Job Info for 0081-02-069

County: TARRANT Highway: US 377 Date: 07/10/2018 (6 years ago) Engineer's Estimate: $428,449 Control Number: 0081-02-069
Project: NH 1802(380) District: FORT WORTH Time: 97 WORKING DAYS Type: LANDSCAPING

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $428,449.00
CENTRAL NORTH CONSTRUCTION, LLC   $393,161.80 1
-8.24% | -$35,287.20
AALC, INC.   $403,433.43 2
-5.84% | -$25,015.57
2.61% | $10,271.63
C. GREEN SCAPING, L.P.   $436,413.40 3
1.86% | $7,964.40
11% | $43,251.60
8.17% | $32,979.97
ENCINO LANDSCAPE, INC.   $439,083.00 4
2.48% | $10,634.00
11.68% | $45,921.20
0.61% | $2,669.60
APEX LANDSCAPE & IRRIGATION, LLC   $492,196.60 5
14.88% | $63,747.60
25.19% | $99,034.80
12.10% | $53,113.60

Bid Items

Items: 21, 0 filtered
TARRANT US 377  |  FORT WORTH  |  0081-02-069  |  07/10/2018  |  $428,449  |  NH 1802(380)  |  LANDSCAPING  |  97 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate CENTRAL NORTH CONSTRUCTION, LLC AALC, INC. C. GREEN SCAPING, L.P. ENCINO LANDSCAPE, INC. APEX LANDSCAPE & IRRIGATION, LLC
100 6001 PREPARING ROW AC 0.669 $5,000.000 $10,000.000 $3,800.000 $40,000.000 $10,000.000 $10,000.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 591.000 $5.000 $5.000 $6.550 $6.800 $5.000 $4.000
170 6001 IRRIGATION SYSTEM LS 1.000 $132,000.000 $153,500.000 $155,000.000 $64,000.000 $80,000.000 $150,000.000
192 6003 PLANT MATERIAL (3-GAL) EA 609.000 $25.000 $12.000 $13.590 $9.000 $30.000 $30.000
192 6015 LANDSCAPE EDGE LF 1,652.000 $25.000 $7.250 $9.010 $4.800 $8.000 $15.000
192 6025 PLANT MATERIAL (45 GAL) (TREE) EA 20.000 $500.000 $245.000 $250.000 $270.000 $500.000 $375.000
192 6068 LANDSCAPE EDGE (TYPE II) LF 1,470.000 $35.000 $25.000 $12.920 $19.000 $35.000 $20.000
192 6097 CONC LNDSCP EDG (12 IN WIDTH) LF 1,780.000 $25.000 $19.000 $9.560 $17.000 $30.000 $20.000
193 6001 PLANT MAINTENANCE MO 12.000 $1,000.000 $1,200.000 $1,300.000 $1,400.000 $1,000.000 $3,000.000
193 6007 IRRIGATION SYSTEM OPER AND MAINT MO 12.000 $500.000 $900.000 $429.690 $600.000 $1,000.000 $1,000.000
500 6001 MOBILIZATION LS 1.000 $30,000.000 $45,000.000 $29,951.470 $22,000.000 $100,000.000 $50,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 $3,000.000 $500.000 $4,820.000 $2,700.000 $3,000.000 $5,000.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 28.000 $50.000 $10.000 $1.000 $15.000 $50.000 $1.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 28.000 $25.000 $5.000 $1.000 $7.500 $10.000 $1.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 3,284.000 $5.000 $0.100 $0.500 $4.000 $7.000 $1.900
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 3,284.000 $1.000 $0.100 $0.100 $2.000 $1.000 $0.500
618 6024 CONDT (PVC) (SCH 40) (2") (BORE) LF 270.000 $30.000 $38.000 $16.000 $28.000 $20.000 $25.000
618 6034 CONDT (PVC) (SCH 40) (4") (BORE) LF 270.000 $35.000 $42.000 $34.000 $30.000 $40.000 $28.000
1005 6001 LOOSE AGGR FOR GROUNDCOVER (TYPE I) CY 99.000 $80.000 $125.000 $162.000 $538.000 $50.000 $265.000
1005 6002 LOOSE AGGR FOR GROUNDCOVER (TYPE II) CY 96.000 $100.000 $185.000 $526.000 $683.000 $75.000 $265.000
1005 6003 LOOSE AGGR FOR GROUNDCOVER (TYPE III) CY 78.000 $100.000 $125.000 $269.000 $645.000 $100.000 $265.000
Totals: $428,449.00 $393,161.80 $403,433.43 $436,413.40 $439,083.00 $492,196.60