Show Job Controls
Bid Cobra

TARRANT VA (0902-00-204)

Items: 19

County: TARRANT
Length: N/A
Highway: VA
District: FORT WORTH
Control Number: 0902-00-204
DBE Goal: N/A
Project: F 2021(866)
Guaranty: N/A
Time: 365 WORKING DAYS
Engineer's Estimate: $3,370,200.00
Date: 08/05/2021 (4 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (2)
E
Engineer's Estimate
$3,370,200.00
$3,553,920.00
Over/Under Est: 5.45% $183,720.00
$5,389,949.64
Over/Under Est: 59.93% $2,019,749.64
Amt Left: 51.66% $1,836,029.64

Bid Items & Bid Tabulations

19 Total 0 of 19
TARRANT  |  VA  |  FORT WORTH  |  0902-00-204  |  08/05/2021  |  $3,370,200.00  |  F 2021(866)  |  REHAB EXIST ROADWAY  |  365 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
O. TREVINO CONSTRUCTION, LLC
ALTUS CONSTRUCTION LLC
CURB (TYPE II)
LF 330.000 $42.500 $71.000 $15.320
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
SY 100.000 $450.000 $505.000 $551.370
FULL-DEPTH REPAIR CRCP (6"-7")
SY 1,875.000 $195.000 $191.000 $243.930
FULL-DEPTH REPAIR CRCP (8"-10")
SY 3,650.000 $228.000 $215.000 $263.190
FULL-DEPTH REPAIR CRCP (11"-12")
SY 4,525.000 $250.000 $249.000 $278.980
FULL-DEPTH REPAIR CRCP (13"-15")
SY 575.000 $340.000 $340.000 $306.460
CNC STR REP(ULTR RPD DCK REP)(TYB)(P D)
SF 225.000 $180.000 $180.000 $206.760
CNC STR REP(ULTR RPD DCK REP)(TYB)(F D)
SF 225.000 $192.000 $192.000 $206.760
CLEANING AND SEALING JOINTS (CL 7)
LF 1,000.000 $21.000 $21.000 $13.780
HEADER TYPE EXPANSION JOINT
CF 350.000 $455.000 $493.000 $525.840
MOBILIZATION (CALLOUT)
EA 12.000 $2,500.000 $2,500.000 $13,784.270
MOBILIZATION (EMERGENCY)
EA 5.000 $4,500.000 $4,500.000 $13,784.270
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $1,000.000 $19,000.000 $103,382.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 100.000 $7.500 $7.500 $13.780
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.500 $1.500 $5.510
SPALLING REPAIR (POLYMERIC) (FLEXIBLE)
GAL 5,000.000 $44.000 $44.250 $60.650
FIBER REINFORCED POLYMER PATCHING MATLS
LB 30,000.000 $4.000 $4.000 $9.650
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 250.000 $175.000 $171.000 $103.380
TMA (STATIONARY)
DAY 420.000 $175.000 $172.000 $206.760
Totals: $3,370,200.000 $3,553,920.000 $5,389,949.640