|
|
PREPARING ROW
|
STA
|
26.000
|
$6,500.000
|
$97,500.000
|
$105,000.000
|
$102,008.410
|
$1,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
5,716.000
|
$9.000
|
$8.500
|
$19.000
|
$16.000
|
$30.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
14.000
|
$75.000
|
$65.000
|
$32.000
|
$73.000
|
$115.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
87.000
|
$20.000
|
$15.000
|
$16.000
|
$27.000
|
$20.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
1,074.000
|
$20.000
|
$14.000
|
$8.000
|
$20.000
|
$20.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
2,680.000
|
$6.000
|
$3.500
|
$4.000
|
$14.000
|
$12.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
40.000
|
$15.000
|
$50.000
|
$16.000
|
$22.000
|
$18.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
732.000
|
$50.000
|
$55.000
|
$85.000
|
$140.000
|
$150.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
278.000
|
$7.000
|
$11.750
|
$16.500
|
$8.000
|
$17.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
38,135.000
|
$12.000
|
$25.000
|
$19.000
|
$33.300
|
$43.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
496.000
|
$20.000
|
$12.500
|
$32.000
|
$34.620
|
$24.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,564.000
|
$15.000
|
$55.000
|
$44.000
|
$20.840
|
$55.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
1,728.000
|
$1.500
|
$1.250
|
$3.500
|
$5.230
|
$12.000
|
|
|
BLOCK SODDING
|
SY
|
1,728.000
|
$4.000
|
$7.000
|
$4.700
|
$4.500
|
$6.200
|
|
|
VEGETATIVE WATERING
|
MG
|
12.000
|
$15.000
|
$150.000
|
$340.000
|
$349.740
|
$100.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
177.000
|
$300.000
|
$289.000
|
$290.000
|
$320.000
|
$318.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
10,634.000
|
$5.000
|
$4.000
|
$4.500
|
$5.940
|
$5.000
|
|
|
CEMENT
|
TON
|
15.000
|
$300.000
|
$270.000
|
$286.000
|
$255.440
|
$330.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
1,064.000
|
$4.000
|
$7.000
|
$5.000
|
$15.260
|
$9.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
2,126.000
|
$7.000
|
$7.200
|
$7.300
|
$7.200
|
$8.000
|
|
|
PLANE ASPH CONC PAV(2" TO 4")
|
SY
|
7,932.000
|
$8.000
|
$4.250
|
$5.500
|
$3.860
|
$6.600
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
10,149.000
|
$85.000
|
$97.000
|
$100.000
|
$105.000
|
$160.000
|
|
|
FULL - DEPTH REPAIR CRCP (10")
|
SY
|
1,291.000
|
$300.000
|
$250.000
|
$182.000
|
$185.000
|
$310.000
|
|
|
STRUCT EXCAV
|
CY
|
37.000
|
$8.000
|
$22.000
|
$40.000
|
$162.160
|
$20.000
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
5,378.000
|
$8.000
|
$17.500
|
$25.000
|
$1.400
|
$20.000
|
|
|
CEM STABIL BKFL
|
CY
|
13.000
|
$200.000
|
$110.000
|
$180.000
|
$196.080
|
$165.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
215.000
|
$250.000
|
$220.000
|
$250.000
|
$217.920
|
$350.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
2,920.000
|
$6.000
|
$1.000
|
$8.000
|
$1.860
|
$6.600
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,726.000
|
$55.000
|
$10.000
|
$52.000
|
$132.140
|
$80.000
|
|
|
TEMPORARY SPL SHORING (RR BRACED EXCAV)
|
SF
|
1,024.000
|
$440.000
|
$600.000
|
$500.000
|
$433.190
|
$675.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
136.000
|
$250.000
|
$150.000
|
$136.000
|
$170.000
|
$250.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
6,114.000
|
$279.000
|
$245.000
|
$260.000
|
$250.000
|
$330.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
751.000
|
$350.000
|
$310.000
|
$366.000
|
$300.000
|
$435.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
1,413.000
|
$525.000
|
$365.000
|
$456.000
|
$350.000
|
$507.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
1,747.000
|
$550.000
|
$480.000
|
$575.000
|
$455.000
|
$655.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
3,655.000
|
$800.000
|
$800.000
|
$875.000
|
$750.000
|
$1,085.000
|
|
|
DRILL SHAFT (66 IN)
|
LF
|
120.000
|
$1,240.000
|
$665.000
|
$1,350.000
|
$700.000
|
$938.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
13.000
|
$450.000
|
$400.000
|
$490.000
|
$699.000
|
$440.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
66.000
|
$600.000
|
$480.000
|
$580.000
|
$820.000
|
$528.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
7.000
|
$1,250.000
|
$1,200.000
|
$1,500.000
|
$1,382.800
|
$2,750.000
|
|
|
CL C CONC (MISC)
|
CY
|
719.000
|
$900.000
|
$630.000
|
$850.000
|
$636.810
|
$1,300.000
|
|
|
CL F CONC (BENT)(MASS)
|
CY
|
64.800
|
$1,700.000
|
$1,450.000
|
$1,150.000
|
$1,030.980
|
$2,400.000
|
|
|
CL F CONC (CAP)
|
CY
|
119.400
|
$1,345.000
|
$1,600.000
|
$1,150.000
|
$1,336.620
|
$2,500.000
|
|
|
APPROACH SLAB
|
CY
|
46.400
|
$825.000
|
$1,100.000
|
$800.000
|
$1,150.910
|
$1,500.000
|
|
|
RETAINING WALL (DRILL SHAFT) (FACIA)
|
SF
|
24,553.000
|
$75.000
|
$45.000
|
$68.000
|
$63.000
|
$135.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
4,412.000
|
$95.000
|
$95.000
|
$125.000
|
$102.160
|
$220.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1.500
|
$525.000
|
$760.000
|
$735.000
|
$1,200.000
|
$700.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
25.000
|
$525.000
|
$680.000
|
$590.000
|
$823.730
|
$550.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
193.000
|
$600.000
|
$615.000
|
$520.000
|
$731.610
|
$750.000
|
|
|
POLYURETHANE BEARINGS (FOR RR)
|
EA
|
4.000
|
$3,000.000
|
$3,500.000
|
$1,600.000
|
$14,239.910
|
$2,500.000
|
|
|
STR STEEL (RAILROAD DECK - GIRDER)
|
LB
|
422,957.000
|
$3.500
|
$2.750
|
$2.950
|
$3.150
|
$3.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
1,088.000
|
$9.000
|
$20.000
|
$4.100
|
$14.820
|
$16.000
|
|
|
RAIL (TY SSTR)
|
LF
|
440.000
|
$60.000
|
$105.000
|
$71.000
|
$93.070
|
$150.000
|
|
|
RAIL (TY PR3)
|
LF
|
941.000
|
$300.000
|
$180.000
|
$140.000
|
$235.890
|
$270.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
660.000
|
$75.000
|
$100.000
|
$73.000
|
$105.180
|
$150.000
|
|
|
RAIL (HANDRAIL)(RR BRIDGE)
|
LF
|
359.000
|
$100.000
|
$35.000
|
$100.000
|
$173.190
|
$50.000
|
|
|
RAIL (TY SSTR)(MOD)
|
LF
|
310.000
|
$120.000
|
$105.000
|
$400.000
|
$110.230
|
$150.000
|
|
|
RAIL (RW-SMR)
|
LF
|
1,169.000
|
$200.000
|
$60.000
|
$86.000
|
$50.000
|
$72.000
|
|
|
RAIL (TY PR3) (MOD)
|
LF
|
812.000
|
$300.000
|
$180.000
|
$170.000
|
$235.820
|
$270.000
|
|
|
SRCMP (ALUM-COATED STL)(TY 2) (24 IN)
|
LF
|
32.000
|
$300.000
|
$140.000
|
$195.000
|
$299.490
|
$300.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
39.000
|
$325.000
|
$310.000
|
$320.000
|
$520.000
|
$680.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
564.000
|
$350.000
|
$325.000
|
$360.000
|
$480.000
|
$740.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
582.000
|
$450.000
|
$390.000
|
$400.000
|
$650.000
|
$820.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
833.000
|
$75.000
|
$75.000
|
$100.000
|
$163.240
|
$270.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
460.000
|
$105.000
|
$95.000
|
$131.000
|
$137.000
|
$290.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
35.000
|
$140.000
|
$135.000
|
$154.000
|
$598.240
|
$360.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
496.000
|
$230.000
|
$140.000
|
$180.000
|
$193.750
|
$406.000
|
|
|
INLET (COMPL)(CO)(10 FT)(FTW)
|
EA
|
2.000
|
$10,500.000
|
$8,400.000
|
$9,700.000
|
$14,693.530
|
$12,650.000
|
|
|
INLET (COMPL)( CO)(20 FT)(FTW)
|
EA
|
1.000
|
$14,000.000
|
$9,800.000
|
$14,000.000
|
$18,354.680
|
$18,150.000
|
|
|
INLET (COMPL)(CU)(15 FT)(FTW)
|
EA
|
2.000
|
$18,000.000
|
$13,000.000
|
$16,000.000
|
$17,765.870
|
$29,150.000
|
|
|
INLET (COMPL)(AD)(3FT X 3FT)(FTW)
|
EA
|
4.000
|
$8,500.000
|
$3,800.000
|
$5,100.000
|
$4,462.720
|
$11,000.000
|
|
|
INLET (COMPL)(AD-2)(FTW)
|
EA
|
1.000
|
$8,000.000
|
$7,600.000
|
$10,000.000
|
$8,906.060
|
$17,050.000
|
|
|
INLET (COMPL)(RWF)(FTW)
|
EA
|
7.000
|
$4,500.000
|
$9,300.000
|
$6,600.000
|
$11,030.390
|
$20,350.000
|
|
|
MANH (COMPL)(TY SD)(4'X 4'-3'X 3')(FTW)
|
EA
|
6.000
|
$6,000.000
|
$5,500.000
|
$7,200.000
|
$7,324.170
|
$9,350.000
|
|
|
MANH (COMPL)(TY SD)(5'X 4'-3'X 3')(FTW)
|
EA
|
7.000
|
$6,000.000
|
$6,250.000
|
$8,500.000
|
$8,191.150
|
$11,000.000
|
|
|
MANH (COMPL)(TY SD)(8'X 8'-3'X 3')(FTW)
|
EA
|
6.000
|
$16,000.000
|
$19,000.000
|
$18,000.000
|
$19,578.320
|
$18,150.000
|
|
|
INLET (COMPL)(SSB)(10 FT)(FTW)
|
EA
|
8.000
|
$5,000.000
|
$9,500.000
|
$6,200.000
|
$18,100.560
|
$13,200.000
|
|
|
CAST-IN-PLACE TRENCH DRAIN
|
LF
|
45.000
|
$550.000
|
$140.000
|
$148.000
|
$830.350
|
$1,430.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
2.000
|
$1,500.000
|
$1,150.000
|
$2,800.000
|
$3,657.450
|
$2,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
8.000
|
$1,000.000
|
$575.000
|
$950.000
|
$1,026.120
|
$2,200.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
6.000
|
$1,100.000
|
$715.000
|
$950.000
|
$833.920
|
$2,200.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,711.000
|
$25.000
|
$16.000
|
$25.000
|
$25.200
|
$82.500
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
475.000
|
$5.000
|
$4.250
|
$10.500
|
$5.420
|
$8.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
660.000
|
$30.000
|
$4.500
|
$6.000
|
$18.730
|
$10.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,129,726.130
|
$2,600,000.000
|
$2,684,000.000
|
$2,652,218.850
|
$2,570,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
31.000
|
$11,000.000
|
$15,000.000
|
$16,500.000
|
$20,000.000
|
$14,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,303.000
|
$4.000
|
$2.650
|
$2.750
|
$2.650
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,303.000
|
$1.000
|
$0.600
|
$0.600
|
$0.600
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
385.000
|
$6.000
|
$3.250
|
$3.350
|
$3.250
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
385.000
|
$2.000
|
$0.850
|
$0.850
|
$0.850
|
$1.100
|
|
|
CONSTRUCTING DETOURS
|
SY
|
795.000
|
$100.000
|
$130.000
|
$132.000
|
$127.150
|
$340.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,020.000
|
$45.000
|
$70.000
|
$56.000
|
$86.000
|
$100.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$55.000
|
$70.000
|
$58.000
|
$86.000
|
$100.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
1,960.000
|
$7.500
|
$10.000
|
$4.000
|
$6.070
|
$15.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
240.000
|
$14.000
|
$10.000
|
$9.000
|
$38.340
|
$15.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,020.000
|
$11.000
|
$10.000
|
$12.000
|
$7.770
|
$19.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$16.000
|
$10.000
|
$16.000
|
$7.700
|
$19.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
1,444.000
|
$6.000
|
$6.700
|
$6.000
|
$21.740
|
$5.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
189.000
|
$25.000
|
$32.500
|
$22.000
|
$35.140
|
$50.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
3,684.000
|
$75.000
|
$60.000
|
$67.000
|
$95.650
|
$90.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
4.000
|
$2,500.000
|
$1,725.000
|
$2,000.000
|
$2,582.560
|
$3,000.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
4.000
|
$4,000.000
|
$1,900.000
|
$2,200.000
|
$4,428.640
|
$3,850.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$2,500.000
|
$2,030.000
|
$1,850.000
|
$3,314.380
|
$3,700.000
|
|
|
CONC MEDIAN
|
SY
|
611.000
|
$100.000
|
$85.000
|
$60.000
|
$131.330
|
$142.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
264.000
|
$3.000
|
$3.000
|
$20.500
|
$9.390
|
$4.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$300.000
|
$500.000
|
$20.500
|
$399.280
|
$300.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$10,000.000
|
$8,500.000
|
$7,600.000
|
$25,726.700
|
$26,000.000
|
|
|
CHAIN LINK FENCE(INSTALL)(6 )(BARB TOP)
|
LF
|
475.000
|
$50.000
|
$45.000
|
$40.000
|
$40.000
|
$66.000
|
|
|
CHN LNK FNCE(PVC-COATD)(8' MESH)(INSTL)
|
LF
|
900.000
|
$50.000
|
$65.000
|
$36.000
|
$35.000
|
$66.000
|
|
|
CHN LINK FNC GATE(PVC CTD)(INSTL)8'X7'
|
EA
|
1.000
|
$4,000.000
|
$5,500.000
|
$1,800.000
|
$2,000.000
|
$2,200.000
|
|
|
PIPE UNDERDRAINS (TY 9) (6")
|
LF
|
205.000
|
$50.000
|
$195.000
|
$80.000
|
$33.330
|
$50.000
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
4,912.500
|
$15.000
|
$10.500
|
$9.200
|
$15.100
|
$11.550
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
242.000
|
$30.000
|
$12.500
|
$13.000
|
$30.650
|
$13.750
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
1,130.000
|
$33.000
|
$25.000
|
$29.000
|
$57.500
|
$27.500
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
170.000
|
$30.000
|
$17.000
|
$16.200
|
$41.000
|
$18.700
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
810.000
|
$65.000
|
$35.000
|
$45.000
|
$70.500
|
$38.500
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,875.000
|
$1.500
|
$1.500
|
$2.000
|
$3.300
|
$1.650
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
940.000
|
$2.000
|
$1.650
|
$2.000
|
$3.300
|
$1.820
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
5,611.500
|
$2.500
|
$1.750
|
$2.450
|
$2.210
|
$1.930
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
6,014.500
|
$3.000
|
$2.250
|
$2.450
|
$2.500
|
$2.480
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
5.000
|
$1,600.000
|
$1,050.000
|
$1,300.000
|
$1,830.000
|
$1,155.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
5.000
|
$1,800.000
|
$1,100.000
|
$1,520.000
|
$2,695.000
|
$1,210.000
|
|
|
REMOVE GROUND BOX
|
EA
|
1.000
|
$600.000
|
$350.000
|
$305.000
|
$777.000
|
$385.000
|
|
|
RELOCATE ELECTRICAL SERVICES
|
EA
|
11.000
|
$5,000.000
|
$2,500.000
|
$1,230.000
|
$7,010.000
|
$2,750.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
4.000
|
$850.000
|
$2,500.000
|
$910.000
|
$777.000
|
$800.000
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)PS(U)
|
EA
|
1.000
|
$10,500.000
|
$8,000.000
|
$8,700.000
|
$11,135.000
|
$8,800.000
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
|
EA
|
1.000
|
$8,000.000
|
$8,000.000
|
$7,600.000
|
$11,770.000
|
$8,800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
9.000
|
$700.000
|
$925.000
|
$830.000
|
$845.000
|
$929.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$825.000
|
$850.000
|
$1,050.000
|
$765.000
|
$841.500
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
6.000
|
$2,700.000
|
$3,500.000
|
$3,500.000
|
$2,200.000
|
$2,420.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
5.000
|
$600.000
|
$900.000
|
$730.000
|
$600.000
|
$660.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
7.000
|
$120.000
|
$225.000
|
$182.000
|
$100.000
|
$110.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
18.000
|
$30.000
|
$40.000
|
$23.500
|
$50.000
|
$55.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
479.000
|
$6.000
|
$3.500
|
$3.600
|
$3.850
|
$3.850
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
644.000
|
$6.000
|
$3.500
|
$3.600
|
$3.850
|
$3.850
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
1,215.000
|
$5.000
|
$3.800
|
$3.900
|
$3.250
|
$4.180
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
1,908.000
|
$5.000
|
$3.800
|
$3.900
|
$3.250
|
$4.180
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
120.000
|
$15.000
|
$4.000
|
$4.100
|
$6.000
|
$4.400
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
6.000
|
$250.000
|
$58.000
|
$59.500
|
$225.000
|
$63.800
|
|
|
WK ZN PAV MRK REMOV (W)(DBL ARROW)
|
EA
|
1.000
|
$275.000
|
$70.000
|
$72.000
|
$275.000
|
$77.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
6.000
|
$200.000
|
$58.000
|
$60.000
|
$325.000
|
$63.800
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
342.000
|
$2.500
|
$1.500
|
$1.550
|
$1.770
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
34.000
|
$2.000
|
$1.500
|
$1.450
|
$1.700
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
54.000
|
$2.000
|
$1.000
|
$1.050
|
$1.500
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,308.000
|
$1.500
|
$0.800
|
$0.850
|
$1.500
|
$0.880
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
161.000
|
$5.000
|
$2.500
|
$2.600
|
$3.770
|
$2.750
|
|
REFL PAV MRK TY I (W)24"(SLD)(060MIL)
|
LF
|
670.000
|
$6.000
|
$5.550
|
$5.750
|
$7.000
|
$6.110
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
201.000
|
$8.000
|
$5.750
|
$6.000
|
$7.000
|
$6.330
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
18.000
|
$200.000
|
$109.000
|
$112.000
|
$155.000
|
$119.900
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
17.000
|
$200.000
|
$110.000
|
$113.000
|
$180.000
|
$121.000
|
|
REFL PAV MRK TY I (Y)4"(DOT)(100MIL)
|
LF
|
477.000
|
$2.000
|
$0.900
|
$0.950
|
$1.000
|
$0.990
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
83.000
|
$5.000
|
$3.000
|
$3.100
|
$3.770
|
$3.300
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
5,557.000
|
$0.250
|
$0.250
|
$0.270
|
$0.750
|
$0.280
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,370.000
|
$0.500
|
$0.880
|
$0.900
|
$1.000
|
$0.970
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
6,815.000
|
$0.750
|
$0.740
|
$0.770
|
$1.000
|
$0.810
|
|
TRAFFIC BUTTON TY I-C
|
EA
|
120.000
|
$7.000
|
$3.750
|
$3.850
|
$5.000
|
$4.130
|
|
TRAFFIC BUTTON TY II-A-A
|
EA
|
58.000
|
$7.000
|
$3.750
|
$3.850
|
$5.000
|
$4.130
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
11,790.000
|
$0.750
|
$0.580
|
$0.600
|
$0.760
|
$0.640
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
566.000
|
$1.000
|
$0.900
|
$0.950
|
$0.800
|
$0.990
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
394.000
|
$4.000
|
$2.600
|
$2.700
|
$3.500
|
$2.860
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
15.000
|
$100.000
|
$40.000
|
$41.000
|
$45.000
|
$44.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
15.000
|
$100.000
|
$40.000
|
$41.000
|
$55.000
|
$44.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$8,250.000
|
$4,100.000
|
$9,000.000
|
$6,050.000
|
$4,510.000
|
|
|
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
|
EA
|
1.000
|
$25,000.000
|
$19,500.000
|
$32,000.000
|
$44,000.000
|
$21,450.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
8.000
|
$388.350
|
$300.000
|
$360.000
|
$770.000
|
$330.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
7.000
|
$389.680
|
$300.000
|
$355.000
|
$770.000
|
$330.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$376.890
|
$300.000
|
$360.000
|
$770.000
|
$330.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
9.000
|
$362.670
|
$300.000
|
$355.000
|
$770.000
|
$330.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
11.000
|
$379.120
|
$300.000
|
$360.000
|
$770.000
|
$330.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$385.120
|
$300.000
|
$355.000
|
$770.000
|
$330.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
8.000
|
$825.000
|
$300.000
|
$966.000
|
$1,350.000
|
$330.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
12.000
|
$250.000
|
$175.000
|
$160.000
|
$325.000
|
$192.500
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
3.000
|
$250.000
|
$175.000
|
$165.000
|
$360.000
|
$192.500
|
|
|
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
|
LF
|
1,320.000
|
$2.500
|
$1.750
|
$2.900
|
$3.300
|
$1.930
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
80.000
|
$4.000
|
$2.280
|
$3.600
|
$4.400
|
$2.510
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
600.000
|
$4.000
|
$2.500
|
$4.200
|
$4.400
|
$2.750
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
660.000
|
$7.500
|
$5.250
|
$5.100
|
$9.900
|
$5.780
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$5,000.000
|
$2,500.000
|
$4,300.000
|
$6,160.000
|
$2,750.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
1.000
|
$18,500.000
|
$12,500.000
|
$23,000.000
|
$26,730.000
|
$13,750.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')
|
EA
|
1.000
|
$32,500.000
|
$29,500.000
|
$36,500.000
|
$39,500.000
|
$32,450.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
1.000
|
$40,000.000
|
$34,500.000
|
$41,000.000
|
$45,000.000
|
$37,950.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM
|
EA
|
1.000
|
$42,500.000
|
$36,125.000
|
$42,000.000
|
$46,600.000
|
$39,737.500
|
|
|
PED POLE ASSEMBLY
|
EA
|
3.000
|
$3,383.720
|
$2,200.000
|
$3,600.000
|
$6,050.000
|
$2,420.000
|
|
|
PEDESTRIAN PUSH BUTTON POLE
|
EA
|
1.000
|
$4,355.000
|
$1,500.000
|
$3,200.000
|
$4,400.000
|
$1,650.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
8.000
|
$1,100.000
|
$325.000
|
$980.000
|
$1,175.000
|
$357.500
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
1.000
|
$3,630.000
|
$3,600.000
|
$4,200.000
|
$6,600.000
|
$3,960.000
|
|
|
REMOVAL OF CONDUIT
|
LF
|
112.000
|
$2.000
|
$1.500
|
$3.600
|
$6.000
|
$1.650
|
|
|
REMOVAL OF CABLES
|
LF
|
824.000
|
$2.000
|
$1.000
|
$1.250
|
$1.300
|
$1.100
|
|
|
REMOVAL OF PEDESTRIAN RAMPS
|
EA
|
7.000
|
$750.000
|
$550.000
|
$115.000
|
$0.010
|
$500.000
|
|
|
D-GR HMA TY-D SAC-B PG64-22
|
TON
|
2,422.000
|
$110.000
|
$133.550
|
$135.500
|
$133.550
|
$146.910
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
335.000
|
$130.000
|
$184.000
|
$187.000
|
$184.000
|
$202.400
|
|
|
DECK DRAINS
|
LF
|
360.000
|
$100.000
|
$200.000
|
$105.000
|
$71.730
|
$214.480
|
|
|
COLD LIQUID-APPL ELAST WATERPROOF MEMB
|
SY
|
265.000
|
$300.000
|
$85.000
|
$295.000
|
$357.170
|
$344.340
|
|
|
SHOOFLY BRIDGE
|
EA
|
1.000
|
$946,000.000
|
$2,500,000.000
|
$1,200,000.000
|
$1,610,000.000
|
$2,455,000.000
|
|
|
TIP TESTING (DRILL SHAFT)
|
EA
|
19.000
|
$8,000.000
|
$5,000.000
|
$4,000.000
|
$6,000.000
|
$8,600.000
|
|
|
CLEARING & GRUBBING
|
AC
|
1.100
|
$90,000.000
|
$22,000.000
|
$2,750.000
|
$29,902.990
|
$200,000.000
|
|
|
EXCAVATION
|
CY
|
3,066.000
|
$45.000
|
$25.000
|
$8.000
|
$13.910
|
$55.000
|
|
|
SUBEXCAVATION
|
CY
|
1,600.000
|
$75.000
|
$25.000
|
$49.000
|
$40.360
|
$70.000
|
|
|
EMBANKMENT
|
CY
|
1,209.000
|
$30.000
|
$60.000
|
$15.000
|
$11.770
|
$25.000
|
|
|
GEOGRID
|
SY
|
2,850.000
|
$2.000
|
$4.500
|
$8.000
|
$6.250
|
$10.000
|
|
|
SUBBALLAST
|
CY
|
1,246.000
|
$85.000
|
$150.000
|
$78.000
|
$88.510
|
$125.000
|
|
|
BALLASTED TRACK CST TIMBER TIES (TRACK)
|
TF
|
1,210.000
|
$400.000
|
$373.000
|
$438.000
|
$429.000
|
$488.000
|
|
|
SHIFT TRK (50% TIE RENWL)(PROVIDE ONLY)
|
TF
|
1,080.000
|
$77.000
|
$50.000
|
$50.000
|
$49.000
|
$54.000
|
|
|
TRACK REMOVAL
|
TF
|
1,210.000
|
$88.000
|
$43.900
|
$44.000
|
$43.000
|
$48.000
|
|
|
LINE & SURFACE (PROVIDE ONLY)
|
TF
|
2,374.000
|
$77.000
|
$45.000
|
$50.000
|
$49.000
|
$54.000
|
|
|
SEEDING
|
AC
|
1.100
|
$5,000.000
|
$4,910.000
|
$5,100.000
|
$1,300.000
|
$4,600.000
|
|
|
SW3P & EROSION CONTROL
|
LS
|
1.000
|
$5,000.000
|
$250,000.000
|
$13,000.000
|
$3,360.500
|
$61,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$24,000.000
|
$13,500.000
|
$20,454.810
|
$21,000.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$7,347.330
|
$7,500.000
|
$10,000.000
|
$10,450.000
|
$8,250.000
|
|
|
TMA (STATIONARY)
|
DAY
|
8.000
|
$200.000
|
$750.000
|
$165.000
|
$5,176.420
|
$165.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
48.000
|
$75.000
|
$120.000
|
$75.000
|
$570.380
|
$82.500
|
|
|
LED DECORATIVE ILLUM ASSM (TYPE A)
|
EA
|
25.000
|
$8,800.000
|
$6,215.000
|
$9,000.000
|
$4,860.000
|
$6,800.000
|
|
|
LED DECORATIVE ILLUM ASSM (TYPE B)
|
EA
|
11.000
|
$8,200.000
|
$5,913.000
|
$6,900.000
|
$4,765.000
|
$6,500.000
|
|
|
BYPASS PUMPING
|
LS
|
1.000
|
$150,000.000
|
$20,000.000
|
$78,000.000
|
$0.010
|
$33,000.000
|
|
|
PIPE ENCASEMENT (54 ) STEEL SPLIT
|
LF
|
115.000
|
$500.000
|
$750.000
|
$950.000
|
$410.220
|
$1,350.000
|
|
Totals: |
$24,046,762.380
|
$26,588,576.550
|
$27,046,919.990
|
$27,918,093.010
|
$34,389,036.470
|