Show Job Controls
Bid Cobra

TARRANT SS 280 (0172-06-094)

Items: 33

County: TARRANT
Length: N/A
Highway: SS 280
District: FORT WORTH
Control Number: 0172-06-094
DBE Goal: N/A
Project: BR 2B20(020)
Guaranty: N/A
Time: 235 WORKING DAYS
Engineer's Estimate: $3,411,858.30
Date: 07/08/2020 (5 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$3,411,858.30
$2,609,024.16
Over/Under Est: -23.53% -$802,834.14
Over/Under Est: 5.72% $195,308.70
Amt Left: 38.26% $998,142.84
$3,912,131.30
Over/Under Est: 14.66% $500,273.00
Amt Left: 49.95% $1,303,107.14
Delta: -8.45% -$304,964.30
Over/Under Est: 28.68% $978,652.70
Amt Left: 68.28% $1,781,486.84
Delta: -12.23% -$478,379.70
$4,594,275.50
Over/Under Est: 34.66% $1,182,417.20
Amt Left: 76.09% $1,985,251.34
Delta: -4.64% -$203,764.50
Over/Under Est: 67.05% $2,287,725.60
Amt Left: 118.46% $3,090,559.74
Delta: -24.06% -$1,105,308.40

Bid Items & Bid Tabulations

33 Total 0 of 33
TARRANT  |  SS 280  |  FORT WORTH  |  0172-06-094  |  07/08/2020  |  $3,411,858.30  |  BR 2B20(020)  |  BRIDGE MAINT  |  235 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
DBI SERVICES, LLC
SOUTHERN ROAD & BRIDGE, LLC
FNH CONSTRUCTION, LLC
SEMA CONSTRUCTION, INC.
PREPARING ROW
STA 31.000 $500.000 $100.000 $1,437.000 $1,000.000 $3,000.000 $10,000.000 $17,000.000
PLAN & TEXT ASPH CONC PAV(0" TO 4")
SY 3,276.000 $8.000 $16.000 $13.000 $13.500 $9.000 $15.000 $7.000
FLOWABLE BACKFILL
CY 3.000 $500.000 $1,000.000 $2,926.000 $1,500.000 $2,500.000 $500.000 $325.000
SHEAR KEY
CY 9.000 $800.000 $500.000 $6,207.000 $2,500.000 $1,200.000 $1,000.000 $5,000.000
APPROACH SLAB (MOD)
CY 120.000 $750.000 $2,650.000 $1,518.000 $1,025.000 $850.000 $2,000.000 $700.000
SILICONE RESIN PAINT FINISH
SF 30,117.000 $10.000 $3.740 $8.000 $7.650 $10.000 $6.500 $7.700
PENETRATING CONCRETE SURFACE TREATMENT
SY 1,416.000 $35.000 $4.630 $13.000 $5.000 $22.000 $5.000 $12.400
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 15.000 $500.000 $250.000 $882.000 $675.000 $450.000 $1,000.000 $135.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 55.000 $350.000 $150.000 $591.000 $800.000 $200.000 $1,000.000 $225.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,147.000 $300.000 $198.000 $175.000 $280.000 $225.000 $350.000 $200.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 325.000 $175.000 $115.500 $283.000 $220.000 $185.000 $185.000 $156.000
CLEANING AND SEALING JOINTS
LF 12.000 $50.000 $75.000 $521.000 $175.000 $250.000 $100.000 $125.000
MULTI-LAYER POLYMER OVERLAY
SY 2,900.000 $50.000 $30.000 $41.000 $56.000 $44.000 $60.000 $56.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 4,977.000 $20.000 $7.000 $21.000 $11.250 $25.000 $20.000 $55.000
CLEAN AND PAINT EXIST STR (REF NO. 1)
EA 1.000 $5,000.000 $28,000.000 $59,745.000 $56,700.000 $122,000.000 $50,000.000 $245,000.000
CLEAN AND PAINT EXIST STR (REF NO. 2)
EA 1.000 $4,300.000 $28,000.000 $55,745.000 $50,000.000 $122,000.000 $50,000.000 $244,000.000
MOBILIZATION
LS 1.000 $285,370.300 $172,000.000 $361,588.000 $310,000.000 $400,000.000 $450,000.000 $569,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $12,000.000 $6,400.000 $42,411.000 $8,500.000 $25,000.000 $8,500.000 $46,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,491.000 $7.500 $3.000 $6.000 $7.000 $6.000 $18.000 $4.400
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,491.000 $6.500 $1.000 $3.000 $1.000 $2.000 $9.000 $0.700
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 124.000 $175.000 $90.000 $180.000 $250.000 $110.000 $100.000 $128.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 50.000 $75.000 $75.000 $143.000 $375.000 $35.000 $500.000 $39.000
BRIDGE JOINT REPAIR (CONCRETE)
LF 835.000 $50.000 $70.000 $65.000 $140.000 $150.000 $200.000 $145.000
BRIDGE JOINT REPAIR (ARMOR)
LF 2,271.000 $50.000 $56.000 $40.000 $100.000 $222.000 $200.000 $240.000
BRIDGE JOINT REPAIR (SEJ)
LF 265.000 $50.000 $56.000 $53.000 $200.000 $288.000 $300.000 $230.000
REPLACE ELASTOMERIC BEARING PADS
EA 111.000 $3,500.000 $3,400.000 $2,638.000 $4,550.000 $4,800.000 $3,500.000 $5,574.000
POLYESTER POLYMER CONC OVERLAY (2")
SY 3,399.000 $300.000 $207.000 $253.000 $350.000 $300.000 $285.000 $265.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 532.000 $150.000 $50.000 $81.000 $50.000 $1.000 $150.000 $230.000
MULTIPOLYMER PAV MRK (W)(4")(SLD)
LF 1,539.000 $2.000 $5.500 $11.000 $7.000 $3.000 $6.000 $6.700
MULTIPOLYMER PAV MRK (W)(4")(BRK)
LF 611.000 $2.000 $5.500 $25.000 $7.000 $3.000 $6.000 $9.600
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 25.000 $5.000 $5.500 $30.000 $25.000 $15.000 $6.000 $13.500
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
LF 1,443.000 $2.000 $5.500 $12.000 $7.000 $3.000 $6.000 $6.700
TMA (STATIONARY)
DAY 194.000 $500.000 $300.000 $232.000 $300.000 $1.000 $350.000 $250.000
Totals: $3,411,858.300 $2,609,024.160 $3,607,167.000 $3,912,131.300 $4,390,511.000 $4,594,275.500 $5,699,583.900