Show Job Controls
Bid Cobra

TARRANT IH 20 (0008-13-234)

Items: 96

County: TARRANT
Length: N/A
Highway: IH 20
District: FORT WORTH
Control Number: 0008-13-234
DBE Goal: N/A
Project: CM 2B20(019)
Guaranty: N/A
Time: 169 WORKING DAYS
Engineer's Estimate: $1,680,876.37
Date: 07/08/2020 (5 years ago)
Contract Number: N/A
Type: CONSTRUCT RAMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (9)
E
Engineer's Estimate
$1,680,876.37
$1,779,729.96
Over/Under Est: 5.88% $98,853.59
Over/Under Est: 6.63% $111,436.63
Amt Left: 0.71% $12,583.04
Over/Under Est: 7.78% $130,824.01
Amt Left: 1.8% $31,970.42
Delta: -1.08% -$19,387.38
Over/Under Est: 8.53% $143,436.66
Amt Left: 2.51% $44,583.07
Delta: -0.70% -$12,612.65
Over/Under Est: 13.55% $227,740.73
Amt Left: 7.24% $128,887.14
Delta: -4.62% -$84,304.07
Over/Under Est: 18.39% $309,142.30
Amt Left: 11.82% $210,288.71
Delta: -4.26% -$81,401.57
$2,003,457.62
Over/Under Est: 19.19% $322,581.25
Amt Left: 12.57% $223,727.66
Delta: -0.68% -$13,438.95
$2,099,625.62
Over/Under Est: 24.91% $418,749.25
Amt Left: 17.97% $319,895.66
Delta: -4.80% -$96,168.00
$2,773,665.50
Over/Under Est: 65.01% $1,092,789.13
Amt Left: 55.85% $993,935.54
Delta: -32.10% -$674,039.88

Bid Items & Bid Tabulations

96 Total 0 of 96
TARRANT  |  IH 20  |  FORT WORTH  |  0008-13-234  |  07/08/2020  |  $1,680,876.37  |  CM 2B20(019)  |  CONSTRUCT RAMPS  |  169 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SEMA CONSTRUCTION, INC.
ACCELERATED CRITICAL PATH, INC.
O. TREVINO CONSTRUCTION, LLC
ED BELL CONSTRUCTION COMPANY
JAY MILLS CONTRACTING, INCORPORATED
MCMAHON CONTRACTING, L.P.
PAVECON LTD. CO.
REBCON, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 87.500 $750.000 $1,975.000 $300.000 $1,930.000 $100.000 $1,500.000 $294.540 $340.790 $750.000 $2,285.000
REMOVING CONC (PAV)
SY 2,037.000 $12.000 $16.000 $19.000 $19.000 $10.000 $15.000 $12.500 $16.650 $21.000 $20.000
REMOVING CONC (CURB)
LF 860.000 $10.000 $2.000 $2.000 $4.500 $3.000 $12.000 $5.840 $3.610 $0.500 $20.000
EXCAVATION (ROADWAY)
CY 1,482.000 $8.000 $6.000 $9.000 $17.000 $7.500 $20.000 $14.810 $13.250 $22.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 6,990.000 $12.000 $22.000 $19.000 $28.500 $27.500 $24.000 $23.400 $52.460 $30.000 $30.000
BLADING
HR 10.000 $500.000 $240.000 $150.000 $150.000 $150.000 $150.000 $128.350 $135.420 $75.000 $150.000
COMPOST MANUF TOPSOIL (4")
SY 8,225.000 $1.400 $1.600 $4.000 $2.000 $1.000 $1.000 $1.000 $0.900 $1.000 $8.500
BROADCAST SEED (TEMP) (WARM)
AC 1.900 $1,000.000 $820.000 $900.000 $850.000 $500.000 $880.000 $936.050 $843.890 $875.000 $2,500.000
BROADCAST SEED (TEMP) (COOL)
AC 1.900 $1,000.000 $820.000 $900.000 $850.000 $500.000 $880.000 $936.050 $843.890 $875.000 $2,500.000
VEGETATIVE WATERING
MG 321.800 $20.000 $20.000 $39.000 $35.000 $35.000 $28.000 $29.760 $26.830 $45.000 $50.000
PROOF ROLLING
HR 10.000 $125.000 $215.000 $80.000 $65.000 $150.000 $100.000 $83.290 $91.730 $75.000 $150.000
LIME (HYD, COM, OR QK(SLURRY))
TON 80.000 $220.000 $150.000 $220.000 $180.000 $200.000 $185.000 $194.700 $180.220 $182.000 $200.000
LIME TRT (SUBGRADE)(8")
SY 4,244.000 $4.500 $5.000 $4.000 $6.000 $5.000 $5.000 $5.180 $7.170 $5.000 $10.000
SALV, HAUL & STKPL RCL APH PV (4 TO 6")
SY 2,451.000 $10.000 $3.800 $7.000 $6.000 $5.250 $6.000 $9.420 $5.320 $7.000 $20.000
SLV, HAUL & STKPL RCL APH PV (13")
SY 265.000 $25.000 $7.000 $15.000 $17.000 $16.800 $10.000 $25.960 $17.020 $50.000 $20.000
PRIME COAT (MC-30 OR EC-30)
GAL 848.000 $8.000 $6.300 $5.000 $6.750 $3.800 $5.000 $5.660 $2.540 $7.000 $10.000
CONC PVMT (CONT REINF - CRCP) (13")
SY 3,529.000 $110.000 $101.000 $125.000 $90.000 $100.000 $97.000 $97.530 $98.810 $135.000 $125.000
CEM STABIL BKFL
CY 8.000 $150.000 $150.000 $300.000 $350.000 $210.000 $210.000 $168.280 $137.030 $200.000 $350.000
RC PIPE (CL III)(24 IN)
LF 501.000 $135.000 $98.000 $95.000 $74.000 $84.000 $75.000 $84.270 $114.100 $104.000 $95.000
INLET (COMPL)(TY AD)
EA 2.000 $3,274.000 $5,500.000 $5,500.000 $6,400.000 $7,350.000 $3,500.000 $3,414.270 $4,042.560 $10,220.000 $5,000.000
MANH (COMPL)(TY A)
EA 1.000 $4,900.000 $7,200.000 $6,000.000 $7,350.000 $8,400.000 $3,500.000 $3,135.530 $5,851.060 $8,100.000 $5,000.000
REMOV STR (INLET)
EA 1.000 $600.000 $950.000 $600.000 $750.000 $1,050.000 $1,000.000 $830.740 $1,170.220 $1,000.000 $2,500.000
MOBILIZATION
LS 1.000 $152,806.940 $177,000.000 $175,000.000 $180,000.000 $170,000.000 $200,000.000 $342,221.060 $330,089.650 $178,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $10,000.000 $4,600.000 $3,900.000 $5,000.000 $18,000.000 $12,000.000 $13,921.480 $4,033.000 $20,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 40.000 $30.000 $39.000 $100.000 $39.000 $25.000 $45.000 $44.000 $39.670 $41.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 40.000 $9.000 $12.000 $30.000 $12.750 $12.500 $15.000 $14.290 $12.880 $13.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $25.000 $27.000 $40.000 $26.750 $20.000 $30.000 $30.260 $27.280 $28.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $10.180 $8.000 $15.000 $8.250 $10.000 $10.000 $9.450 $8.520 $9.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 546.000 $1.500 $2.600 $4.000 $2.500 $1.400 $3.000 $2.860 $2.570 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 546.000 $0.750 $0.900 $2.000 $1.000 $0.100 $1.000 $1.040 $0.940 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 232.000 $4.000 $5.100 $6.000 $5.000 $3.200 $6.000 $5.640 $5.090 $5.500 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 232.000 $1.000 $0.900 $1.500 $1.000 $1.000 $1.000 $1.040 $0.940 $1.000 $9.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 750.000 $15.000 $13.000 $9.000 $17.000 $21.000 $14.000 $13.420 $11.760 $18.000 $35.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 700.000 $20.000 $14.000 $7.000 $17.000 $15.000 $13.000 $14.140 $10.090 $22.000 $30.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 20.000 $60.000 $15.000 $13.000 $18.000 $45.000 $20.000 $15.980 $10.090 $22.000 $30.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 750.000 $18.000 $10.000 $7.000 $16.000 $10.500 $12.000 $13.420 $11.760 $16.000 $30.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 700.000 $10.000 $10.000 $5.000 $15.000 $7.500 $10.000 $14.160 $10.090 $20.000 $30.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 20.000 $30.000 $13.000 $12.000 $15.000 $22.500 $15.000 $15.980 $10.090 $20.000 $30.000
CONC CURB (TY II)
LF 860.000 $25.000 $25.000 $6.000 $12.000 $15.000 $14.000 $18.900 $5.000 $1.000 $35.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $3.500 $7.300 $10.000 $8.000 $10.750 $4.000 $8.850 $7.450 $8.250 $5.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $275.000 $315.000 $320.000 $260.000 $537.500 $500.000 $295.000 $319.150 $275.000 $1,850.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $275.000 $315.000 $450.000 $365.000 $537.500 $800.000 $413.000 $319.150 $385.000 $1,850.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $650.000 $720.000 $950.000 $780.000 $949.020 $3,000.000 $885.000 $1,063.830 $825.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $15,000.000 $8,500.000 $9,500.000 $7,880.000 $10,000.000 $12,000.000 $8,938.500 $10,265.960 $8,400.000 $15,000.000
CONDT (PVC) (SCH 40) (2")
LF 1,020.000 $7.500 $11.000 $12.000 $11.250 $14.770 $12.000 $12.690 $11.440 $12.000 $15.000
CONDT (PVC) (SCH 40) (3")
LF 260.000 $10.000 $14.000 $15.000 $14.250 $19.610 $15.250 $16.110 $14.520 $15.000 $18.000
ELEC CONDR (NO.8) BARE
LF 10,250.000 $1.000 $1.500 $1.500 $1.350 $1.380 $1.500 $1.530 $1.380 $1.500 $3.000
ELEC CONDR (NO.4) BARE
LF 270.000 $2.000 $1.800 $2.000 $1.800 $1.940 $2.000 $2.010 $1.810 $2.000 $3.000
ELEC CONDR (NO.4) INSULATED
LF 540.000 $2.000 $1.900 $2.000 $1.800 $1.990 $2.000 $2.010 $1.810 $2.000 $3.000
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 1.000 $5,000.000 $7,000.000 $7,000.000 $6,775.000 $6,387.110 $7,500.000 $7,670.000 $6,914.890 $7,150.000 $6,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $440.000 $500.000 $1,000.000 $905.000 $499.880 $1,000.000 $1,026.600 $925.530 $650.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 9.000 $590.000 $670.000 $1,100.000 $1,000.000 $671.880 $1,100.000 $1,144.600 $1,031.910 $650.000 $850.000
REMOVE SM RD SN SUP&AM
EA 4.000 $50.000 $170.000 $250.000 $250.000 $161.250 $250.000 $259.600 $234.040 $250.000 $250.000
REMOVE SIGN WALKWAY
EA 4.000 $1,100.000 $1,400.000 $2,500.000 $2,250.000 $1,343.750 $2,400.000 $2,548.800 $2,297.870 $2,376.000 $250.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 12.000 $80.000 $47.000 $70.000 $65.000 $48.380 $90.000 $70.800 $47.870 $66.000 $100.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 370.000 $1.000 $1.700 $2.200 $1.550 $2.150 $3.100 $2.360 $1.600 $1.650 $3.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,422.000 $1.500 $1.150 $2.200 $1.050 $2.150 $2.500 $2.360 $1.060 $1.100 $3.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 538.000 $1.500 $2.300 $4.500 $2.100 $4.300 $3.750 $4.720 $2.130 $2.200 $5.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 1,082.000 $1.250 $1.200 $2.200 $1.050 $2.150 $2.500 $2.360 $1.060 $1.100 $3.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,526.000 $2.000 $1.800 $0.900 $1.550 $0.860 $0.750 $2.120 $1.600 $1.650 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 617.000 $4.000 $2.900 $4.000 $2.650 $3.760 $3.750 $4.130 $2.660 $2.750 $5.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 571.000 $1.500 $1.800 $1.100 $1.550 $1.080 $1.000 $1.180 $1.600 $1.650 $2.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 435.000 $3.000 $2.900 $4.000 $2.650 $3.760 $3.750 $4.130 $2.660 $2.750 $5.000
RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL)
LF 140.000 $2.000 $5.800 $6.000 $5.250 $5.380 $5.500 $5.900 $5.320 $5.500 $6.000
PAVEMENT SEALER 4"
LF 5,611.000 $0.300 $0.180 $0.200 $0.160 $0.220 $0.250 $0.240 $0.160 $0.170 $0.500
PAVEMENT SEALER 8"
LF 3,097.000 $0.500 $0.350 $0.600 $0.300 $0.540 $0.500 $0.590 $0.320 $0.330 $1.000
PAVEMENT SEALER 12"
LF 1,052.000 $2.000 $0.520 $1.700 $0.500 $1.610 $1.500 $1.770 $0.480 $0.500 $2.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 850.000 $1.000 $1.200 $2.200 $1.050 $2.150 $2.500 $2.360 $1.060 $1.100 $3.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,922.000 $0.500 $0.820 $2.200 $0.750 $2.150 $2.500 $2.360 $0.740 $0.770 $3.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,699.000 $0.500 $0.820 $2.200 $0.750 $2.150 $2.500 $2.360 $0.740 $0.770 $3.000
REFL PAV MRKR TY II-C-R
EA 306.000 $4.000 $4.400 $6.000 $3.950 $5.380 $6.250 $5.900 $4.040 $4.180 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,773.000 $0.350 $0.470 $0.350 $0.450 $0.320 $1.500 $1.530 $0.430 $0.440 $1.000
PAV SURF PREP FOR MRK (4")
LF 8,485.000 $0.250 $0.070 $0.050 $0.050 $0.050 $0.250 $0.060 $0.050 $0.060 $1.000
PAV SURF PREP FOR MRK (8")
LF 3,635.000 $0.350 $0.130 $0.100 $0.100 $0.110 $0.400 $0.120 $0.110 $0.110 $1.000
PAV SURF PREP FOR MRK (12")
LF 1,052.000 $1.500 $0.180 $0.600 $0.160 $0.540 $1.100 $0.590 $0.160 $0.170 $1.000
D-GR HMA TY-B PG64-22
TON 812.000 $110.000 $79.000 $119.000 $81.000 $94.000 $100.000 $105.610 $75.400 $105.000 $140.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $14,000.000 $6,000.000 $10,000.000 $11,000.000 $16,500.000 $14,956.500 $15,319.160 $20,000.000 $16,500.000
FO CBL (36 SMF)
LF 1,550.000 $3.500 $5.000 $5.000 $4.900 $12.960 $5.250 $5.550 $5.000 $5.170 $20.000
FO CBL (72 SMF)
LF 22,400.000 $3.500 $1.600 $1.600 $1.500 $5.050 $1.600 $1.650 $1.490 $1.540 $10.000
FO SPLICE ENCLOSURE (TYPE 1)
EA 6.000 $1,500.000 $2,100.000 $2,200.000 $2,025.000 $1,586.430 $2,150.000 $2,301.000 $2,074.470 $2,145.000 $2,500.000
FIBER OPTIC FUSION SPLICE
EA 276.000 $47.000 $72.000 $70.000 $72.000 $46.630 $76.250 $81.720 $73.670 $76.180 $65.000
REMOVE FIBER OPTIC CABLE
LF 11,425.000 $1.000 $3.000 $3.600 $2.850 $1.040 $3.250 $3.260 $2.940 $3.040 $2.000
ITS GRND MNT CAB (TY 4) (CONF 2) (REM)
EA 1.000 $1,500.000 $1,700.000 $1,900.000 $1,650.000 $1,585.630 $2,000.000 $1,888.000 $1,702.130 $1,760.000 $2,500.000
ITS GRND MNT CAB (TY 6) (CONF 2) (REM)
EA 1.000 $1,500.000 $2,100.000 $2,100.000 $2,000.000 $1,585.630 $2,500.000 $2,242.000 $2,021.280 $2,090.000 $2,500.000
ITS MULTI-DUCT CND (PVC-40)
LF 7,150.000 $17.000 $19.500 $22.000 $18.750 $24.670 $19.800 $21.220 $19.130 $19.780 $30.000
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 1,200.000 $32.000 $26.000 $25.000 $24.500 $42.270 $26.250 $28.030 $25.270 $26.130 $60.000
CONDUIT (PREPARE)
LF 10,680.000 $1.700 $6.000 $7.000 $5.750 $1.440 $6.150 $6.510 $5.870 $6.070 $3.000
GROUND BOX (PREPARE)
EA 30.000 $350.000 $600.000 $600.000 $595.000 $586.950 $630.000 $674.960 $608.510 $629.200 $650.000
REMOVE EXISTING CABLES (POWER)
LF 4,685.000 $3.500 $0.600 $0.600 $0.550 $2.340 $0.750 $0.650 $0.590 $0.610 $3.000
REMOVE EXISTING CABLES (COMMUNICATION)
LF 1,300.000 $3.500 $1.300 $1.200 $1.150 $2.340 $1.250 $1.300 $1.170 $1.210 $3.000
TMA (STATIONARY)
DAY 120.000 $200.000 $145.000 $130.000 $162.500 $175.000 $200.000 $212.400 $204.260 $250.000 $550.000
TMA (MOBILE OPERATION)
HR 8.000 $40.000 $75.000 $60.000 $250.000 $75.000 $300.000 $64.290 $79.790 $75.000 $85.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 3.000 $2,200.000 $3,700.000 $4,000.000 $3,700.000 $4,556.330 $4,000.000 $4,161.860 $3,752.130 $3,879.700 $5,000.000
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 2.000 $3,500.000 $5,000.000 $5,500.000 $5,000.000 $7,038.240 $5,500.000 $5,648.660 $5,092.550 $5,265.700 $7,000.000
REMOVE ITS GROUND BOX
EA 6.000 $975.000 $550.000 $600.000 $550.000 $1,251.030 $575.000 $606.520 $546.810 $565.400 $1,500.000
LCS SIGNAL UNIT (REMOVE)
EA 11.000 $1,300.000 $2,800.000 $3,300.000 $2,700.000 $401.510 $2,850.000 $3,044.400 $2,744.680 $2,838.000 $500.000
Totals: $1,680,876.370 $1,779,729.960 $1,792,313.000 $1,811,700.380 $1,824,313.030 $1,908,617.100 $1,990,018.688 $2,003,457.631 $2,099,625.620 $2,773,665.500