Job Info for 0081-02-076

County: TARRANT Highway: US 377 Date: 08/03/2022 (2 years ago) Engineer's Estimate: $416,012 Control Number: 0081-02-076
Project: F 2022(846) District: FORT WORTH Time: 64 WORKING DAYS Type: LANDSCAPE DEVELOPMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $416,011.50
APEX LANDSCAPE & IRRIGATION, LLC   $470,872.00 1
13.19% | $54,860.50
CENTRAL NORTH CONSTRUCTION, LLC   $505,175.75 2
21.43% | $89,164.25
7.29% | $34,303.75
ENCINO LANDSCAPE, INC.   $538,046.00 3
29.33% | $122,034.50
14.27% | $67,174.00
6.51% | $32,870.25
Subcontractor Percentage Amount
BARRICADES UNLIMITED 1.03% $4,849.98
Total: 1.03% $4,849.98

Bid Items

Items: 24, 0 filtered
TARRANT US 377  |  FORT WORTH  |  0081-02-076  |  08/03/2022  |  $416,012  |  F 2022(846)  |  LANDSCAPE DEVELOPMENT  |  64 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate APEX LANDSCAPE & IRRIGATION, LLC CENTRAL NORTH CONSTRUCTION, LLC ENCINO LANDSCAPE, INC.
100 6001 PREPARING ROW AC 1.000 $7,500.000 $20,000.000 $50,000.000 $5,000.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 568.000 $4.000 $5.000 $10.000 $5.000
170 6001 IRRIGATION SYSTEM LS 1.000 $32,000.000 $45,000.000 $43,010.750 $80,000.000
192 6002 PLANT MATERIAL (1-GAL) EA 105.000 $15.000 $10.000 $11.000 $15.000
192 6003 PLANT MATERIAL (3-GAL) EA 570.000 $24.000 $30.000 $25.000 $35.000
192 6025 PLANT MATERIAL (45 GAL) (TREE) EA 37.000 $400.000 $295.000 $425.000 $500.000
192 6067 LANDSCAPE EDGE (TYPE I) LF 1,563.000 $25.000 $25.000 $9.000 $5.000
192 6068 LANDSCAPE EDGE (TYPE II) LF 2,076.000 $24.000 $30.000 $32.000 $35.000
192 6097 CONC LNDSCP EDG (12 IN WIDTH) LF 2,898.000 $25.000 $30.000 $28.000 $30.000
193 6001 PLANT MAINTENANCE MO 12.000 $1,500.000 $1,250.000 $1,500.000 $2,000.000
193 6007 IRRIGATION SYSTEM OPER AND MAINT MO 12.000 $750.000 $750.000 $650.000 $1,000.000
500 6001 MOBILIZATION LS 1.000 $42,300.000 $40,000.000 $24,000.000 $40,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000 $3,500.000 $4,000.000 $1,800.000 $4,000.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 27.000 $50.000 $30.000 $1.000 $50.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 27.000 $25.000 $5.000 $1.000 $1.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 299.000 $7.000 $2.000 $1.000 $10.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 299.000 $2.500 $1.000 $1.000 $1.000
528 6002 COLORED TEXTURED CONC (6") SY 54.000 $100.000 $145.000 $150.000 $300.000
1002 6012 LANDSCAPE AMENITY (TY 11) EA 1.000 $17,000.000 $5,000.000 $10,000.000 $10,000.000
1002 6029 LANDSCAPE AMENITY (BOULDER) EA 25.000 $700.000 $650.000 $400.000 $1,000.000
1005 6001 LOOSE AGGR FOR GROUNDCOVER (TYPE I) CY 76.000 $110.000 $250.000 $220.000 $200.000
1005 6002 LOOSE AGGR FOR GROUNDCOVER (TYPE II) CY 86.000 $110.000 $250.000 $90.000 $100.000
1005 6003 LOOSE AGGR FOR GROUNDCOVER (TYPE III) CY 298.000 $135.000 $125.000 $350.000 $250.000
1005 6004 LOOSE AGGR FOR GROUNDCOVER (TYPE IV) CY 2.000 $110.000 $500.000 $500.000 $300.000
Totals: $416,011.50 $470,872.00 $505,175.75 $538,046.00