FO CBL (36 SMF)(AERIAL)
|
LF
|
1,000.000
|
$4.950
|
$15.570
|
$9.850
|
$16.910
|
|
|
FO CBL (48 SMF)(AERIAL)
|
LF
|
100.000
|
$5.950
|
$15.620
|
$43.000
|
$16.910
|
|
|
FO CBL (72 SMF)
|
LF
|
100,000.000
|
$2.940
|
$5.270
|
$2.370
|
$5.640
|
|
|
FO CBL (72 SMF)(AERIAL)
|
LF
|
2,000.000
|
$5.130
|
$16.740
|
$12.650
|
$18.060
|
|
|
FO CBL (96 SMF)
|
LF
|
100.000
|
$7.000
|
$7.940
|
$68.750
|
$7.250
|
|
|
FO CBL (96 SMF)(AERIAL)
|
LF
|
50.000
|
$10.500
|
$16.930
|
$147.000
|
$18.060
|
|
|
FO CBL (144 SMF)
|
LF
|
100.000
|
$7.000
|
$12.040
|
$80.000
|
$11.970
|
|
|
FO CBL (144 SMF)(AERIAL)
|
LF
|
100.000
|
$10.300
|
$18.920
|
$86.000
|
$20.360
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
50.000
|
$2,123.060
|
$2,267.370
|
$2,205.000
|
$2,617.750
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)(AERIAL)
|
EA
|
1.000
|
$2,984.920
|
$2,455.250
|
$2,995.000
|
$2,617.750
|
|
|
FO SPLICE ENCLOSURE (TYPE 2)
|
EA
|
5.000
|
$1,747.530
|
$2,562.000
|
$2,965.000
|
$2,617.750
|
|
|
FO SPLICE ENCLOSURE (TYPE 2)(AERIAL)
|
EA
|
1.000
|
$2,400.000
|
$2,348.500
|
$3,735.000
|
$2,617.750
|
|
|
FO SPLICE ENCLOSURE (TYPE 3)
|
EA
|
1.000
|
$2,654.150
|
$2,562.000
|
$3,725.000
|
$2,617.750
|
|
|
FO SPLICE ENCLOSURE (TYPE 3)(AERIAL)
|
EA
|
1.000
|
$2,700.000
|
$2,348.500
|
$4,400.000
|
$2,617.750
|
|
|
RACK MOUNTED FO SPLICE ENCLOSURE
|
EA
|
5.000
|
$2,500.000
|
$3,450.000
|
$5,670.000
|
$3,612.500
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
1,000.000
|
$57.630
|
$46.000
|
$60.500
|
$46.000
|
|
|
FIBER OPTIC PATCH PANEL (6 POSITION)
|
EA
|
1.000
|
$1,310.000
|
$1,380.000
|
$1,100.000
|
$1,542.500
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
1.000
|
$450.000
|
$1,840.000
|
$1,400.000
|
$2,002.500
|
|
|
FIBER OPTIC PATCH PANEL (24 POSITION)
|
EA
|
1.000
|
$455.000
|
$3,450.000
|
$1,800.000
|
$3,612.500
|
|
|
FIBER OPTIC PATCH PANEL (36 POSITION)
|
EA
|
1.000
|
$807.000
|
$5,520.000
|
$2,400.000
|
$5,682.500
|
|
|
FIBER OPTIC PATCH PANEL (48 POSITION)
|
EA
|
1.000
|
$1,007.000
|
$7,360.000
|
$3,100.000
|
$7,522.500
|
|
|
FIBER OPTIC PATCH PANEL (72 POSITION)
|
EA
|
10.000
|
$600.000
|
$10,560.000
|
$7,305.000
|
$11,202.500
|
|
|
FIBER OPTIC PATCH PANEL (96 POSITION)
|
EA
|
1.000
|
$750.000
|
$14,080.000
|
$9,000.000
|
$14,882.500
|
|
|
RELOCATE FIBER OPTIC CABLE
|
LF
|
1,000.000
|
$2.660
|
$4.600
|
$18.750
|
$4.680
|
|
|
REMOVE FIBER OPTIC CABLE
|
LF
|
50,000.000
|
$1.250
|
$1.200
|
$1.710
|
$1.230
|
|
|
FO CBL (24 SMF)(PIGTAIL)
|
LF
|
2,000.000
|
$14.610
|
$10.350
|
$4.850
|
$10.200
|
|
|
PRETERM FIBER PATCH PANEL (6 POSITION)
|
EA
|
5.000
|
$707.000
|
$1,440.000
|
$1,330.000
|
$1,542.500
|
|
|
PRETERM FIBER PATCH PANEL (12 POSITION)
|
EA
|
50.000
|
$1,019.200
|
$2,300.000
|
$1,510.000
|
$2,462.500
|
|
|
PRETERM FIBER PATCH PANEL (24 POSITION)
|
EA
|
50.000
|
$1,890.000
|
$2,760.000
|
$2,005.000
|
$2,922.500
|
|
|
FIBER OPTIC PATCH PANEL UNIT
|
EA
|
5.000
|
$2,589.230
|
$8,250.000
|
$4,720.000
|
$8,787.500
|
|
|
FIBER OPTIC JUMPERS
|
EA
|
40.000
|
$50.000
|
$120.000
|
$400.000
|
$277.500
|
|
|
ITS GRND MNT CAB (TY 6) (CONF 2) (REM)
|
EA
|
10.000
|
$2,500.000
|
$1,125.000
|
$1,280.000
|
$3,250.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
12.000
|
$8,350.000
|
$5,864.400
|
$8,665.000
|
$8,187.500
|
|
|
CCTV MOUNT (POLE)
|
EA
|
12.000
|
$550.000
|
$411.600
|
$1,720.000
|
$727.500
|
|
|
RELOCATE CCTV FIELD EQUIPMENT
|
EA
|
1.000
|
$3,500.000
|
$2,479.200
|
$4,655.000
|
$2,437.500
|
|
|
REMOVE CCTV FIELD EQUIPMENT
|
EA
|
1.000
|
$1,600.000
|
$1,412.060
|
$1,900.000
|
$812.500
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
5,000.000
|
$19.680
|
$33.910
|
$37.900
|
$33.260
|
|
|
ITS MULTI-DUCT CND (PVC-40)(BORE)
|
LF
|
100.000
|
$27.530
|
$47.340
|
$62.000
|
$56.950
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
100.000
|
$13.030
|
$63.570
|
$42.000
|
$47.170
|
|
|
ITS MULTI-DUCT CND (PVC-40)(STL ENCSE)
|
LF
|
50.000
|
$86.000
|
$91.170
|
$110.000
|
$66.760
|
|
|
ITS MULTI-DUCT CND (PVC-80)
|
LF
|
100.000
|
$14.380
|
$46.560
|
$42.000
|
$47.630
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
100.000
|
$32.680
|
$49.710
|
$66.000
|
$47.630
|
|
|
ITS MULTI-DUCT CND (PVC-80)(CONC ENCSE)
|
LF
|
50.000
|
$38.690
|
$70.260
|
$58.000
|
$49.360
|
|
|
ITS MULTI-DUCT CND (RMC)
|
LF
|
50.000
|
$65.940
|
$119.260
|
$238.000
|
$164.580
|
|
|
FIBER OPTIC CABLE ROAD MARKER
|
EA
|
100.000
|
$191.410
|
$121.650
|
$95.000
|
$392.500
|
|
|
CABLE RACK ASSEMBLY (INSTALL)
|
EA
|
10.000
|
$149.720
|
$706.030
|
$995.000
|
$927.500
|
|
|
CONDUIT (PREPARE)
|
LF
|
100,000.000
|
$1.760
|
$1.040
|
$3.850
|
$1.720
|
|
|
JUNCTION BOX (INSTALL)
|
EA
|
5.000
|
$1,348.030
|
$912.000
|
$1,710.000
|
$602.500
|
|
|
GROUND BOX (PREPARE)
|
EA
|
100.000
|
$307.870
|
$431.690
|
$550.000
|
$1,100.000
|
|
|
INSTALL DMS (POLE MTD CABINET)
|
EA
|
2.000
|
$17,650.000
|
$13,404.000
|
$20,820.000
|
$11,165.000
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
1.000
|
$20,000.000
|
$15,319.200
|
$27,650.000
|
$13,177.500
|
|
|
ITS RADIO (SNGL)(900 MHZ)-C-O
|
EA
|
1.000
|
$3,500.000
|
$3,552.450
|
$5,500.000
|
$5,370.000
|
|
|
ITS RADIO (SNGL)(900 MHZ)-C-U
|
EA
|
1.000
|
$3,500.000
|
$3,640.700
|
$5,400.000
|
$5,082.500
|
|
|
ITS RADIO (SNGL)(5 GHZ)-I-U
|
EA
|
4.000
|
$6,600.000
|
$4,154.250
|
$6,220.000
|
$4,996.250
|
|
|
ITS RADIO (SNGL)(5 GHZ)-C-P
|
EA
|
1.000
|
$4,910.000
|
$3,988.650
|
$7,850.000
|
$4,967.500
|
|
|
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-I-U
|
EA
|
1.000
|
$2,400.000
|
$5,404.250
|
$8,100.000
|
$5,370.000
|
|
|
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-C-P
|
EA
|
1.000
|
$5,000.000
|
$5,238.650
|
$8,400.000
|
$5,312.500
|
|
|
RELOCATE ITS RADIO
|
EA
|
10.000
|
$2,320.000
|
$1,405.200
|
$3,150.000
|
$2,725.000
|
|
|
REMOVE ITS RADIO
|
EA
|
10.000
|
$2,000.000
|
$548.640
|
$1,475.000
|
$812.500
|
|
|
ITS POLE (30 FT)(90 MPH)
|
EA
|
1.000
|
$5,600.000
|
$11,853.600
|
$7,195.000
|
$8,605.250
|
|
|
ITS POLE (30 FT)(REL)
|
EA
|
1.000
|
$1,940.000
|
$2,264.400
|
$3,405.000
|
$2,947.500
|
|
|
ITS POLE (30 FT)(REM)
|
EA
|
1.000
|
$1,940.000
|
$1,416.000
|
$1,362.000
|
$1,617.500
|
|
|
ITS POLE (40 FT)(90 MPH)
|
EA
|
1.000
|
$6,700.000
|
$12,631.100
|
$8,850.000
|
$10,418.350
|
|
|
ITS POLE (50 FT)(90 MPH)
|
EA
|
1.000
|
$10,000.000
|
$15,990.900
|
$11,100.000
|
$13,394.550
|
|
|
ITS POLE (60 FT)(90 MPH)
|
EA
|
12.000
|
$12,600.000
|
$22,085.900
|
$18,190.000
|
$19,549.350
|
|
|
ITS POLE (60 FT)(REL)
|
EA
|
1.000
|
$1,940.000
|
$2,686.800
|
$4,600.000
|
$3,133.100
|
|
|
ITS POLE (60 FT)(REM)
|
EA
|
1.000
|
$1,940.000
|
$1,350.000
|
$1,800.000
|
$1,617.500
|
|
|
ITS POLE MNT CAB (TY 1)(CONF 2)
|
EA
|
1.000
|
$7,600.000
|
$5,610.000
|
$4,900.000
|
$8,045.500
|
|
|
ITS POLE MNT CAB (TY 1)(CONF 2)(INS)
|
EA
|
1.000
|
$2,000.000
|
$1,658.400
|
$1,500.000
|
$4,457.500
|
|
|
ITS POLE MNT CAB (TY 1)(CONF 2)(REL)
|
EA
|
1.000
|
$2,000.000
|
$1,596.000
|
$1,900.000
|
$4,457.500
|
|
|
ITS POLE MNT CAB (TY 1)(CONF 2)(REM)
|
EA
|
1.000
|
$1,000.000
|
$559.200
|
$350.000
|
$1,218.750
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
2.000
|
$5,300.000
|
$5,796.000
|
$5,050.000
|
$8,166.250
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)(REL)
|
EA
|
1.000
|
$2,000.000
|
$1,658.400
|
$1,900.000
|
$4,457.500
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)(REM)
|
EA
|
1.000
|
$1,000.000
|
$559.200
|
$350.000
|
$1,218.750
|
|
|
ITS POLE MNT CAB (TY 3)(CONF 2)
|
EA
|
12.000
|
$6,500.000
|
$6,996.000
|
$6,350.000
|
$9,557.750
|
|
|
ITS POLE MNT CAB (TY 3)(CONF 2)(REL)
|
EA
|
1.000
|
$2,000.000
|
$1,598.400
|
$1,900.000
|
$4,457.500
|
|
|
ITS POLE MNT CAB (TY 3)(CONF 2)(REM)
|
EA
|
1.000
|
$1,000.000
|
$559.200
|
$350.000
|
$1,625.000
|
|
|
REMOVE EXISTING CABLES (POWER)
|
LF
|
1,000.000
|
$0.460
|
$4.040
|
$0.850
|
$2.440
|
|
|
REMOVE EXISTING CABLES (COMMUNICATION)
|
LF
|
1,000.000
|
$2.470
|
$4.040
|
$0.850
|
$2.440
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$247.860
|
$237.600
|
$171.000
|
$335.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
20.000
|
$3,024.840
|
$4,668.000
|
$3,590.000
|
$4,858.800
|
|
|
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
|
EA
|
20.000
|
$5,065.610
|
$7,159.480
|
$5,280.000
|
$6,993.900
|
|
|
REMOVE ITS GROUND BOX
|
EA
|
10.000
|
$422.900
|
$1,166.350
|
$540.000
|
$975.000
|
|
|
HIGH MAST ASSEMBLY FOR ITS
|
EA
|
2.000
|
$22,000.000
|
$56,338.290
|
$32,750.000
|
$65,862.000
|
|
|
ITS RVSD (DATA COLLECT & WWA) SYS
|
EA
|
12.000
|
$13,300.000
|
$7,978.700
|
$13,650.000
|
$11,541.500
|
|
|
ITS RVSD (DC & WWA) (RELOCATE)
|
EA
|
1.000
|
$1,500.000
|
$2,702.400
|
$5,100.000
|
$3,250.000
|
|
|
ITS RVSD (DC & WWA) (REMOVE)
|
EA
|
1.000
|
$1,500.000
|
$1,291.200
|
$2,050.000
|
$812.500
|
|
|
LCS SIGNAL UNIT (REMOVE)
|
EA
|
55.000
|
$2,800.000
|
$532.760
|
$2,236.000
|
$812.500
|
|
|
INSTALL OF HARD ETHERNET SWITCH
|
EA
|
20.000
|
$720.000
|
$621.600
|
$1,517.000
|
$898.750
|
|
|
REMOVE DYNAMIC MESSAGE SIGN SYSTEM
|
EA
|
1.000
|
$12,000.000
|
$7,833.600
|
$14,150.000
|
$3,250.000
|
|
|
INST WRONG WAY DRIVER SYSTEM EQUIPMENT
|
EA
|
2.000
|
$5,500.000
|
$6,785.000
|
$6,100.000
|
$6,262.500
|
|
|
CELLULAR ROUTER
|
EA
|
1.000
|
$500.000
|
$211.200
|
$1,400.000
|
$927.500
|
|
Totals: |
$3,573,993.670
|
$4,310,784.570
|
$4,887,309.000
|
$5,283,568.392
|